Capital Raise Presentation
Released
Released
Announcement PDF
Investor Presentation
April 2026
2
Beetaloo Energy Australia Limited
This presentation is dated 10 April 2026 and has been prepared by Beetaloo Energy Australia Limited (“Beetaloo Energy” or the Company”) in relation to a non-underwritten placement
of shares in Beetaloo Energy (“New Shares”) to certain wholesale and sophisticated investors (“Placement”) and a non-underwritten follow on share purchase plan to eligible
shareholders, subject to shareholder approval (“SPP”) (collectively, the “Offer”).
Summary information
The information in this presentation is information of a general nature and is subject to change without notice. The information in this presentation does not purport to be complete,
nor does it contain all of the information which would be required in a prospectus prepared in accordance with the requirements of the Corporations Act 2001 (Cth). It contains
information in a summary form only and should be read in conjunction with Beetaloo Energy’s other periodic disclosure announcements to the ASX available at www.asx.com.au.
Certain market and industry data used in connection with this presentation may have been obtained from publications, research, surveys or studies conducted by third parties, including
industry or general publications. The Company nor their respective representatives have independently verified any such market or industry data provided by third parties or industry or
general publications.
Not an offer
This presentation is for information purposes only and is not a prospectus, product disclosure statement or other disclosure or offering document under Australian law or any other law
and will not be lodged with the Australian Securities and Investments Commission. This presentation is not and should not be considered a recommendation, offer or invitation for
subscription or purchase of New Shares and neither this presentation nor any of the information contained in it will form the basis of any contract or commitment.
The distribution of this presentation in jurisdictions outside Australia may be restricted by law and you should observe any of those restrictions. This presentation may not be distributed
in any jurisdiction except in accordance with applicable legal requirements, including those set forth in the section of this presentation under the heading “International offer
restrictions". In particular, this presentation may not be released to US wire services or distributed in the United States. Any failure to comply with those restrictions may constitute a
violation of applicable securities laws.
This presentation does not constitute an offer to sell, or a solicitation of an offer to buy, securities in the United States. The New Shares have not been, and will not be, registered under
the US Securities Act of 1933 (the “US Securities Act”) or the securities laws of any state or other jurisdiction of the United States. Accordingly, the New Shares may not be offered or
sold in the United States except in transactions exempt from, or not subject to, the registration requirements of the US Securities Act and applicable US state securities laws.
Investment risk
An investment in New Shares is subject to known and unknown risks, many of which are beyond the ability of Beetaloo Energy to control or predict. These risks may include, for
example, movements in oil and gas prices, a failure to acquire some or all of the targeted acreage, risks associated with the development and operation of the acreage, exchange rate
fluctuations, an inability to obtain funding on acceptable terms or at all, loss of key personnel, an inability to obtain appropriate licences, permits and or/or other approvals, inaccuracies
in resource estimates, share market risks and changes in general economic conditions. Such risks may affect actual and future results of Beetaloo Energy and its shares.
Disclaimer
3
Beetaloo Energy Australia Limited
Future performance and forward-looking statements
This presentation contains statements, opinions, projections, forecasts, and other material (“forward looking statements”). These statements can be identified by the use of words like
‘anticipate’, ‘believe’, ‘intend’, ‘estimate’, ‘expect’, ‘may’, ‘plan’, ‘project’, ‘forecast’, ‘will’, ‘should’, ‘could’, ‘seek’ and other similar expressions. Forward looking statements may be based on
assumptions which may or may not prove to be correct. None of Beetaloo Energy , its respective officers, employees, agents, advisers or any other person named in this presentation
makes any representation as to the accuracy or likelihood of fulfilment of the forward looking statements or any of the assumptions upon which they are based and disclaim any
obligation or undertaking to revise any forward looking statement, whether as a result of new information, future event or otherwise.
Maps and diagrams
Maps and diagrams contained in this presentation are provided to assist with the identification and description of Beetaloo Energy’s lease holdings and Beetaloo Energy’s intended
targets and potential exploration areas within those leases. The maps and diagrams may not be drawn to scale and Beetaloo Energy’s intended targets and exploration areas may
change in the future.
Financial data
All financial information is in Australian dollars unless stated otherwise.
