1 July 2026
• Carpentaria-5H flow testing is underway with a peak rate of >14 TJ / day, an average
rate of 7 TJ / day and a current rate of ~6.7 TJ / day, a remarkably low rate of decline.
The well continues to clean up with decreasing water production, increasing gas to
water ratio (“GWR”), increasingly gas-dominated flow and access to a steadily
increasing volume of the reservoir
• Beetaloo Energy anticipates an IP30 rate by mid-July
• Construction of the Carpentaria Gas Plant is proceeding to plan, incident free, on time
and on budget
• First gas sales from the Pilot Project remain on track for Q4 2026
• Seismic acquisition has commenced across EP167 and EP168 in the Western Beetaloo
• Territory Sands and Beetaloo Energy have completed long form documentation to the
agreement announced 10th
April which will support the development of the first in-
basin frac sand mine in the Beetaloo Basin
• Beetaloo Energy has met all conditions precedent and made an initial drawdown on the
Macquarie Midstream Infrastructure facility
• Cash at bank $63.2 million
Beetaloo Energy Australia Limited www.beetalooenergy.com 2
"Beetaloo Energy is currently in the busiest period of exploration, appraisal and pilot development in
its history, with active operations across flow-testing, gas plant construction, seismic acquisition and
sand mine investment. We are on track to commence gas sales from the Carpentaria Pilot Project in
Q4 2026.
The interim results we are seeing from the Carpentaria-5H flow test are highly encouraging. We have
been pleasantly surprised by the very low rate of decline in gas rates while the well continues to clean
up. Consistent with other recent wells in the basin, production performance in the Beetaloo Basin
appears to differ from analogue basins in the United States which tend to come online at very high
rates but with a commensurate rapid decrease in production rates before settling out. If low decline
rates continue longer-term, this could have meaningful consequences for higher EUR per well, subject
to longer-term well performance data.
Construction of the Carpentaria Gas Plant is continuing to plan with no HSE incidents, on time and on
budget.
Seismic acquisition has commenced in EP167 and EP168. This program will allow BTL to delineate
optimal drilling locations for future appraisal drilling activities. The Western Beetaloo resource is
extremely large, representing multi-decade drilling and production potential, and is optimally located
adjacent to road, rail and pipeline infrastructure.
We are pleased to have completed long-form documentation with Territory Sands to support their
plans for the delivery of cost-effective sand supply to support stimulation activities for both BTL and
other operators across the basin.
With over $63 million cash at bank and $42.5 million in undrawn facilities, the Company is very well
funded through this year’s Beetaloo Basin programs."
⎯ Alex Underwood, Managing Director
Beetaloo Energy Australia Limited www.beetalooenergy.com 3
CARPENTARIA-5H (C-5H)
Flow testing commenced on 11 June 2026. The well opened with an initial gas rate of >14 TJ per day
before quickly settling to an average rate since reopening of 7 TJ / day. The well has exhibited a
remarkably low rate of decline over the 19 days of testing, with a current flow rate of ~6.7 TJ / day.
The well has been flowing on 56/64” to 64/64” choke settings, which are significantly smaller than the
88/64” choke setting at the equivalent part of the 2025 clean up flow test.
Well clean up is progressing effectively as flowback water volumes decline. Since reopening, the water
rate has dropped from ~1,300 to ~500 barrels per day, with the water rate continuing to fall.
As a result, the gas-water ratio (“GWR”) has steadily climbed to a current ratio of ~11,000 scf / bbl
demonstrating an increasingly gas dominated flow regime.
Analysis of the results to date demonstrates that the well is accessing an increasing volume of the
reservoir as cleanup continues.
Management remains confident in the previously disclosed recoverable gas (2C) estimate of ~10 PJ1
.
Preliminary observations provide encouraging upside to this estimate; however further production data
will be required before conclusions can be drawn regarding connected reservoir volume and long-term
well productivity.
