Empire Energy – The Beetaloo Basin Pioneer moving into Production
Managing Director’s Presentation to the 2024 Annual General Meeting
Empire Energy Investment Case
The Beetaloo Basin Focused Gas Development Company
• The Beetaloo’s Velkerri Shale is an enormous (>500 TCF) low CO2 shale gas resource located in Northern Australia close to Asian
LNG markets and existing export infrastructure
• The Beetaloo is a stacked shale play with world class geological characteristics analogous to the prolific US Marcellus Shale
• Empire holds ~3 million net effective Beetaloo acres in two contiguous landholdings
• Empire owns and operates all of its acreage with 100% working interest and ~85% net revenue interest
1
Empire Energy Investment Case (Cont’d)
The Beetaloo Basin Focused Gas Development Company
• Empire’s acreage contains >47 TCFe 2U resource and >1.6 TCF 2C resource independently assessed by NSAI with <1% CO2
• Recent appraisal drilling by Empire and other operators has demonstrated commercial viability
• Australian gas prices are over three times US, demonstrating an urgent need for increased supply
• Empire is targeting first gas sales from its Carpentaria Pilot Project in 1H 2025 with scope to grow to LNG scale in years ahead
2
Empire’s Beetaloo Basin Position
5 TCF gas pilot ready Carpentaria Project with >20 TCF Western Beetaloo resource delineated
• Empire is the largest net acreage holder in the Beetaloo
• All acreage is 100% owned and operated by Empire
• Acreage benefits from high Net Revenue Interest of ~85%1 vs typical US
NRI ~75%
• Acreage is proximal to existing pipeline and road infrastructure to
facilitate rapid commercialisation
• NT Government is investing in infrastructure corridors to facilitate rapid
industry growth
• The Carpentaria Project (EP187) is the immediate focus (5 TCF pilot
ready) targeting first production in 1H 2025 with >20 TCF Western
Beetaloo Velkerri Shale resource providing material drilling inventory
1. Net revenue interest (NRI) equals Working Interest (100%) minus 10% Northern Territory Government royalty (partially offset
by statutory deductions) minus Traditional Owner royalty and private royalties
3
Positioned Across the Thickest Section of the Stacked Play
Combined Thickness of A, Intra A/B, B and C Velkerri Shales
• Empire’s Beetaloo Projects area located across the
thickest section of stacked Velkerri Shale reservoirs
in the basin
• Carpentaria Project has >300 m gross thickness of A,
Intra A/B, B and C Shale reservoirs
• Western Beetaloo Project has the thickest stacked B
and C Shale in the Beetaloo
• Empire’s “stacked shale play” results in a 4x
increase in the net effective acres compare to the
B Shale alone
4
Empire’s Stacked Play Improves Development Economics
Empire’s four stacked shale
reservoirs are 5x thicker
than the prolific Marcellus
Single Reservoir
Depth
(ft)
5800)
0
Gas
Saturation
100%
328 ft
Gamma Ray
Depth
M (ft)
Stacked Shale Play Development Concept
Gas
Saturation
0
100%
C Shale
(5250)
(5500)
(6000)
(6200)
Gamma Ray
(5000)
100 m
SW Marcellus
Section
Four Stacked Reservoirs
Carpentaria-4
Type Section
Marcellus
(6400)
(5750)
Total Marcellus
Thickness ~60 m
(6000)
(6250)
B Shale
• Four stacked reservoirs allows for fewer
well pads with more wells
Intra A/B • Option for more than 30 wells per pad
(Hybrid Play)
• Leads to improved development
efficiencies and economics
A Shale
• Akin to Permian Basin style development
5
Total Net Thickness >300 m
Appraisal Activity has Delivered the Carpentaria Project
Cost-Effective Approach to Appraisal
• Seismic, multi-stage vertical and horizontal flow tests have delineated a
large stacked play
• Four zones with a net effective area of >460,000 acres (~1,900 km2)