Effect of rounding
A number of figures, amounts, percentages, estimates, calculations of value and fractions in this presentation are subject to the effect of rounding. Accordingly, the actual calculation of
these figures may differ from the figures set out in this presentation.
No investment or financial product advice
The information contained in this presentation does not constitute investment or financial product advice (nor taxation, accounting or legal advice) and is not a recommendation to
acquire New Shares. The presentation has been prepared without taking into account the investment objectives, financial situation or particular needs of any particular individual. Before
making an investment decision, recipients of this presentation should consider their own needs and situation and, if necessary, seek independent professional advice.
Disclaimer
To the maximum extent permitted by law, Beetaloo Energy and its respective officers, employees, agents and advisers give no warranty, representation or guarantee as to the accuracy,
completeness or reliability of the information contained in this presentation. Further, none of Beetaloo Energy nor its respective officers, employees, agents or advisers accept, to the
extent permitted by law, responsibility for any loss, claim, damages, costs or expenses arising out of, or in connection with, the information contained in this presentation. Any recipient
of this presentation should independently satisfy themselves as to the accuracy of all information contained herein.
Disclaimer
4
Beetaloo Energy Australia Limited
Estimates
The estimates of Contingent and Prospective Resources in the Northern Territory were prepared in accordance with the SPE-PRMS guidelines and are based on, and fairly represent,
information and supporting documentation under the supervision of Geoscientist Dr Alex Bruce, Chief Geoscientist, Beetaloo Energy Australia Limited, a qualified person as defined
under ASX Listing Rule 5.11. Dr Bruce has consented to the use of the resource estimates figures in the form and context in which they appear in this release.
Competent Person’s statement
Dr Bruce is a full-time employee of Beetaloo Energy Australia Limited. Dr Bruce earned a Bachelor of Science with majors in Geology and Environmental Geography from the University
of Sydney, Australia, and first-class honours in Geology / Geophysics from the University of New South Wales, Sydney. Dr Bruce holds a PhD from the University of New South Wales in
Geology and Artificial Intelligence and holds a Graduate Certificate in Geostatistics from Edith Cowan University, Perth, Australia. Dr Bruce is a member of the American Association of
Petroleum Geologists (AAPG) and the Society of Petroleum Engineers (SPE). Furthermore, Dr Bruce has over 25 years of relevant experience in operating oil and gas companies with
much of that time in resource estimation, and as such has sufficient experience to qualify as a Reserves and Resources Evaluator as defined in Chapter 19 of the ASX Listing Rules.
The resource assessment was independently carried out by Mr John G. Hattner, Senior Vice President, and Mr Joseph M. Wolfe, Vice President, of Netherland Sewell & Associates Inc., in
accordance with SPE-PRMS guidelines. Messrs Hattner and Wolfe meet requirements for Qualified Petroleum Reserve Resource Evaluator as defined in Chapter 19 of the ASX Listing
Rules. Mr Hattner is a Licensed Professional Geophysicist in the State of Texas, USA. Mr Wolfe is a Licensed Professional Engineer in the State of Texas, USA. Messrs Hattner and Wolfe
have consented to the use of the resource estimates figures in the form and context in which they appear in this release.
Mr Hattner has over 45 years of relevant experience. His qualifications include an MBA from Saint Mary’s College, California; a Master of Science in Geological Oceanography from
Florida State University; and a Bachelor of Science in Geology from the University of Miami.
Mr Wolfe has over 17 years of relevant experience. His qualifications include a Master of Petroleum Engineering from Texas A&M and a Bachelor of Science in Mathematics from
Northwestern State University.
Petroleum Resources Management System
It is a requirement of the ASX Listing Rules that the reporting of petroleum resources, including estimates of petroleum reserves, contingent resources and prospective resources, in
Australia be classified in accordance with the Petroleum Resources Management System (“SPE-PRMS”) sponsored by the Society of Petroleum Engineers, the American Association of
Petroleum Geologists, the World Petroleum Council and the Society of Petroleum Evaluation Engineers. Investors outside Australia should note that while petroleum resources, including
estimates of petroleum reserves, contingent resources and prospective resources, of the Company included in this presentation are classified in accordance with SPE-PRMS and
reported in the most specific resource class in which petroleum resources can be classified under SPE-PRMS, they may not comply with the relevant guidelines in other countries and, in
particular, do not comply with (i) National Instrument 51-101 (Standards of Disclosure for Oil and Gas Activities) of the Canadian Securities Administrators or (ii) Item 1200 of Regulation
S-K under the US Securities Act, which governs disclosures of oil and gas reserves in registration statements filed with the US Securities and Exchange Commission. Information
contained in this presentation describing petroleum resources, including estimates of petroleum reserves, contingent resources and prospective resources, may not be comparable to
similar information made public by companies subject to the reporting and disclosure requirements of Canadian or US securities laws. You should not assume that quantities reported
as petroleum resources will be converted to petroleum reserves in accordance with SPE-PRMS or any other reporting regime or that the Company will be able to legally and
economically extract them.
