Carpentaria-5H Clean-Up Flow Test Update
• Carpentaria-5H has achieved a peak gas flow rate of 11.2 TJ/day, the second-highest
30-day average flow rate in the basin of 7.1 TJ/day and an exit flowrate of 6.3 TJ/day,
confirming a very low rate of decline over the 30-day clean-up test.
• Beetaloo Energy has implemented basin-leading flowback methodologies to preserve
fracture conductivity and maximise long-term well productivity. This approach
utilises a restricted choke that extends the clean-up period, which has delivered a
more than five-fold increase in fracture conductivity compared with the previous
Carpentaria wells.
• Clean-up of the frac fluid from the fracture system is ongoing with the gas-to-water
ratio continuing to improve throughout the 30-day test period with over 23 percent
of the frac fluid recovered to date. Once frac fluid clean-up was achieved at the prior
two Carpentaria wells, materially higher gas flowrates were observed, with
Carpentaria-3H recording a 30 percent increase in gas flow rate during the post
clean-up IP30 flow test.
• Independent resource certifiers Netherland, Sewell & Associates have estimated 10 PJ
of 2C recoverable gas resources per well location in the area surrounding
Carpentaria-5H.
• Based on flowback data analysis conducted by Subsurface Dynamics, a North
American shale reservoir engineering specialist, Beetaloo Energy estimates that the
Carpentaria-5H well has developed an effective fracture network, characterised by
materially longer effective half-lengths relative to the previous two Carpentaria wells
and higher apparent shale permeability in the Carpentaria region. Beetaloo Energy
believes these outcomes may support improved gas recovery and overall project
economics.
• A further extended flow test is expected to commence in Q1 2026 to fully assess well
deliverability once clean-up is complete.
Beetaloo Energy Australia Limited www.beetalooenergy.com 2
Carpentaria 5H Clean-Up Flow Testing Update
Carpentaria-5H (“C-5H”) was reopened on Sunday, 16 November 2025 after ~46 days of
shut-in following previous periods of clean-up. Gas rates have continued to significantly
increase between phases of well clean-up in Australia’s largest ever hydraulic
stimulation. Since reopening, a thirty-day average gas rate of 7.1 TJ/day has been
achieved through 5 ½” casing without the aid of production tubing.
Independent resource estimation by Netherland Sewell and Associates attributes 10 PJ
of recoverable gas (2C) to the C-5H drill location*. Early flowback data indicates the
shale permeability is 60 percent higher than previous estimates, which may improve
Estimated Ultimate Recovery (“EUR”) per well. A highly effective stimulated rock volume
has been observed at C-5H, with interpreted 20 percent longer fracture half-lengths and
indications of an effective natural fracture system, underpinning strong long-term
productivity potential.
* NSAI Contingent and Prospective Resources announcement dated 29 May 2023
“We are highly encouraged to have achieved one of the highest flow rates in the history of the
Beetaloo Basin while C-5H is still cleaning-up, demonstrating that the well is likely to be a
strong long-term producer. We have deployed a disciplined flow-back strategy with a
consistent choke setting since the second day of the test period, to maintain fracture
conductivity for long-term well performance while the well dewaters. Total gas recovery is also
likely to be enhanced by the 60% increase observed in permeability across the Carpentaria
region.
As has been seen with C-2H and C-3H, there is the potential for a material uplift in flow rates
once the well is further cleaned-up.
Clean-up is continuing and we intend to commence a second flow test in Q1 2026.
Civil construction works at the Carpentaria Gas Plant are now well advanced, and we look
forward to commencing gas plant installation in Q2 2026.
With all required approvals now in place, we look forward to commencing pilot gas sales into
the local NT market in 2026.
As 2025 comes to a close, we express our gratitude to the Beetaloo Energy team, our
shareholders and all stakeholders, and we look forward to a big year ahead as we bring the
Beetaloo Basin into pilot gas sales next year, which will benefit all Territorians.”
⎯ Alex Underwood, Managing Director
Beetaloo Energy Australia Limited www.beetalooenergy.com 3
Over the C-5H well clean-up periods, a total of ~23% of the pumped fluid has been
returned. In the prior two wells, 30% or more of Carpentaria-2H (“C-2H”) and
Carpentaria-3H (“C-3H”) pumped fluid was returned prior to a cleaned-up IP30 test (EPT
2).