• ~A$90m (~US$60m) invested has delivered >1,739 PJ (~1.5 TCF)
Commercial rates confirmed
•
•
Two horizontal wells stimulated
•
High calorific value gas (1.15 TJ per MMCF)
Excellent flow rates – normalised rate of 3.5 TJ/d per 1,000 m
Gas resource and productivity now established to move into pilot production
•
•
More than 200 drilling locations delineated in the B Shale
~600 additional locations across A, Intra A/B and C Shales
6
The Carpentaria Pilot Project
Empire is targeting first production from Carpentaria in H1 2025
The Carpentaria Pilot Project aims to:
• Produce sales gas from existing Carpentaria-2H and Carpentaria-3H test wells,
C-5H and future pilot development wells
• Process gas through Empire’s Carpentaria Gas Plant which has a design
capacity of 42 TJ/d (40 mmcf/d)
• Utilise existing McArthur River Gas Pipeline capacity to produce up to 25 TJ /d
(23 mmcf/d) in the pilot phase
- “T-piece” connection has been inserted into the pipeline to facilitate
Empire’s access to the line for gas sales
• Deliver both cash flow and additional resource definition for large-scale
development
Carpentaria 2H and 3H well pad from above
Carpentaria-2H flare
Carpentaria Gas Plant in operation immediately prior to acquisition
7
Introducing Carpentaria-5H
C-5H will be the longest horizontal shale well, and the largest frack job executed in Australia
• Empire is fully funded for C-5H and will be drilled in H2 2024
• C-5H will be drilled from the same well pad as Carpentaria-2H (“C2H”) and Carpentaria-3H (“C-3H”) in 5 ½” casing
Stylised Schematic Vertical
• Environmental approvals in place for drilling, stimulation and
testing. Progressing approvals to sell test gas
• C-5H will target:
- ~3,000 metres of horizontal section
- 60 fracture stimulation stages
• C-5H will utilise the best practise completion to optimise
productivity. Empire has engaged specialist US shale experts to
refine design and ensure learnings from previous wells are
captured in C-5H
• The goals of C-5H are:
- Optimise fracture stimulation design to achieve higher
productivity
- Commence the sales of gas
- Conduct a long-term production test to develop a Carpentaria
type curve for long laterals for development planning
8
A Platform for Increased Productivity
Basin-specific drilling and completion methodologies are being developed to drive
increasing flow rates and EUR consistent with the lived experience of the US Shale Revolution
Drilled Appraisal Wells
Demonstrated Execution
> 2.6 km horizontal well drilled
successfully with 4 ½” casing
Drilling
Trialled multiple techniques
Stimulation
61 stimulation stages successfully
executed without screenout
Multiple stimulation fluids trialled
Lift, Choke & Soak
Flowback
No artificial lift required during
flowback
Trialled choke management and
soaking
Future Pilot / Development Wells
• Drilling 3km horizontal wells
• Increase casing size to 5 ½”
• Completion focus for landing zone, geosteering
and cementing
• Higher horsepower and doubling pump rates to
>100 barrels per minute
• One optimised strategy per well
EUR
Well
Cost
• Post stimulation well cleanup timing and
technique (“soak”)
• Managed choke scheme for long term
productivity
9
Pathway to Full-Field Development of the Carpentaria Project
Year
2024
2025
2026
• Construct Carpentaria
• First gas deliveries from
• Drill, fracture stimulate
Pilot Project midstream
facilities and gas
gathering network
• Drill, fracture stimulate
KEY ACTIVITIES
and connect
Carpentaria-5H (3,000m
lateral, ~60 stages) and
existing well inventory
(C-2H and C-3H)
the Carpentaria Pilot
Project (~15TJ/d)
• Planning and
engineering work for fullfield development
Carpentaria Pilot Project
2028+
and connect a further
~3 wells (3,000m lateral,