Testing is ongoing and the Company will advise shareholders once the test is complete.
1
NSAI Contingent and Prospective Resources announcement dated 29 May 2023
Flare at Carpentaria C-5H where flow testing is underway
Beetaloo Energy Australia Limited www.beetalooenergy.com 4
WESTERN BEETALOO - EP167 AND EP168 SEISMIC SURVEY
An approximately 233-line km infill Birdum Creek 2D Seismic Survey has commenced acquisition across
the deeper eastern portion of the Gas Discovery Area in EP167 and EP168. This represents the first on-
ground field program since the leases were acquired from Pangaea Resources in April 2021.
The Birdum Creek 2D seismic survey is designed to infill the existing 2D seismic grid across the resource
area previously delineated by exploration and appraisal seismic and wells drilled by Pangaea Resources.
The survey targets the same prospective reservoir intervals as the Carpentaria Project but focuses on an
area where the Velkerri B Shale is significantly thicker, enhancing its development potential. The line
orientation has been optimised to support future horizontal drilling, improve reservoir characterisation,
and maximise potential drilling locations.
Seismic acquisition is expected to be completed by the end of July, with data processing and
interpretation scheduled for completion during Q3 2026.
The Birdum Creek 2D Seismic Survey is expected to further delineate a resource exceeding 20 TCF and
support the development of a multi-decade, LNG-scale drilling inventory strategically positioned
adjacent to existing gas pipeline, road, and rail infrastructure.
Beetaloo Energy Australia Limited www.beetalooenergy.com 5
CARPENTARIA GAS PLANT
Construction of the Carpentaria Gas Plant continues to plan.
There have been no environmental, health or safety incidents to date, demonstrating the professional
approach taken by the Beetaloo Energy team and our contactor Wasco.
Construction remains on schedule and on-budget. Commissioning and commencement of Pilot Project
gas sales from Carpentaria-2H, Carpentaria-3H and Carpentaria-5H remain on schedule for Q4 2026.
Construction of the Carpentaria Gas Plant
Vibroseis truck used for generating seismic waves to map underground geological structures
Beetaloo Energy Australia Limited www.beetalooenergy.com 6
Registered Office Beetaloo Energy Australia Limited
Level 5, 6-10 O’Connell Street ABN 29 002 148 361
Sydney NSW 2000
Phone: +61 2 9251 1846 Securities Exchange
Facsimile: +61 4 9251 1022 ASX: BTL
Media and Investor Enquiries Share Registry
Nick Kell Computershare Investor Services
Phone +61 2 9251 1846 Phone: 1300 850 505
TERRITORY SANDS
Beetaloo Energy (BTL) and Territory Sands have fully executed the loan agreement under which BTL will
provide $10.4 million to fund construction and commissioning of Territory Sand's fracture stimulation
sand mining project in the Beetaloo Basin near Larrimah in the Northern Territory. Under the agreement
with Territory Sands, BTL has priority access to fracture stimulation sand supply from the mine at market
competitive pricing. This will significantly reduce the cost of sand supply for future well stimulations,
thereby driving improved well economics in larger scale development scenarios.
The first tranche of loan funding to be made available by BTL will fund a deposit for purchase of sand
screening equipment being manufactured to Territory Sand's fracture stimulation sand specifications.
MACQUARIE MIDSTREAM INFRASTRUCTURE FACILITY
BTL has satisfied all conditions precedent for drawdown under the Macquarie Midstream Infrastructure
Facility and completed an initial drawdown of $2.5 million. Further drawdowns are expected throughout
CY2026 as construction of the Carpentaria Pilot Project progresses.
