Managing Director's Address to AGM
Released
Released
Announcement PDF
ASX:EEG
Empire Energy – Beetaloo Basin – On the Path to Pilot Production and Beyond
Managing Director’s Presentation to the 2023 Annual General Meeting
Global & Australian Gas Market Imbalances Increasing
• Shell estimates global LNG demand will reach 700 million tonnes by 2040 (2022: 396mt)1. Gas will be needed in the long term to
balance energy systems as the world transitions to a lower emission future
• Shell notes that more investment in liquefaction projects is required to avoid a supply-demand gap that is expected to emerge
by the late 2020s
• While natural gas accounts for about a quarter of global electricity generation, half the total natural gas produced today is
consumed in sectors other than power generation
• Australian Minister for Resources and Northern Australia Hon. Madeleine King noted that “Here in Australia, gas provides the
flexibility we need to add more renewables to the grid, and is a vital feedstock and heat source for our industrial base” 2
• Kevin Gallagher, Santos Managing Director said “The main game is gas because it makes renewables possible, it provides
feedstock for fertilisers and chemicals, and it fires the high temperature furnaces required for bricks and cement”3
1. Shell LNG Outlook 2023
2. https://www.afr.com/politics/federal/gas-will-be-needed-for-decades-minister-launches-strident-defence
3. The Australian “Santos boss Kevin Gallagher says gas is the key to moving to net zero, not renewables” dated 18 May 2023
1
The Beetaloo is Australia’s largest Undeveloped Gas Resource
• Total potential Prospective Resources in the Velkerri B shale of between 50
TCF and 100 TCF (one of five productive shale units) based on Government
estimates of 500 TCF gas-in-place (assuming recovery factors of between
10% and 20%)
Beetaloo Basin
+500 TCF
GIIP
• Large enough to supply both LNG and east coast markets
• Empire (100%) NT 2C Contingent Resource of 1,906 PJ (1.63
Amadeus Basin
TCF) gas and 3.5 MMBBLs liquids1
0.22
29.3
Cooper Basin
• Empire (100%) EP187 2C Contingent Resource of 1,739 PJ (1.5
1.0
TCF) at an average EUR per well location of 7.9 PJ
Bowen &
Surat Basins
• Empire (100%) P(50) Prospective Resource of 44,541 PJ (41.67
TCF) gas and 764 MMBBLs liquids1,2
Source: Netherland, Sewell & Associates Inc
1. Western Beetaloo 1.06 PJ per BCF applied
2. Barney Creek – McArthur Basin targets, 1.06 PJ per BCF applied
Otway Basin
Gippsland Basin
0.6
0.02
1.7
Beetaloo Velkerri B GIIP Estimate
Bass Basin
(SEAAOC 15 November 2018)
2P Reserves (TCF)
(Energy Quest as at 31 March 2023)
2
Growth in Certified 2C Contingent Resources
Empire’s on ground activities have grown discovered resources to an LNG Scale
EP187 Contingent Resources (100%) as at
May 2023
Net Sales Gas (PJ)
Low Estimate Best Estimate
(1C)
(2C)
Key Drivers
of 2C Uplift
▪
▪
Carpentaria-1 drill
Pangaea
acquisition
▪
▪
▪
Carpentaria-1 EPT
▪
Carpentaria-2H drill ▪
Charlotte 2D seismic
survey
▪
High
Estimate
(3C)
Total
304
1,739
3,507
Average EUR Per Development
Well
6.2
7.9
9.3
Indicative Pilot Development Well
Cost ($20m per well)
$3.23 / GJ
$2.53 / GJ
$2.15 / GJ
Indicative Full Field Development
Well Cost ($15m per well)
$2.42 / GJ
$1.90 / GJ
$1.61 / GJ
Carpentaria-2H EPT
Carpentaria-3H drill
and EPT
Carpentaria-4V drill
3
Note: Refer to EEG announcement dated 29 May 2023 for Netherland, Sewell & Associates, Inc. Contingent and Prospective Resources
Government supporting the Beetaloo
NT Government has given industry a green light to move into production
Federal Government has exempted smaller companies from gas market intervention
Nicole Manison (NT Deputy Chief
Minister):
• NT Government has completed the Pepper Inquiry regulatory implementation process, finalising “There’s been a huge amount done
the regulatory settings to allow the commencement of commercial production in the Beetaloo
by the other gas companies around
• NT Chief Minister, Hon. Natasha Fyles said: “Along with our world-class renewable resources, our the Beetaloo but when you have a
highly prospective onshore gas resources will support our energy security during the transition to
look at the pace Empire’s going, all
1
renewables – and will improve living standards for all Territorians”
doing it within the rules, conditions