Disclaimer
5
Beetaloo Energy Australia Limited
Investment Overview
Beetaloo Energy is unlocking a world-class gas resource to supply domestic & international gas
markets
Substantial Gas Resource in Beetaloo Basin
Holds 100% interest in ~3 million net effective Beetaloo acres containing >46 TCFe 2U
resource and >1.6 TCF 2C resource with <1% CO2
1.
Strategic Market Access
Positioned to supply both domestic gas markets and Asian LNG demand via existing
and planned infrastructure.
Near-Term Production with Clear Commercialisation Pathway
First gas sales targeted for 2026 via the Carpentaria Pilot Project and Gas Sales
Agreement secured with the NT Government.
Accelerating Development with Highly Encouraging Well Clean Up Results
5 wells drilled including Carpentaria-5H, which delivered 67 fracture stages across a 2,955m
horizontal section and achieved a peak gas flow rate of 11.2TJ/day2 during clean up.
1. BTL announcement 29 May 23 Netherland, Sewell & Associates, Inc. Contingent and Prospective Resources, liquids conversion of 6 BCF/MMBBL
2. BTL announcement 22 Dec 25 Carpentaria-5H Clean-Up Flow Test Update
Carpentaria Pilot Project Funding
Upsized $45 million Midstream Infrastructure Facility secured with Macquarie Bank to
develop the Carpentaria Gas Plant.
1.6 TCF
2C Contingent Gas Resources1
~3 million ac
Prospective Net Acreage1
46 TCFe
2U Prospective Gas Resources1
10 PJ
Initial Pilot Area EUR per Well2
6
Beetaloo Energy Australia Limited
Introduction
Beetaloo Energy is an ASX-listed upstream gas company focused on appraising and developing
unconventional gas resources of the Beetaloo Basin in the Northern Territory, Australia
NT Government Mid-Process
7
Beetaloo Energy Australia Limited
Beetaloo Energy Value Catalysts
Strategic Vision Value Proposition
Phase 2 Domestic Gas Project
• ~200TJ/d to supply Australian east coast
• ~2.6 million net effective acres of ‘running
room’ across Western Beetaloo
Phase 1 Carpentaria Pilot Project
• Up to 25 TJ/d
• Targeting first revenue in 2026
Phase 3 Full Field Development - LNG
• ~1 BCF per day to supply LNG export
market
Largest 100%-owned acreage position across the Beetaloo
and McArthur Basins
Simple royalty regime with High Net Revenue Interest of
~85-90%1 vs typical US NRI ~75%
1. Net revenue interest (NRI) equals Working Interest (100%) net of 10% Northern Territory Government royalty (partially offset by statutory deductions), Traditional Owner royalty and private royalties
Structural gas shortages domestically and internationally
underpin long-term demand and price support
Strong government and infrastructure alignment
accelerating the pathway to commercialisation
Key Near Term Catalysts
Ministerial approvals and Final Investment Decision
Q2 2026: Recommence the Carpentaria-5H flow test
Q3 2026: Installation of Carpentaria Gas Plant and tie-in 3 production wells
Q4 2026: Commence Carpentaria Pilot Project gas sales
Increasing confidence in the Beetaloo Basin with recent
uptick in appraisal programs and investments
Strong exposure to acreage re-rating with significant
upside as resources are de-risked
8
Beetaloo Energy Australia Limited
Corporate Snapshot
Pangaea Resources 11.4%
Elphinstone Group 6.6%
Liberty Oilfield Services (USA) 3.9%
Macquarie Group 2.1%
BTL top 20 shareholders hold 56.0%; top 50 shareholders hold 65.1%
Shares on Issue1
1,247.4M
In the Money Options2
(exercisable at A$0.24/share) 99.8M
Share Price A$0.345
Market cap A$430.3M
Debt3
(6 Apr 2026) A$27.3M
Cash (6 Apr 2026) A$22.8M
Enterprise Value A$434.9M
1. As at 2 April 2026, BTL has 28.5m share rights on issue to members of the management team and Board, 21.2m of which have performance hurdles tied to total shareholder return or service period thresholds.