ABOUT BEETALOO ENERGY
Beetaloo Energy holds 28.9 million acres of highly prospective exploration tenements in the McArthur
Basin and Beetaloo Sub-basins, Northern Territory. Work undertaken by the Company since 2010
demonstrates that the Eastern depositional Trough of the McArthur Basin, of which the Company holds
around 80%, has enormous conventional and unconventional hydrocarbon potential. The Beetaloo
Basin, in which Beetaloo Energy holds a substantial position, has world-class hydrocarbon volumes in
place and a ramp up in industry activity to appraise substantial discoveries already made by major
Australian oil and gas operators is ongoing
This ASX release has been authorised by the Managing Director, Alex Underwood
Beetaloo Energy Australia Limited www.beetalooenergy.com 7
DISCLOSURE UNDER ASX LISTING RULE 5
ASX Listing Rule 5.30
(a) Name and type of well Carpentaria-5H, horizontal shale gas well
(b) Location of well and the details
of the permit or lease in which
the well is located
Located in Beetaloo’s wholly owned and operated EP187
tenement, located in the Beetaloo Sub-basin in the Northern
Territory
(c) The entity’s working interest in
the well
Beetaloo holds a 100% working interest and operatorship in
Carpentaria-5H
(d) If the gross pay thickness is
reported for an interval of
conventional resources, the net
pay thickness
N/A
(e) Geological rock type of the
formation drilled
The horizontal section has been drilled in the B Shale of the
Velkerri Formation
(f) Depth of the zones tested The depths of the 2,955 metre (9,625 foot) fracture stimulated
horizontal section tested range from 1,626 to 1,595 metres
(5,007 feet to 5,233 feet) True Vertical Depth (TVD) referenced
to Rotary Table (7.2 metres (23.6 feet) above ground level).
2.955 metres (9,625 feet) of the 3,310 metres (10,860 feet)
horizontal section was fracture stimulated.
(g) Types of test undertaken and
the duration of the tests
Extended production testing following fracture stimulation.
The current and ongoing 19-day test period was preceded by
~74 days of stimulation cleanup flow with gas breakthrough
following the fracture stimulation, The preceding period
included a previously announced 30-day cleanup test
(Carpentaria-5H Clean-Up Flow Test Update announcement
on 22 December 2025)
(h) The hydrocarbon phases
recovered in the tests
High Calorific Gas –
Beetaloo Energy Australia Limited www.beetalooenergy.com 8
C-5H Gas recovery - mole %: Methane 82.77, Ethane 12.25,
Propane 1.61, Butane 0.34, Pentane and Higher 0.09.
Conversion factor of raw MMSCF to TJ is 1.173
(i) Any other recovery, such as ,
formation water and water,
associated with the test(s) and
their respective proportions
~143,000 barrels of flowback fluid recovered, representing
26.6% of total injected water. During the current 19-day test
period, the rate of fluid flowback has declined from ~1,300
bbl/day to ~500 bbl/day
(j) The choke size used, the flow
rates and, if measured, the
volumes of the hydrocarbon
phases measured
Choke size ranged from 56/64” to 64/64” following a multi-
day opening sequence over the current 19-day test period.
Gas flow has averaged 7 TJ/day (~6 mmscf / day)
(k) If flow rates were tested,
information about the
pressures
associated with the flow and
the duration of the test.
Wellhead pressure has ranged from ~1,380 psig to ~335 psig.
Test duration 19-days and ongoing (2:15pm 11 June 2026 to
– 2:15 pm 30 June 2026)
(l) The number of fracture
stimulation stages and the size
and nature of fracture
stimulation applied
67 slickwater stages along an effective stimulated horizontal
length of 2,955 metres (9,695 feet) executed with a total of
~11,000 tonnes of proppant (sand) placed representing an
average proppant intensity of 2,295 lb/ft
(m) Any material volumes of non-
hydrocarbon gases, such as,
carbon dioxide, nitrogen,
hydrogen sulphide and
sulphur.
Mole %: Helium 0.14%, Carbon Dioxide 0.84% and other Inert
volume 1.95%
(n) Any other information that is
material to understanding the
reported results
Not applicable