and regulations but you can see it is
Amendments to Federal Gas Industry Code of Conduct
advancing very well.”2
NT Government supports the development of the onshore gas industry
• Small producers (less than 100 PJ p.a. or equivalent to $1.2bn in revenue at $12/GJ) are now
exempted from the gas price cap and reasonable pricing provision provided they supply the
domestic market
2. NT News, “Empire building: Project on track with production timetable”
dated 28 July 2022
Beetaloo Cooperative Drilling Program
• $13.2 million cash received to date. A further $2.1m expected shortly
Darwin Middle Arm Sustainable Development Precinct (supported by Beetaloo gas)
• A$1.5 billion commitment made by both major parties to support expanded port infrastructure at
•
Darwin. Includes A$300 million for production of clean LNG and hydrogen; and A$550 million for
renewable energy supply, CCUS and other technologies
On 17 May 2023, NT Government announced shared carbon capture utilisation and storage
commitment for Middle Arm
Carpentaria-2H flare
1. NT Government press release dated 3 May 2023 “Creating Energy Security through Rigorous Accountability”
4
LNG Scale Discovered Resource
Material discount to market peers versus Reserves & Resources
Scale
• Empire has the largest 2C Contingent Resources position
for ASX listed energy companies in the Beetaloo
• NSAI certified Estimated Ultimate Recovery of ~8 PJ per well
for 2C Contingent Resources
Growth
• >200 identified development well locations at Carpentaria
Project (Velkerri B and C shales only)
• Conversion of 2C Contingent Resources to 2P Reserves with
pilot project
Opportunity
• Grow market capitalisation through pilot project delivery
• Attract a JV partner to deliver LNG-scale volumes
• Empire has a 2P plus 2C position approximately 2x Strike
Energy with 1/8 of the market capitalisation
Sources:
1. Share prices as at 26 May 2023
2. Net debt / (cash) as at 31 March 2023 Quarterly Statements
3. 2P reserves and 2C contingent resources per relevant company ASX releases
4. BCF to PJ conversion of 1.06
5
Large Pilot Development and Appraisal Position (100% EEG)
Empire has two large scale appraisal and pilot development
projects across the Beetaloo Sub-basin connected to infrastructure
• Carpentaria – Pilot Development
• Covers 110,000 acres
• Fully delineated with 2D seismic, two horizontal stimulated wells, one
vertical multistage simulated well, one step-out vertical well and three
Extended Production Tests
• Focused on FID for pilot project in 2023 and construction in 2024
• 2C Contingent Resource 1,739 PJ (~1.5 TCF)
• 2U Prospective Resource 3,542 PJ (~3.0 TCF)
• Western Beetaloo – Appraisal
• Large, extensive play covering ~1m acres
• Delineated by five spatially drilled
wells, ~1,800 metres of core and
>1,000 km 2D seismic acquired
• Further de-risked by activity in
Carpentaria (same rock)
• 2U Prospective Resource ~28 TCF
One of only three operators in the Basin
6
Empire’s Beetaloo Footprint Comparable to Marcellus
• Empire’s Beetaloo footprint is comparable in size to significant
portions of the core areas of the Marcellus Shale play in the
Appalachian Basin
• More than 9,000 wells are producing from similar depths to
Empire Beetaloo play (~34 percent of all Marcellus wells)1
across both core areas
• The majority of the more than 27,000 producing Marcellus
Shale wells are less than 2,250 metres below ground level
• Marcellus shale producing acreage has typically transacted
“Marcellus shale
gas production has
grown by 25 BCF/d
over ten years”
BCF/d
at US$5,000 to US$25,000 per acre2. Empire is valued at ~US$80
per acre based on the Carpentaria Project and Western
Beetaloo Project alone
Source: U.S. Energy Information Administration - EIA - Independent Statistics and Analysis
1. EIA and relevant State databases
2. https://mercercapital.com/energyvaluationinsights/ma-in-marcellus-utica-basins-2
Insert map: Empire’s base Velkerri B Shale at same scale as base Marcellus Shale map
7
Empire’s First Horizontal Well Flow Test A Success
• Carpentaria-2H (“C-2H”) produced a total of 323 TJ (281 mmscf)
over 127 days
Stylised Schematic
Vertical
Exaggeration 5:1
Without Vertical Exaggeration
C-2
Carpentaria-2H is the fourth horizontal well in the basin, was drilled 100% within zone, and
successfully flowed gas to surface from all 21 frac stages