In those two wells an uplift in gas rate of up to 30% was observed over prior flowback
test periods, with greater production uplift attributed to declining fluid rates with
ongoing flowback.
*Beetaloo Energy intends to carry out a second EPT commencing in Q1 2026. This chart makes no representations as to potential
flow rates during that EPT.
C-5H fluid flowback is approaching the optimal clean up stage
Prior Carpentaria wells have produced up to 30 percent higher IP30 rates once the wells have fully
cleaned-up
Beetaloo Energy Australia Limited www.beetalooenergy.com 4
C-5H produced an average 2,635 barrels of fluid per day to the start of the current
clean-up test, with the rate declining to 677 barrels per day at the end of the period. The
volume of water returned is in line with many North American shale analogues and
reflects the large volume of fluid pumped into the generated fracture network.
The volume of fluid pumped at C-5H is several multiples of C-2H and C-3H due to the
longer horizontal section and larger fluid intensity. The materially greater pumped
volume has extended the duration of produced fluid during flowback required to obtain
a “cleaned-up” gas rate. With ongoing production, the gas-water-ratio has continued to
improve toward optimal levels for IP30 testing.
Beetaloo Energy has utilised a managed choke and flowback strategy to maintain
fracture conductivity for long term well productivity. C-5H has been flowing back on a
constant choke setting since the second day of the 30-day clean-up flow testing period.
This has resulted in a more than five-fold increase in fracture conductivity maintained
compared to the previous two Carpentaria wells which supports Beetaloo Energy’s
strategy to prioritise long-term productivity over short-term gas rates.
Carpentaria 5H Ongoing Clean-Up and Second EPT
Flowback operations are continuing to clean-up the well. C-5H will be shut-in once fluid
flowback storage capacity is reached taking into consideration the freeboard that must
be maintained throughout the wet season. Beetaloo Energy intends to carry out a
second extended production flow test with a likely commencement date in Q1 2026.
Beetaloo Energy Australia Limited www.beetalooenergy.com 5
Carpentaria Pilot Project Update
As recently announced, Beetaloo Energy now has all regulatory and Board approvals
required to construct the Carpentaria Pilot Project and sell gas into the local NT market
under the ten-year gas sales agreement with the NT Government, subject to the relevant
conditions within this agreement.
Civil construction works for the Carpentaria Gas Plant are well advanced to support pile
and mechanical equipment installation in 1H 2026. Minor refurbishment works on the
gas compression facilities are underway in Roma, Queensland. Beetaloo Energy will be
relocating the gas plant to site for re-construction and commissioning commencing in
Q2 2026.
Gas sales are expected to start in H2 2026 with production from C-5H, C-3H and C-2H.
Carpentaria Gas Plant pad ready for pile installation.
Beetaloo Energy Australia Limited www.beetalooenergy.com 6
Carpentaria Gas Plant vessel preparation for final inspection in Roma, Queensland.
Carpentaria Gas Plant compressor refurbishment in Roma, Queensland
Beetaloo Energy Australia Limited www.beetalooenergy.com 7
Media and Investor Enquiries Share Registry
Nick Kell Computershare Investor Services
Phone +61 2 9251 1846 Phone 1300 850 505
About Beetaloo Energy
Beetaloo Energy holds 28.9 million acres of highly prospective exploration tenements in the McArthur
Basin and Beetaloo Sub-basins, Northern Territory. Work undertaken by the Company since 2010
demonstrates that the Eastern depositional Trough of the McArthur Basin, of which the Company holds
around 80%, has enormous conventional and unconventional hydrocarbon potential. The Beetaloo Sub-
basin, in which Beetaloo Energy holds a substantial position, has world-class hydrocarbon volumes in
place and a ramp up in industry activity to appraise substantial discoveries already made by major
Australian oil and gas operators is ongoing.