2. As at 2 April 2026, BTL has 96.1 million options on issue with an exercise price of A$0.24 expiring on 26 August 2027, and 3.7million options with an exercise price of A$0.24 expiring on 2 September 2027. Both tranches are in the money and, if fully
exercised, would generate total proceeds of approximately A$24million for BTL.
3. Total available debt of A$65.0, comprising: (i) A$30.0 million revolving R&D facility (drawn to $25.4m); (ii) A$5 million performance bonding facility (drawn to A$2.8 million), representing a contingent liability; and (iii) A$30m Midstream
Infrastructure Facility (undrawn).
Peter Cleary Chairman
Alex Underwood Managing Director & CEO
Karen Green Non-Executive Director
Louis Rozman Non-Executive Director
Prof. John Warburton Non-Executive Director
BTL 12-Month Share Price & Volume (7 Apr 2026)
Capital Structure (7 Apr 2026)
Board of Directors
Top Shareholders
0
10
20
30
Apr
25
May
25
Jun
25
Jul
25
Aug
25
Sep
25
Oct
25
Nov
25
Dec
25
Jan
26
Feb
26
Mar
26
Apr
26
0.00
0.10
0.20
0.30
0.40
Volume
(m)
Price
(A$)
9
Beetaloo Energy Australia Limited
International and Domestic Gas Supply Deficit Looming
A structural supply gap is emerging across both international and domestic markets
Forecast global LNG supply
deficit mid-2030s
1. Shell LNG Portfolio Strategic Spotlight, March 2026.
2. AEMO Gas Statement of Opportunities March 2026, Figure 39. Southern states include NSW, ACT, SA, TAS and VIC. Northern states include QLD and NT.
3. AEMO 2025 Inputs, Assumptions and Scenarios Report, August 2025 Section 3.3.11 Data centre forecast
Southern States AEMO Supply Forecast, PJ p.a.2
Shell Global LNG Demand Outlook, mtpa1
AEMO3 forecasts rapid growth in data centre
electricity demand - rising ~25% p.a. to 12 TWh
by 2030 ≈6% of National Energy Market supply)
0
50
100
150
200
250
300
350
400
2026 2029 2032 2035 2038 2041 2044
Existing and Committed Supply Anticipated Supply
Flow from North Step Change Demand
Supply Gap
Increasing reliance on gas flow
from the North (QLD & NT
including the Beetaloo Basin)
10
Beetaloo Energy Australia Limited
Beetaloo Strategically Located Near Asian LNG Markets
Australian domestic gas and Asian LNG indices trade at multiples of US Henry Hub prices
1. Blomberg NEF, Beetaloo Energy
2. EIA 30/03/2026 Henry Hub Natural Gas Spot Price
3. AEMO Wallumbilla Benchmark Price at 03/04/2026 A$10.15/GJ (1 GJ to 0.9478 MMBtu; FX AUD/USD 0.7)
4. ACCC LNG netback price series 01/04/2026. “LNG netback price is a measure of an export parity price that a gas supplier can expect to receive for exporting its gas. It is calculated by taking the price that could be received for LNG and subtracting or
‘netting back’ the costs incurred by the supplier to convert the gas to LNG and ship it to the destination port”
5. ACCC Market Advice and Estimates of Contemporary LNG Contract Prices June 2025 Report #7
6. ACCC LNG Freight Rate Estimates - Results June 2025
LNG Tanker Sailing Days to Tokyo Bay1 Gas Market Reference Prices, US$/MMBtu
2.88
3.85
6.73
12.76
