Now it’s Australia’s turn.

Beetaloo Energy holds a Northern Territory shale gas position comparable in size to the core regions of the Marcellus. The Carpentaria Gas Plant is being commissioned in the fourth quarter of 2026, ahead of the company’s first gas sales.

Why the Beetaloo is different

Shale gas is produced from rock, not from a pool underground. How much gas a well can reach depends on how much gas-bearing rock it passes through. The Beetaloo’s Velkerri shale is stacked — four separate gas-bearing layers, one above the other — so a single pad here can reach far more rock than a conventional single-layer shale.

Marcellus Shale, USA ~60 m
Velkerri Shale, Beetaloo >300 m net

How the gas actually gets out

Shale gas is not pumped from a pool. It is locked inside rock that has to be opened up before anything will flow. Here is the whole route, from the drill bit to the pipeline.

B SHALE, VELKERRI FORMATION Carpentaria Gas Plant Northern Territory East coast LNG export

A well is drilled down through the rock, then steered sideways so it runs along inside the gas-bearing shale — the more shale it passes through, the more rock it can drain. Carpentaria-5H reached a total measured depth of 5,310 metres, including a 3,310-metre horizontal section placed inside the B Shale of the Velkerri Formation.

Shale is too tight for gas to move through on its own. Water and sand are pumped down under pressure, one stage at a time, opening narrow fractures that the gas can travel along; the sand holds them open afterwards. C-5H was stimulated across 2,955 metres in 67 stages using roughly 10,000 tonnes of sand — the largest fracture stimulation performed in the Beetaloo Basin.

The well is then opened up and measured, which is what tells you whether the rock will pay. Over the 30 days from 11 June 2026, Carpentaria-5H averaged 6.9 TJ a day, peaked above 14 TJ a day, and was still flowing 6.7 TJ a day at the end of the test.

Gas from the wells is dried and cleaned before it can be sold. That happens at the Carpentaria Gas Plant, which Beetaloo owns outright rather than renting from a third party — it is being commissioned in the fourth quarter of 2026, and it is what turns appraisal gas into revenue.

From the plant the gas enters the pipeline network, and where it goes is a matter of scale. The pilot supplies up to 25 TJ a day into the Northern Territory. The planned domestic project is about 200 TJ a day for the east coast. Full field development is about 1 BCF a day for LNG export — that gas is chilled to roughly minus 162°C at a liquefaction plant, which shrinks it about 600-fold so it can be shipped. Beetaloo supplies the gas; it does not build the LNG plant.

Three markets this gas is being built for

The Northern Territory

A binding 10-year Gas Sales Agreement with the Northern Territory Government already covers the pilot. Carpentaria is designed to supply up to 25 TJ a day into the Territory’s domestic market, where existing supply is declining.

Australia’s east coast

AEMO forecasts southern-state gas supply falling sharply from 2028, with the gap increasingly filled by gas flowing south from Queensland and the Northern Territory. Beetaloo sits at the top of that pipe.

Asian LNG

Darwin is about four sailing days from Tokyo Bay, against twenty-one from the US Gulf Coast. Asian LNG netback has been trading at several times the US Henry Hub price, and a global LNG supply deficit is forecast from the mid-2030s.

Where the project stands, and what happens next

DONE — JUNE 2026

Carpentaria-5H IP30 flow test

The 30-day production test began on 11 June 2026 and averaged 6.9 TJ a day, peaking above 14 TJ a day and closing at 6.7. It followed the longest hydraulic stimulation ever performed in the Beetaloo — 67 stages across a 2,955 metre horizontal section.

NEXT — Q4 2026

Carpentaria Gas Plant commissioning

Carpentaria-2H, -3H and -5H tie into the 100%-owned Carpentaria Gas Plant. Owning the plant outright removes third-party dependency and is what lets appraisal gas be sold rather than flared.

THEN

First pilot gas sales

Gas flows to the Northern Territory under a binding 10-year Gas Sales Agreement, supplying up to 25 TJ a day — Beetaloo Energy’s first revenue.

Energy for the Territory. Opportunity for Australia.