day for an equivalent 3,000m horizontal development well for
the entire test period
• Gas composition remained consistent with high calorific value and
extremely low CO2 (less than 1%)
• C-2H was brought back online after an initial 51 days of testing to
test the benefit of soaking with excellent results
B Shale
65m (~213 ft)
• This equates to a normalised rate of 8.25 TJ (7.2 mmscf) per
Target depth
1,600m (5,250 ft)
1,345m (4,411 ft) Horizontal Section
• The post-soak 2023 IP30 is confirmed at 10.5 TJ (9.2 mmscf) per
day for an equivalent 3,000 metre horizontal development well
• Completed without the need for production tubing, well freeflowed through 4 ½” casing. Empire is likely to move to 5 ½” in
future scenarios
• These rates exceed the benchmark other Beetaloo players have
put forth as commercial, at a capital cost of ~half of Empire’s peers
Carpentaria-2H flare
8
Carpentaria-2H Flow Rate in Context
Replication of Carpentaria-2H would achieve production rates exceeding 10.5 TJ / day
IP(30) for 3,000 metre development wells
9
Record Breaking Carpentaria-3H Horizontal Well
Carpentaria-3H is the longest horizontal shale well, and the largest frac job ever executed
in Australia, on time and ~$6m under budget
• Carpentaria-3H drilled to total depth of 4,460m (14,629 ft) on time
Stylised Schematic
Vertical
Exaggeration 5:1
Without Vertical Exaggeration
and under budget
• Total horizontal lateral length of 2,632m (8,633 ft), with 2,374 m
2,632m (8,633 ft) Horizontal Section
• Confirming long horizontals can be drilled in the Beetaloo
• Carpentaria-3H successfully stimulated, significantly below
C-2
(7,786 ft) successfully placed within the target Velkerri B shale (90%
in zone), with strong gas shows throughout the target zone
budget, executing all planned 40 stages across 1,989m (6,526 ft)
Target depth 1,750m (5,250 ft)
• A total of 12.8 million lbs of proppant placed, averaged 319,000
lbs per stage (~2,000 lbs/ft). Comparable to US Shale frac
intensity
• Carpentaria-3H has been flow tested for 27 days and is currently
shut in for soaking. Gas production rate has ranged between 2.6 TJ
(2.3 mmscf) per day and 6.6 TJ (5.7 mmscf) per day with an
average of 3.0 TJ (2.6 mmscf) per day
• Flow rates are yet to be optimised by the shut-in and soaking that
has proven to be effective at Carpentaria-2H. Empire believes that
higher flow rates will be achieved when the well is reopened
10
SLB 185 Rig drilling Carpentaria-3H in EP187
Exploration & Appraisal has Delivered Carpentaria Pilot Ready
Empire’s focused, systematic and scientific approach to evaluating and de-risking the
Velkerri Shale play in EP187 has proved a large resource in a cost-effective manner
• 4 wells drilled have delineated a very large, discovered resource
• $100m invested has delivered >1,739 PJ (~1.5 TCF) discovered resource
• 2 fracked horizontal sections drilled, and flow tested with excellent results
• Vertical Carpentaria-1 and Carpentaria-4V confirmed stacked play
• All drilling programs executed for ~50% of the cost of Beetaloo peers
• Corporate overhead well below most comparable ASX peer
• Gas resource scale and productivity now established to move into pilot production
• 2D seismic coverage has mapped Velkerri shale at favourable depths across 110,000
acres
• There are hundreds of drilling locations across Carpentaria and Carpentaria East fault
blocks with multiple wells from each pad to minimise surface disturbance
11
Western Beetaloo Work Program
Clearances are underway for a multi-year seismic, drilling and stimulation program across
the >1 million acre Velkerri Shale play in Western Beetaloo
• Planned appraisal activities are focused within the Gas Discovery Area
where $110 million spent by previous operator (acquired by Empire for
$57 million primarily in equity during 2021)
• Same rocks as Carpentaria
• Strategically located near gas pipeline, highway and rail line
• Environmental approvals submitted to the Regulator for:
- The acquisition of up to ~380 km in-fill 2D seismic orientated for
future horizontal wells
- Clearance for drilling, stimulation and flow testing of up to six
horizontal wells on six well pad locations
• Land access agreements executed with pastoralists
• The approvals have the potential to accommodate numerous