US Henry Hub² Premium to
Henry Hub
Wallumbilla Hub
(East Coast, Aus)³
Wallumbilla LNG
netback⁴
LNG Shipping Cost Estimates, US$/MMBtu
US Gulf Coast to Asia5 $2.30
Gladstone, AU to Japan6 $1.14
11
Beetaloo Energy Australia Limited
Expanding Connections to Market for Large Gas Volumes
Access to Darwin and East Coast LNG processing and export facilities
Ichthys LNG: two train LNG facility
Capacity: 9.3 mtpa
Planned expansion to three trains
Darwin LNG: single train LNG facility
Capacity: 3.7 mtpa
Potential expansion to two train
APLNG: multi train LNG facility
Capacity: 9.0 mtpa
GLNG: two train LNG facility
Capacity: 7.8 mtpa
QCLNG: multi train LNG facility
Capacity: 8.5 mtpa
Potential expansion to three train
APA Group & Territory Energy Link
open access pipelines
12
Beetaloo Energy Australia Limited
Velkerri Shale is Analogous to the Prolific Marcellus Shale
Data from Beetaloo Energy’s wells, covering more than a million acres, confirms the Velkerri “B
shale” reservoir properties are comparable with the prolific Marcellus Shale
Effective Porosity (%)
Ro (%)
Sg (%)
TOC (%)
TVD (ft)
Pressure Gradient (psi/ft)
Frackability (1-Clay %)
Quartz (%)
Net Thickness (ft)
Gas in Place (Bcf/sq mi)
Source: Beetaloo Energy, EIA
SW Marcellus Shale
Velkerri “B” Shale Only
Similar level of overpressure
Equivalent organic content
Slightly shallower so
drill times should be reduced
Favourable mineralogy for
fracture stimulations, high
quartz and low clay
High gas and
low water saturation
High gas concentration
per sq mile
B Shale alone thicker
than Marcellus
Excellent storage capacity
Thermally mature source rocks
7%
6.2%
1.8%
1.6%
75% 75%
4.0%
6,500'
5,500'
0.60
0.55
65%
70%
60%
60%
150'
250'
100
100
4.0%
• In addition to the 100 BCF/sq
mile resource in the B Shale,
Beetaloo Energy’s Velkerri Shale
stacked play exceeds 160 BCF/sq
mile
• The Velkerri shales have
consistently low CO2 (<1 mole%)
and have produced dry to high
calorific gas
13
Beetaloo Energy Australia Limited
Two Focus Areas in the Basin
5 TCF gas pilot ready Carpentaria Project with >20
TCF Western Beetaloo resource1
Focus Area 1:
Carpentaria Project (EP187) (5 TCF pilot ready) targeting first production in
Q4 2026 to supply the Northern Territory Government under a 10-year
binding Gas Sales Agreement2.
Focus Area 2:
Western Beetaloo (EP167/168) >20 TCF resource providing material
drilling inventory
Infrastructure:
• Acreage is adjacent to existing pipeline, rail and road infrastructure to
facilitate rapid commercialisation
• Major infrastructure players, including APA, Jenema and AGIG, have
planned pipeline expansions to connect Beetaloo gas to domestic and
global markets
• NT Government is also investigating an infrastructure corridor which
includes gas, water and optical fibre to connect the Beetaloo Basin to
Darwin
1. BTL announcement 29 May 23 Netherland, Sewell & Associates, Inc. Contingent and Prospective Resources; BTL announcement 14 Apr 21 Transformational Acquisition of Pangaea Resources; Company analysis of 3C and 2U.