~60 stages) to grow
production to ~25TJ/d
• APA to commence work
on pipeline and gas
processing infrastructure
for full-field
development
• ‘Factory’ drilling
• Grow production up ~1
BCF/d to supply east
coast and LNG markets
• All three target gas
markets (NT, east coast
and LNG) are structurally
short of gas
Carpentaria Gas Project
10
Empire is a Responsible Operator with ESG at the Core of its Strategy
Empire’s Beetaloo gas contains sub 1% CO2 in the reservoir
Environment
• Carpentaria CO2 reservoir levels are extremely low compared
to other new supply options
• Empire will offset all Scope 1 emissions with minimal impact on
revenues
- ~2% of gross revenue (at A$10/GJ gas price) for
Carpentaria’s full field economic life at the current
Australian Carbon Credit Unit (“ACCU”) price of ~A$35 per
tonne of CO2e1
• Stacked shale play minimises surface footprint
Social and Governance
• Empire maintains strong relationships with Traditional Owners
(TOs) and pastoralists on whose land it operates with full
consent
- ~30 on-county meetings held with TOs to date
- Northern Land Council exploration payments paid for the
benefit of TOs and thousands of hours of employment for
TOs to date
- Land access agreements signed with pastoralists
1. Estimates have been prepared by Empire and independently reviewed by HRL Technology Group Pty Limited (https://www.hrlt.com.au)
11
Government Supporting the Beetaloo
NT Government has primary responsibility for regulation of the Beetaloo Basin
Federal Labor Government is supportive of Beetaloo development
NT Government supports the Development of the Onshore Gas Industry
• All regulatory frameworks have been implemented to allow for the award
of Production Licenses for the Beetaloo Basin
• The NT Government estimates that developing the Beetaloo Basin will
create thousands of work opportunities for Territorians and boost the
economy by $17 billion1
The Hon Madeleine King MP (Minister for Resources and Minister
for Northern Australia)
“The (Future Gas) Strategy makes it clear that gas will remain
an important source of energy through to 2050 and beyond,
and its uses will change as we improve industrial energy
efficiency, firm renewables, and reduce emissions”
“But it is clear we will need continued exploration, investment
and development in the sector to support the path to net zero
for Australia and for our export partners, and to avoid a shortfall
in gas supplies.”2
Australia's Future Gas Strategy
• During May 2024, the Australian Government released a medium and
long-term strategy that establishes the role gas will play in the transition to
net zero by 2050
• Gas is crucial for “A Future Made in Australia” as it supports
manufacturing, food processing and refining of critical minerals which will
help Australia and the world to lower emissions
• Gas supplies 27% of Australia’s energy needs and represents 14% of
The Hon Eva Lawler (Chief Minister of the Northern Territory)
“The Northern Territory will be at the forefront of natural gas
production, and we will be the jurisdiction to deliver cheaper,
cleaner and more reliable energy to the rest of Australia.“3
“Today’s announcement [of the recent capital raise] by Empire
is fantastic news for jobs, fantastic news for our economy and
fantastic news for the future of the Territory.”3
Australia’s export income2
1. https://territorystories.nt.gov.au/10070/941083
2. https://www.minister.industry.gov.au/ministers/king/media-releases/australias-future-gas-strategy
3. https://newsroom.nt.gov.au/article?id=9ff09175dcc6e63ea35786053d5345dc
12
Australia, Asia and the World Need New Gas Supply
Empire’s strategy is to supply domestic and international gas markets
Phase 1: Northern Australian Gas
Market