production wells in a future commercial development scenario
• Current 2C Contingent Resource of 167 PJ1 (157.5 BCF) (+3.5 MMBBLS)
• Current 3C Contingent Resource of 441 PJ1 (415.8 BCF) (+14.1 MMBBLs)
• Current P(50) Prospective Resource of ~28 TCF and 764 MMBBLs
1. 1.06 PJ per BCF applied by Empire
EP 167 and EP 168 100% EEG
12
Working Sustainably to Develop the Beetaloo
Empire is responsibly developing its Beetaloo gas resources
• Empire’s forecast Greenhouse Gas (“GHG”) emissions have been
independently reviewed based on recent appraisal results, planned field
development assumptions and the National Greenhouse and Energy
Reporting framework1
• Empire’s Scope 1 emissions based on this analysis will include:
- Fuel combustion e.g. gas for power, diesel use
- Fugitive emissions associated with operations (aim to minimise)
• Empire estimates its Scope 1 offsetting obligation is less than 5% of gross
revenue (at $10/GJ gas price) for Carpentaria’s full field economic life at the
Australian Government’s carbon price cap ($75 per tonne indexed at 2%
p.a. plus CPI). This obligation is ~2% of gross revenue at the current Australian
Carbon Credit Unit (“ACCU”) price1
- Empire has commenced engagement with ACCU supply counterparties
• Carpentaria CO2 reservoir levels are extremely low (less than 1%)
• Empire maintains strong relationships with Traditional Owners (“TO”) on whose
land it operates with their full, informed and prior consent
- ~30 on-county meetings held with TOs to date. NLC exploration
payments paid for the benefit of TOs and thousands of hours of
employment for TOs to date
13
1. Estimates have been independently reviewed by HRL Technology Group Pty Limited (https://www.hrlt.com.au)
Access to Market & Customers
• APA Group (ASX: APA) and Empire are continuing to explore the
potential development of Beetaloo mid-stream infrastructure
including gas and liquids gathering, processing and pipelines, as
described in Empire’s ASX release dated 27 October 2021
• APA is considering a new pipeline from the Beetaloo to Mount Isa to
connect large volumes from the Beetaloo to the existing east coast
gas network, connecting Beetaloo gas resources to Wallumbilla,
Brisbane, Sydney and Melbourne, and LNG export through
Gladstone
• The new potential pipeline would be a multi-user, open access
pipeline and is expected to offer attractive transport tariffs to
support east coast deliveries, due to increased scale and shorter
distance to market than existing routes
• APA owns the existing Amadeus Gas Pipeline to Darwin and a
‘Northern Strategy’ is also being assessed to support the
development of a possible gas-fed manufacturing industry and
LNG export backfill / expansion opportunities at Darwin
• Negotiations with NT Government owned utility Power and Water
Corporation under the existing MOU are advancing to facilitate
access to the McArthur River Pipeline
• Empire is currently in active gas sales negotiations with multiple
parties for supply of gas in both the pilot phase and full
development phase
14
Pathway to Carpentaria Pilot Project Production and Revenue
EXPLORATION & APPRAISAL
2021
2022
✓ 2C Contingent Resource: 575 BCFe
✓ 2U Prospective Resources: ~48 TCFe
✓ Gas Sales & Transportation: APA Group and Power and Water Corporation MoUs Executed
✓ Established $15 million credit facility with Macquarie Bank to move to project financing
KEY ACTIVITIES TO CARPENTARIA PILOT PROJECT FID
✓ Major Contingent Resource upgrade announced for EP187
✓ Carpentaria-2H flow rates: normalised IP30 of 10.5 TJ (9.2 mmscf) per day for an equivalent 3,000m horizontal
2023
development well
✓ Carpentaria-4V: intersected the same stacked Velkerri Formation shales as the Carpentaria Project wells thereby opening
the Carpenaria East Area
1. Front End Engineering & Design (“FEED”): including engineering, economic modelling etc
• Pilot development (up to 25 TJ/d) – over $90m revenue per annum @ $10/GJ
2. Subsurface design planning
3. Execute gas sales and transportation agreements – discussions ongoing with multiple parties
4. Arrange financing for pilot (Macquarie Bank credit facility already in place)
5. Obtain government approvals: NT Petroleum Production Licence over Carpentaria
6. Negotiate Northern Land Council (“NLC”) Production Agreement with Traditional Owners
POST FID
2024
1.