2. BTL announcement 26 Jul 24 Binding Gas Sale Agreement with NT Government
14
Beetaloo Energy Australia Limited
Stacked Play Improves Development Economics
C Shale
B Shale
Intra A/B
A Shale
Marcellus
100
m
328
ft
Single Reservoir
Four Stacked Reservoirs
Total Marcellus
Thickness ~60 m
Stacked shale play developments allow for:
• More wells per pad
• Improved development efficiencies and
economics
• Analogous to Permian Basin style development
Stacked Play Development Example
Beetaloo Energy’s four
stacked shale reservoirs
are 5x thicker than the
prolific Marcellus Shale
Carpentaria-4 Type Section
SW Marcellus Section
Total Net Thickness >300 m
Multi-Zone Cube
Development –
Delaware Basin1
1. Devon Energy Cube Development: What, How, When and Why? November SPE BD Group
Presentation, 28 November 2018
Gas Saturation
0 100%
Gamma Ray
Depth
M (ft)
(5000)
(5500)
(6000)
0 100%
Gas Saturation
(6200)
(6000)
(5800)
(6400)
Depth
(ft)
Gamma Ray
15
Beetaloo Energy Australia Limited
Thickest Section of the Stacked Play Within Beetaloo Energy Permits
• Beetaloo Energy’s project areas located across the thickest
section of stacked Velkerri Shale reservoirs in the basin
• Carpentaria Project has >300 m gross thickness of A, Intra
A/B, B and C Shale reservoirs
• Western Beetaloo Project has the thickest stacked B and C
Shale in the Beetaloo
Beetaloo Energy’s “stacked shale play” results in
up to 4x increase in the net effective acres
compared to the B Shale alone
Combined Thickness of A, Intra A/B, B and C Velkerri Shales
16
Beetaloo Energy Australia Limited
• Delivers higher energy content compared to dry gas (1 mcf ≈ 1.15 GJ vs 1.05 GJ)
• Enables ~10% higher sales price per mcf of production
Carpentaria Project Has High-Quality, Low CO2 Gas
Beetaloo Energy’s low CO2 (<1%) and high ethane (~12%) is perfectly positioned
to be blended with emerging Ichthys Gas supply to:
• Reduce average CO2 content (lessen need for CO2 stripping and carbon, capture
and storage)
• Increase ethane content (attractive to Japanese energy market given high heating
value required and lessen the requirement for ethane spiking of gas into plant or
upon arrival in Japan)
• Support Ichthys LNG back-fill and planned expansion to three trains by 20303
1. Upstream Article – Inpex steps to the staring line for Ichthys phase (March 2021)
2. Ichthys Gas Field Development Project - Draft Environmental Impact Statement (2008) – Chapter 4 p.164
3. INPEX commits to LNG expansion (2022) – www.territorygas.nt.gov.au
Methane
83.0 %
Ethane
12.2 %
Carbon Dioxide - 0.9 %
Propane+
1.8 % Nitrogen
2.0 %
Avg. Carpentaria-2H Gas Composition – Mole %
Beetaloo Energy’s Carpentaria Project gas composition provides ~10% value uplift over dry gas
Gas for Ichthys LNG in Darwin is supplied from the Brewster Member and the Plover
Formations which comprise the Ichthys Gas Field
• Production has mainly been from the Brewster Member; however, production is
expected to move towards Plover and peak in the 2030s as Brewster is depleted1
Carpentaria Project gas has enhanced energy and value driven by its elevated ethane
and low CO2 content which:
Minimal to
no H2S
Brewster: ~8% (CO2), ~11% (ethane)
Plover: ~17% (CO2), ~4% (ethane)2
17
Beetaloo Energy Australia Limited
Activity in the Beetaloo Basin is Accelerating
Four multi-horizontal well projects located throughout the basin
Capital Raising
19
Beetaloo Energy Australia Limited
Offer Overview
• Beetaloo Energy Australia Ltd (“Beetaloo Energy”, “BTL” or “the Company”) is undertaking an equity raising via a Placement and
Share Purchase Plan (“SPP”) (collectively “the Offer”) to raise A$66.3 million via the issuance of 236,835,714 new fully paid ordinary
shares (“New Shares”) at an issue price of A$0.28 per New Share. The Offer consists of:
an institutional placement to raise A$66.3 million via the issuance of 236,835,714 million New Shares utilising the Company’s
existing placement capacity under ASX Listing Rules 7.1 and 7.1A (“Placement”); and
a non-underwritten SPP to existing eligible shareholders to raise up to approximately A$5 million via the issuance of up to
17,857,143 New Shares at the same price as the Placement, which will be subject to shareholder approval.
• Macquarie Bank has committed to cornerstone participation in the Placement with a A$6 million subscription.
• The Board of the Company have endorsed the Offer, committing to subscribe for 1,535,714 New Shares (representing approximately
A$0.43 million) to the Placement, subject to shareholder approval, as required by the ASX Listing Rules.
Offer Price
• Offer Price of A$0.28 per New Share, which represents an 18.8% discount to the BTL closing price of A$0.345 per share on 7 April
2026, a 17.5% discount to the 5-day volume weighted average price (“VWAP”) and a 6.7% discount to the 15-day VWAP.