Phase 2/3: Australian East Coast
Gas Market
Phase 2/3: Global LNG Market
• Blacktip Gas Field: GSA to 2034
• Australian east coast domestic
• Empire is strategically located
of 104TJ/d vs. 15TJ/d production
market is structurally short of gas
with a supply vs. demand deficit
emerging in 2027
• NT needing to buy emergency
gas from Darwin LNG terminals
• Northern Gas Pipeline (to QLD):
• Existing supply sources such as
expected to be closed until at
least 30 June 2024 to hold gas in
NT1
1. Central Petroleum ASX release entitled “Northern Gas Pipeline Update” dated 15 March 2024
2. Shell LNG Outlook 2024
the Gippsland Basin are in
decline. QLD CSG largely
developed and contracted for
LNG to Asia
between Darwin and Gladstone
LNG export infrastructure
• LNG demand to reach around
625-685 million tonnes a year in
2040 (2023: 404mt) and outstrip
supply by 20272
13
The Beetaloo is Strategically Located Near Asian Markets
Australian domestic gas and Asian LNG indices trade at multiples of US Henry Hub prices
LNG Tanker Sailing Days to Tokyo Bay1
• Exposure to Pacific Basin gas prices
• >US$9 / MMBtu premium to Henry Hub
• Japan/Korea Marker (Platts) LNG price
• US$11.94 / MMBtu (as at 27 May 2024)
• US$12.09 / MMBtu (avg. previous 12 months)
• US$22.30 / MMBtu (avg. previous 3 years)
• Henry Hub price
• US$2.49 / MMBtu (as at 27 May 2024)
• Wallumbilla (Main East Coast Australian Index)
• A$12.79 / MMBtu (as at 27 May 2024)
• US$8.47 / MMBtu (as at 27 May 2024)
Source:
1. BloombergNEF, Tamboran Resources
14
The Empire Value Proposition
Phase 1
Carpentaria Pilot Project
• Up to 25 TJ/d (24 mmcf/d)
• Targeting first revenue in 2025
• Mature resource definition and
type curves for larger scale
development
Phase 2
Domestic Gas Project
Phase 3
Full-Field Development - LNG
• ~200TJ/d (~190 mmcf/d) to
• ~1 BCF per day to supply LNG
• Carpentaria ‘stacked play’
• ~2.6 million net effective acres of
supply Australian east coast
provides additional drilling
inventory across ~460,000 net
effective acres
export markets
‘running room’ across Western
Beetaloo
• Gas plant secured
15
Near-term Growth Catalysts
Empire is fully funded for the drilling, fracture stimulation and production testing of C-5H
Key Near-term Catalysts
1. Execute Gas Sales and Transportation Agreements
2. Execute drilling rig and fracture stimulation spread contracts for Carpentaria-5H
3. Obtain Regulatory and Indigenous Approvals
4. Carry out C-5H drilling, stimulation and well testing
5. Secure financing for surface facilities (debt advisors appointed)
6. Construct surface facilities
7. Commence pilot project gas sales
16
ASX:EEG
https://empireenergygroup.net/
Alex Underwood
Managing Director
info@empiregp.net
+612 9251 1846
17
Appendix 1: Corporate Snapshot
ASX Share Price
Capital Structure
Current
Proforma1
Shares on issue2
966.7M
1,017.2M
Share price
A$0.19
A$0.19
Market cap
A$183.7m
A$193.3M
Net (debt3) / cash4
~A$39.1m
~A$46.8M
Enterprise value
~A$144.6m ~A$146.5M
Cash at bank4
~A$45.3m
~A$53.0M
Contingent and Prospective Resources
Top Shareholders
Current
Proforma1
2C Contingent Resources
1.65 TCFe
1,927 PJe
2U Prospective Resources
46.6 TCFe
49,125 PJe
Pangaea Resources
14.5%
13.8%
Sheffield Holdings (USA)
8.5%
9.0%
Elphinstone Group
8.1%
8.0%
Liberty Oilfield Services (USA)
4.0%
4.7%
1. Proforma includes settlement of the Tranche 2 placement shares which is conditional on approval at the Annual General Meeting
2. Empire has 78.9m unlisted options on issue with an average exercise price of ~A$0.39 per share. In addition, there are 17.5m Share Rights on issue to members of the management team and Board, 6.9m of which have performance hurdles tied
to total shareholder return or service period thresholds.