Pilot project construction
2025
1.
2.
First gas sales
Planning to move to full development (200 TJ/d+ to East Coast then >1 PJ / day LNG export via Darwin)
15
ASX:EEG
https://empireenergygroup.net/
Alex Underwood
Managing Director
info@empiregp.net
+612 9251 1846
16
Appendix 1: Corporate Snapshot
ASX Share Price
Capital Structure
Shares on issue1
773.1M
Share price
A$0.195
Market cap
A$150.8m
Net (debt2) / cash
~A$8.4m
Enterprise value
~A$142.4m
Cash at bank3
~A$16.3m
Total Available Liquidity3
~A$26.3m
Top Shareholders
Pangaea Resources
18.1%
Elphinstone Group
8.3%
• Top 20 shareholders own 61.9%
Global Energy and Resources
4.2%
Sheffield Holdings (USA)
4.1%
• Top 50 shareholders own 70.6%
Energy and Minerals Group (USA)
3.4%
Macquarie Bank
3.4%
•
1.
2.
3.
4.
Board of Directors owns 21.0%4
Empire has 78.9m unlisted options on issue with an average exercise price of ~A$0.39 per share. In addition, there are 18.6m Share Rights on issue to members of the management team and Board. Most of the Share Rights have performance hurdles tied to total shareholder return.
Empire has a US$7.5 million debt facility (drawn to US$5.16 million) with Macquarie Bank maturing in September 2024 which is secured against the Company’s USA gas production assets. Under new management, total debt has been reduced by over 80% since 2018. On 30 November 2022 Empire
announced it had established a A$10 million revolving credit facility and A$5 million performance bonding facility with Macquarie Bank. This facility is undrawn
As at 29 May 2023
Board shareholding includes Mr Paul Fudge (Pangaea) and vested Performance, Restricted and Service Rights
17
Appendix 2: Empire’s Board of Directors
Paul Espie AO
Peter Cleary
Alex Underwood
Paul Fudge
Jacqui Clarke
Louis Rozman
Prof. John Warburton
Chairman & NonExecutive Director
Non-Executive Director
Managing Director
Non-Executive Director
Alternate Director to Paul
Fudge
Non-Executive Director
Non-Executive Director
• Distinguished 29-year
career representing
Santos, the North West
Shelf Venturers and BP in
Asia. His executive
career was in LNG,
pipeline gas and
chemicals operations
• Associate Director
Energy Markets Division
of Macquarie Bank
Limited (Sydney and
Singapore)
• Controlling shareholder
of Pangaea
• Former Managing
Director of CH4 Gas
which merged with
Arrow Energy and later
acquired by PetroChina
and Shell
• Highly regarded
petroleum geoscientist
experienced in big fields
• Founding principal of
Pacific Road Capital,
a resources investing
manager of private
equity funds
• Former Chairman of
Oxiana Ltd during the
development of the
Sepon copper/gold
project in Laos
• Former Chairman of
Cobar Mines Pty
Limited after a
management buyout
• Former Head of Bank
of America operations
in Australia, New
Zealand and PNG
• Retiring at today’s
Annual General
Meeting
• Member of the
Executive Committee of
the Australia Japan
Business Co-operation
Committee and the
Australia Korea Business
Council
• Incoming Chairman
• Director Natural
Resources Division of
Commonwealth Bank of
Australia (Singapore)
• Financial Analyst BHP
Billiton Petroleum (Perth)
• Experience investing
debt and equity in the
upstream oil and gas
sector and identification
of value creation
opportunities for
upstream oil and gas
development /
production assets
• Significant investment
experience in onshore
Australian oil & gas,
including being an
early mover in the
Queensland Coal
Seam Gas industry and
in the Beetaloo SubBasin
• Paul brings significant
business and
investment experience
to the Board of Empire
• 30 years professional
services experience,
with over 15 years as a
Partner at Deloitte.