Use of
Proceeds
• Proceeds raised through under the Offer, along with existing cash and undrawn funding under the refinanced Macquarie Facility (if
required), will finance the completion of the Carpentaria Gas Plant, procurement of future work program long lead items, flow testing
of Carpentaria-5H, seismic acquisition in the Western Beetaloo, investment in Territory Sands, working capital and costs of the Offer.
Share Purchase
Plan
• Beetaloo Energy will conduct a non-underwritten SPP targeting to raise up to approximately $5 million. The SPP will have an issue
price equal to the Offer Price for the Placement. Further details of the SPP will be contained in the SPP offer booklet. Given the SPP is
being undertaken within 12 months since the previous SPP announced on 16 May 2025, the SPP will be subject to shareholder
approval, at the Company’s AGM on or around 29 May 2026, as required under the ASX Listing Rules.
Ranking • New Shares issued under the Offer will rank equally with existing shares on issue.
Syndicate • Blue Ocean Equities Pty Ltd and Morgans Corporate Ltd have been appointed as Joint Lead Managers to the Placement.
Capital Raise Overview
20
Beetaloo Energy Australia Limited
Funding Sources & Uses
A$66.3M Placement fully funds the Carpentaria Pilot Project to first gas
Sources A$M Uses A$M
Placement 66.3 Completion of Carpentaria Gas Plant Works 36.5
Director Participation in Placement¹ 0.4 Additional Working Capital2 39.4
Upsized Macquarie Midstream Facility (undrawn) 45.0 Future Work Program Long Lead Items 4.2
Cash at Hand 22.8 C-5H Flow Testing 3.3
Western Beetaloo Seismic Works 3.5
Territory Sands Investment 10.4
NT Operations (to first gas) 4.0
Corporate G&A 6.8
Minimum Cash Balance (Macquarie Facility) 10.0
Partial Repayment of Macquarie R&D Facility 13.0
Costs of Offer 3.4
Total Sources 134.5 Total Uses 134.5
1. Subject to shareholder approval
2. Sufficient funds to drill a 3km horizontal well and fracture stimulate 1km of horizontal section. If existing in the money options are exercised there would be sufficient funds available to stimulate the full 3km horizontal section.
21
Beetaloo Energy Australia Limited
Use of Funds - Carpentaria Pilot Project
Production Wells
Carpentaria-2H, Carpentaria-3H and Carpentaria-5H
EMP’s fully approved for additional pilot wells
Facility
Civil works for the Carpentaria Gas Plant completed Jan-2026.
Mechanical refurbishment of plant equipment in Roma completed
Mar-2026
• On-site installation of the Carpentaria Gas Plant to commence in Q2
2026
Offtake
T-piece inserted into the McArthur River Gas Pipeline
Traditional Owner approval to the sale of appraisal gas
• Pipeline compression to increase capacity up to 25 TJ/d during the
pilot phase
Beetaloo Energy is on track to deliver first gas sales from the Carpentaria Pilot Project in Q4 2026
Carpentaria Gas Plant Site – Looking North
Early works for the Carpentaria Gas Plant including clearing, earthworks and refurbishment of equipment
in Roma commenced in early October 2025
Piling installation commenced in
February 2026
• Pilot gas sale expected to commence in Q4 2026
22
Beetaloo Energy Australia Limited
Use of Funds - Carpentaria 5H Flow Test
Carpentaria-5H (C-5H) achieved strong flow rates with enhanced permeability, underpinning
long-term performance1
KEY METRICS
• Length: 2,955 metres (9,695
feet)
• Stages: 67 stages executed
• Fluid intensity : 52 bbl/ft avg
• Proppant intensity: 2,295 lb/ft
avg
• Proppant per stage: 337,000 lbs
avg
• Strong clean-up flow performance: C-5H achieved a peak gas
flow rate of 11.2 TJ/day and a 30-day average of 7.1 TJ/day, with a
Day-30 exit rate of 6.3 TJ/day
• Disciplined flowback strategy applied: Use of a restricted-choke,
extended clean-up methodology resulted in a >5× increase in
maintained fracture conductivity relative to earlier Carpentaria
wells, consistent with a focus on long-term well performance
• Positive reservoir indicators: Flow
Share your feedback