This ASX release has been authorised by the Board of Directors
Beetaloo Energy Australia Limited www.beetalooenergy.com 8
Disclosures under ASX Listing Rule 5
ASX Listing Rule 5.30
(a) Name and type of well Carpentaria-5H, horizontal shale gas well
(b) Location of well and the details of the permit or lease in
which the well is located
Located in Beetaloo’s wholly owned and
operated EP187 tenement, located in the
Beetaloo Sub-basin in the Northern Territory
(c) The entity’s working interest in the well Beetaloo holds a 100% working interest and
operatorship in Carpentaria-5H
(d) If the gross pay thickness is reported for an interval of
conventional resources, the net pay thickness
N/A
(e) Geological rock type of the formation drilled The horizontal section has been drilled in the B
Shale of the Velkerri Formation
(f) Depth of the zones tested The depths of the 2,955 metre (9,625 foot)
fracture stimulated horizontal section tested
range from 1,626 to 1,595 metres (5,007 feet to
5,233 feet) True Vertical Depth (TVD) referenced
to Rotary Table (7.2 metres (23.6 feet) above
ground level). 2.955 metres (9,625 feet) of the
3,310 metres (10,860 feet) horizontal section was
fracture stimulated.
(g) Types of test undertaken and the duration of the tests 30-day initial clean-up gas flow test.
This 30-day clean-up gas flow test was preceded
by ~33 days of stimulation clean-up flow with
gas breakthrough following the fracture
stimulation
(h) The hydrocarbon phases recovered in the tests High Calorific Gas -
C-5H Gas recovery - mole %: Methane 82.77,
Ethane 12.25, Propane 1.61, Butane 0.34,
Pentane and Higher 0.09.
Conversion factor of raw MMSCF to TJ is 1.173
(i) Any other recovery, such as , formation water and water,
associated with the test(s) and their respective proportions
A total of 125,027 bbl of flowback fluid was
recovered by the end of the 30-day clean-up
flowtest, including volumes from prior clean-up
periods. This represents 23.2% of total injected
fluid. Over the 30-day period of measured gas
flow, fluid flowback declined from 2635 bbl/day
to 677 bbl/day
(j) The choke size used, the flow rates and, if measured, the
volumes of the hydrocarbon phases measured
Choke adjustments from 62/64” to 88/64” over
approximately the first two and a half days of
the 30-day clean-up test interval and maintained
at 88/64” to the end of the 30-days. Gas flow
averaged 6.05 MMSCF / day (7.1 TJ/ day) over
the first 30 days. The Day 30 exit rate was 5.4
MMSCF / day (6.3 TJ / day). Total gas flared
during the 30-day clean-up flow test was 181.3
MMCF (212.6 TJ)
(k) If flow rates were tested, information about the pressures
associated with the flow and the duration of the test.
Wellhead pressure ranged from 659 psi to 283
psi during the 30-day clean-up flow test period.
The 30-day clean-up flow test commenced
Beetaloo Energy Australia Limited www.beetalooenergy.com 9
20/11/2025 at 12 AM (ACST) and ended
20/12/2025 at 12 AM (ACST)
(l) The number of fracture stimulation stages and the size and
nature of fracture stimulation applied
67 slickwater stages along an effective
stimulated horizontal length of 2,955 metres
(9,695 feet) executed with a total of ~11,000
tonnes of proppant (sand) placed representing
an average proppant intensity of 2,295 lb/ft
(m) Any material volumes of non-hydrocarbon gases, such as,
carbon dioxide, nitrogen, hydrogen sulphide and sulphur.
Mole %: Helium 0.14%, Carbon Dioxide 0.84%
and other Inert volume 1.95%
(n) Any other information that is material to understanding the
reported results
Not applicable
This announcement contains statements, opinions, projections, forecasts, and other material (“forward looking
statements”). These statements can be identified by the use of words like ‘anticipate’, ‘believe’, ‘intend’, ‘estimate’,
‘expect’, ‘may’, ‘plan’, ‘project’, ‘forecast’, ‘will’, ‘should’, ‘could’, ‘seek’ and other similar expressions. Forward looking
statements may be based on assumptions which may or may not prove to be correct. None of BTL, its respective
officers, employees, agents, advisers or any other person named in this presentation makes any representation as to
the accuracy or likelihood of fulfilment of the forward looking statements or any of the assumptions upon which they
are based and disclaim any obligation or undertaking to revise any forward looking statement, whether as a result of
new information, future event or otherwise.
Share your feedback
Discover