• Jacqui is a Chartered
Accountant and Fellow
of the Institute of
Chartered Accountants,
Graduate of AICD
(Australian Institute of
Company Directors),
Chartered Tax Advisor
and Justice of the
Peace
• Founding principal of
Pacific Road Capital, a
resources investing
manager of private
equity funds
• 30 years technical &
leadership experience in
leading E&P companies
including BP, LASMO-Eni
and Oil Search
• Previously Chief of
Geoscience & Exploration
Excellence for Oil Search
• Former Chief Operating
Officer of AurionGold
Limited
• Chairman of the
VALMIN Code
Committee for the
AusIMM and Australian
Institute of Geoscientists
18
Appendix 3: A Globally Significant Resource Position
Contingent Resources
(Liquids)
Contingent
Resources (Gas)
Prospective
Resources (Gas)
Prospective Resources(Liquids)
Low Estimate
(1C)
Best Estimate
(2C)
High Estimate
(3C)
Low Estimate
(1C)
Best Estimate
(2C)
High Estimate
(3C)
Low Estimate
(1U)
Best Estimate
(2U)
High Estimate
(3U)
Low Estimate
(1U)
Best Estimate
(2U)
High Estimate
(3U)
mmbbls
mmbbls
mmbbls
PJ
PJ
PJ
mmbbls
mmbbls
mmbbls
PJ
PJ
PJ
Kyalla
0.8
3.0
11.1
0.8
4.8
29.4
88
378
1,571
195
908
5,184
Mid Velkerri
0.1
0.5
3.0
364.3
1,901.4
3,916.8
76
386
1,938
10,454
31,916
92,236
Barney Creek
-
-
-
-
-
-
-
-
-
1,731
11,716
48,103
Total
0.9
3.5
14.1
365.2
1,906.1
3,946.1
164
764
3,509
12,380
44,540
145,523
Shale Unit
Empire 2C Contingent Resource of 1,906 PJ (1,625 BCF gas) and 3.5 MMBBLs liquids
Empire P(50) Prospective Resource of 44,541 PJ (42 TCF gas) and 764 MMBBLs liquids
Note: Refer to EEG announcement dated 29 May 2023 for Netherland, Sewell & Associates, Inc. Contingent and Prospective Resources
Estimate of BCF to PJ undertaken by Empire of 1.06
19
Disclaimer
This presentation has been prepared by Empire Energy Group Limited (“Empire” or the “Company”). The information in this presentation is information of a general nature and is subject to
change without notice. The information in this presentation does not purport to be complete, nor does it contain all of the information which would be required in a prospectus prepared in
accordance with the requirements of the Corporations Act 2001 (Cth). It contains information in a summary form only and should be read in conjunction with Empire’s other periodic
disclosure announcements to the ASX available at www.asx.com.au.
An investment in Empire shares is subject to known and unknown risks, many of which are beyond the ability of Empire to control or predict. These risks may include, for example, movements
in oil and gas prices, a failure to acquire some or all of the targeted acreage, risks associated with the development and operation of the acreage, exchange rate fluctuations, an inability to
obtain funding on acceptable terms or at all, loss of key personnel, an inability to obtain appropriate licences, permits and or/or other approvals, inaccuracies in resource estimates, share
market risks and changes in general economic conditions. Such risks may affect actual and future results of Empire and its shares.
This presentation contains statements, opinions, projections, forecasts, and other material (“forward looking statements”). These statements can be identified by the use of words like
‘anticipate’, ‘believe’, ‘intend’, ‘estimate’, ‘expect’, ‘may’, ‘plan’, ‘project’, ‘forecast’, ‘will’, ‘should’, ‘could’, ‘seek’ and other similar expressions. Forward looking statements may be based on
assumptions which may or may not prove to be correct. None of Empire, its respective officers, employees, agents, advisers or any other person named in this presentation makes any
representation as to the accuracy or likelihood of fulfilment of the forward looking statements or any of the assumptions upon which they are based and disclaim any obligation or undertaking
to revise any forward looking statement, whether as a result of new information, future event or otherwise.
Maps and diagrams contained in this presentation are provided to assist with the identification and description of Empire’s lease holdings and Empire’s intended targets and potential
exploration areas within those leases. The maps and diagrams may not be drawn to scale and Empire’s intended targets and exploration areas may change in the future.
All financial information is in Australian dollars unless stated otherwise.
The information contained in this presentation does not take into account the investment objectives, financial situation or particular needs of any recipient and is not financial product advice.
Before making an investment decision, recipients of this presentation should consider their own needs and situation and, if necessary, seek independent professional advice.
To the maximum extent permitted by law, Empire and its respective officers, employees, agents and advisers give no warranty, representation or guarantee as to the accuracy, completeness or
reliability of the information contained in this presentation. Further, none of Empire nor its respective officers, employees, agents or advisers accept, to the extent permitted by law,
responsibility for any loss, claim, damages, costs or expenses arising out of, or in connection with, the information contained in this presentation. Any recipient of this presentation should
independently satisfy themselves as to the accuracy of all information contained herein.
20