3. Total available debt of A$7.25 million (drawn to A$6.2 million), comprising: (i) A$2.25 million revolving credit facility (drawn to A$1.8 million); and (ii) A$5 million performance bonding facility (drawn to A$4.4 million), representing a contingent
liability. Both facilities are provided by Macquarie Bank
4. As at 27 May 2024
18
Appendix 2: A Globally Significant Resource Position
Contingent
Resources (Gas)
Low Estimate Best Estimate
(1C)
(2C)
Contingent Resources
(Liquids)
High
Estimate
(3C)
Low Estimate Best Estimate
(1C)
(2C)
High
Estimate
(3C)
Prospective
Resources (Gas)
Prospective Resources(Liquids)
Low Estimate Best Estimate
High
(1U)
(2U)
Estimate (3U)
Low Estimate Best Estimate
High
(1U)
(2U)
Estimate (3U)
PJ
PJ
PJ
mmbbls
mmbbls
mmbbls
PJ
PJ
PJ
mmbbls
mmbbls
mmbbls
365.2
1,906.1
3,946.1
0.9
3.5
14.1
12,380
44,540
145,523
164
764
3,509
Empire 2C Contingent Resource of 1,906 PJ (1,625 BCF gas) and 3.5 MMBBLs liquids
Empire P(50) Prospective Resource of 44,541 PJ (42 TCF gas) and 764 MMBBLs liquids
Note: Refer to EEG announcement dated 29 May 2023 for Netherland, Sewell & Associates, Inc. Contingent and Prospective Resources
Estimate of BCF to PJ undertaken by Empire of 1.06
19
Appendix 3: Empire’s Board of Directors
Peter Cleary
Alex Underwood
Karen Green
Louis Rozman
Prof. John Warburton
Chairman
Managing Director
Non-Executive Director
Non-Executive Director
Non-Executive Director
• Distinguished 29-year career
representing Santos, the
North West Shelf Venturers
and BP in Asia. His executive
career was in LNG, pipeline
gas and chemicals
operations
• Associate Director Energy
Markets Division of
Macquarie Bank Limited
(Sydney and Singapore) for
10 years
• Over 30 years’ experience in
Chartered Accountancy,
predominantly in business
advisory services and has
lived and worked in Darwin
since 1991
• Former Managing Director of
CH4 Gas which merged with
Arrow Energy and later
acquired by PetroChina and
Shell
• Highly regarded petroleum
geoscientist experienced in
big fields
• Member of the Executive
Committee of the Australia
Japan Business Co-operation
Committee and the Australia
Korea Business Council
• Director Natural Resources
Division of Commonwealth
Bank of Australia
(Singapore)
• Financial Analyst BHP Billiton
Petroleum (Perth)
• Experience investing debt
and equity in the upstream
oil and gas sector and
identification of value
creation opportunities for
upstream oil and gas
development / production
assets
• Deep understanding as an
institutional investor of the
key drivers of shale gas
value generation
• Managing Partner for the
Northern Territory and leader
for Advisory Services for
Deloitte in the Northern
Territory
• 5th female ever to enter the
Deloitte Australian Partnership
• Currently on the Northern
Territory Investment Advisory
Group and on the Northern
Territory National Security
Advisory Panel.
• Non-Executive Director of
Airport Development Group
Pty Ltd (the long-term lease
holder of Darwin International
Airport, Alice Springs Airport
and Tennant Creek Airport)
• Founding principal of Pacific
Road Capital, a resources
investing manager of private
equity funds
• Former Chief Operating
Officer of AurionGold Limited
• 30 years technical &
leadership experience in
leading E&P companies
including BP, LASMO-Eni and
Oil Search
• Previously Chief of
Geoscience & Exploration
Excellence for Oil Search
• Chairman of the VALMIN
Code Committee for the
AusIMM and Australian
Institute of Geoscientists
20
Appendix 4: Large Western Beetaloo Resource
Comprehensive well and seismic datasets in the Western Beetaloo Project have defined a
large extensive resource strategically located on existing infrastructure
Resource has been delineated
•
•
•
•
Delineated ~2.6 million net effective acres
100+ TCF OGIP Discovery (B Shale only)
Less than 1% CO2
Thickest B and C Shale in Beetaloo
• Same rock as Carpentaria Project – Stacked Play
• Huge running room
Forward program
•
•
EP 167 and EP 168 100% EEG
Up to 380 km in-fill 2D seismic oriented for future Hz wells
Multiple locations cleared for drilling and flow testing
21
Appendix 5: Empire has High-Quality, Low CO2 Gas
Empire’s Carpentaria gas composition meets Japanese customer specifications
• Gas for the Ichthys LNG is supplied from the Brewster Member and the
Carpentaria-2H Gas Composition - Mole %
Plover Formations which comprise the Ichthys Gas Field
• Production to date has mainly been from the Brewster Member,
however production is expected to move towards Plover and
peak in the 2030s as Brewster is depleted1
• Gas composition of Brewster and Plover
• Brewster: ~8% (CO2), ~11% (ethane)
• Plover: ~17% (CO2), ~4% (ethane)2
• Empire’s low CO2 (>1%) and high ethane (~12%) is perfectly
positioned to be blended with emerging Ichthys Gas supply to:
• Reduce average CO2 content (lessen need for CO2 stripping and
carbon, capture and storage)
Component
Q3 2022 Testing
Q1-Q2 2023 Testing
C1
Methane
83.17
82.80
C2
Ethane
11.95
12.40
C3
Propane
1.47
1.50
C4
Butane
0.30
0.30
C5+
Pentane and Higher
0.06
0.06
He
Helium
0.16
0.12
CO2
Carbon Dioxide
0.88
0.91
2.01
1.91
100.00
100.00
Other Inerts e.g., Nitrogen
Total Gas Composition
Hydrocarbons
Inerts
Sources:
1. https://www.upstreamonline.com/field-development/inpex-steps-to-the-starting-line-for-next-ichthys-phase/2-1-972375
2. https://www.inpex.com.au/media/yrobfsay/draft-environmental-impact-statement-06-chapter-4-project-description.pdf
3. https://territorygas.nt.gov.au/Knowledge-Centre/latest-news/2022/inpex-commits-to-lng-expansion
• Increase ethane content (attractive to Japanese energy market
given high heating value required and lessen the requirement for
ethane spiking of gas into plant or upon arrival in Japan)
• Support Ichthys LNG planned expansion to three trains by 20303
22
Appendix 6: Conversion Table
Exchange Rate
US$ : A$
0.65
Energy
MCF : GJ
1.06
MMCF : TJ
1.06
BCF : PJ
1.06
GJ : TJ
1,000
GJ : PJ
1,000,000
Distance
Feet : Metres
3.28
23
Disclaimer
This presentation has been prepared by Empire Energy Group Limited (“Empire” or the “Company”). The information in this presentation is information of a general nature and is subject to
change without notice. The information in this presentation does not purport to be complete, nor does it contain all of the information which would be required in a prospectus prepared in
accordance with the requirements of the Corporations Act 2001 (Cth). It contains information in a summary form only and should be read in conjunction with Empire’s other periodic
disclosure announcements to the ASX available at www.asx.com.au.
An investment in Empire shares is subject to known and unknown risks, many of which are beyond the ability of Empire to control or predict. These risks may include, for example, movements
in oil and gas prices, a failure to acquire some or all of the targeted acreage, risks associated with the development and operation of the acreage, exchange rate fluctuations, an inability to
obtain funding on acceptable terms or at all, loss of key personnel, an inability to obtain appropriate licences, permits and or/or other approvals, inaccuracies in resource estimates, share
market risks and changes in general economic conditions. Such risks may affect actual and future results of Empire and its shares.
This presentation contains statements, opinions, projections, forecasts, and other material (“forward looking statements”). These statements can be identified by the use of words like
‘anticipate’, ‘believe’, ‘intend’, ‘estimate’, ‘expect’, ‘may’, ‘plan’, ‘project’, ‘forecast’, ‘will’, ‘should’, ‘could’, ‘seek’ and other similar expressions. Forward looking statements may be based on
assumptions which may or may not prove to be correct. None of Empire, its respective officers, employees, agents, advisers or any other person named in this presentation makes any
representation as to the accuracy or likelihood of fulfilment of the forward looking statements or any of the assumptions upon which they are based and disclaim any obligation or undertaking
to revise any forward looking statement, whether as a result of new information, future event or otherwise.
Maps and diagrams contained in this presentation are provided to assist with the identification and description of Empire’s lease holdings and Empire’s intended targets and potential
exploration areas within those leases. The maps and diagrams may not be drawn to scale and Empire’s intended targets and exploration areas may change in the future.
All financial information is in Australian dollars unless stated otherwise.
The information contained in this presentation does not take into account the investment objectives, financial situation or particular needs of any recipient and is not financial product advice.
Before making an investment decision, recipients of this presentation should consider their own needs and situation and, if necessary, seek independent professional advice.
To the maximum extent permitted by law, Empire and its respective officers, employees, agents and advisers give no warranty, representation or guarantee as to the accuracy, completeness or
reliability of the information contained in this presentation. Further, none of Empire nor its respective officers, employees, agents or advisers accept, to the extent permitted by law,
responsibility for any loss, claim, damages, costs or expenses arising out of, or in connection with, the information contained in this presentation. Any recipient of this presentation should
independently satisfy themselves as to the accuracy of all information contained herein.
24
Share your feedback
Discover