Empire Energy – Beetaloo Basin – On the Path to Pilot Production and Beyond
NAPE Conference Houston Presentation
The Empire Energy Value Proposition
Commercialisation Strategy
Global Scale Gas Resource
▪ 42 TCF 2U Prospective Resource*
Phase 1
▪ ~1.6 TCF 2C Contingent Resource* based on limited
▪ Up to 25 TJ/d (24 mmcf/d)
well control (significant upside with further drilling)
▪ Sub 1% CO2 in reservoir
▪ >1 million acres in two contiguous acreage positions
▪ Connected to existing pipeline infrastructure with
additional pipelines by APA Group to Australian East
Coast and Darwin planned
▪ World class shale characteristics
* As independently assessed by Netherland, Sewell & Associates, Inc
Key assumptions:
1. Phase 1
▪ Gas price: A$12/GJ
▪ Production: 25 TJ /d
2. Phase 2
▪ Gas price: A$12 / GJ (indexed at CPI)
▪ 1,353 PJ (1.2 TCF) produced over 40-year economic life
▪ Type curves as provided by Subsurface Dynamics Inc
▪ Drilling / fracture stimulation (per well): A$32m
▪ Cost learning curve: 5% per drilling campaign and 5% per stimulation campaign
▪ Opex includes midstream infrastructure tariffs, NT Government and other royalties, carbon offsetting costs
3. Phase 3
▪ As per Phase 2 with the exception of cost learning curve: 7.5% per drilling campaign and 10% per stimulation
campaign representing expected economics of scale benefits
▪ 6,700 PJ (5.7 TCF) of gas produced over 42-year economic life
4. Landed LNG Cost to Japan
▪ Total upstream cost (including gas processing tariffs): ~US$4.00 MMBtu
▪ Pipeline tariff, LNG processing tolling and shipping: ~US$2.50 MMBtu
▪ Targeting first revenue in 2025, ramping up to ~A$110m
per annum at plateau1
▪ Mature resource definition and type curves for larger
scale development
Phase 2
▪ ~200TJ/d (~190 mmcf/d) to supply Australian east coast
▪ P50 IRR: ~37%, P50 NPV(10): A$2.5bn2
Phase 3
▪ ~1 BCF per day to supply LNG export markets
▪ P50 IRR: ~52%, P50 NPV(10): A$14.2bn3
▪ Empire estimates a landed cost of LNG into Tokyo Bay
of US$6.50 / MMBtu4
1
Australia, Asia and the World Need New Gas Supply
• Royal Dutch Shell estimates global LNG demand will reach 700 million tonnes by 2040 (2022: 396mt), as demand for natural
gas continues to grow strongly in Asia and gains further traction in powering hard-to-electrify sectors, tackling air quality
concerns and meeting emissions targets
• In the near-term, the global LNG market is expected to remain tight and exposed to supply and demand shocks, with limited
new supply coming online. Shell notes that more investment in liquefaction projects is required to avoid a supply-demand gap
that is expected to emerge by the late 2020s
• While natural gas accounts for about a quarter of global electricity generation, half the total natural gas produced today is
consumed in sectors other than power generation
• Australian east coast domestic gas market is finely balanced. New supply sources such as the Beetaloo are required to meet2
projected supply shortfalls
Empire’s 28.9 million acre footprint
• All acreage is 100% owned and operated by
Empire with no private royalties. Net Revenue
Interest of ~87%1
• Empire is the largest net acreage holder in the
Beetaloo
• Access to existing infrastructure: Stuart Highway,
Darwin to Adelaide rail corridor and the
Amadeus Gas Pipeline (connecting to the East
via the Northern Gas Pipeline)
• Empire’s four wells in EP187 have delineated a
large discovered gas resource including two
horizontal wells, fracture stimulated, and flow
tested have demonstrated production
deliverability
1. The difference between working interest and net revenue interest (NRI) represents the Northern Territory Government and Traditional
Owner royalties
• Empire has spent ~A$90m in EP187, supported by
~A$44m in Australian Government funding
3
Empire has an Enormous Resource
• Total basin-wide Prospective Resources in the Velkerri B shale
alone is >100 TCF (one of five productive shale units) based on
Government estimates of 500 TCF gas-in-place (assuming
recovery factors of between 10% and 20%)
+500 TCF
GIIP
• Large enough to supply both LNG and east coast markets.
Beetaloo Basin
• Empire (100%) NT 2C Contingent Resource of 1,906 PJ (1.63
TCF) gas and 3.5 MMBBLs liquids1
Amadeus Basin
0.22
• Empire (100%) EP187 2C Contingent Resource of 1,739 PJ (1.5
29.3
Cooper Basin
TCF) at an average EUR per well location of 7.9 PJ
1.0
Bowen &
Surat Basins
• Empire (100%) P(50) Prospective Resource of 44,541 PJ (41.67
TCF) gas and 764 MMBBLs liquids.1,2
Otway Basin
Gippsland Basin
0.6
0.02
Source: Netherland, Sewell & Associates Inc
1. Western Beetaloo 1.06 PJ per BCF applied
2. Barney Creek – McArthur Basin targets, 1.06 PJ per BCF applied
1.7
Beetaloo Velkerri B GIIP Estimate
Bass Basin
(SEAAOC 15 November 2018)
2P Reserves (TCF)
(Energy Quest as at 31 March 2023)
4
Empire has Grown its Certified 2C to LNG Scale
Empire’s on ground activities have grown discovered resources to an LNG Scale
EP187 Contingent Resources (100%) as at
May 2023
Net Sales Gas
High
Estimate
(3C)
Low Estimate Best Estimate
(1C)
(2C)
Total
304 PJ
(260 BCF)
1,739
(1,483 BCF)
3,507
(2,991 BCF)
Average EUR Per Development
Well
6.2 PJ
(5.3 BCF)
7.9 PJ
(6.7 BCF)
9.3 PJ
(7.9 BCF)
• Further 2C Contingent Resources in the Western Beetaloo
with large “running room” on 2C resource is constrained
by well control
• Additional delineation with further drilling will almost
Key Drivers
of 2C Uplift
▪
▪
Carpentaria-1 drill
Pangaea
acquisition
▪
▪
▪
Carpentaria-1 EPT
▪
Carpentaria-2H drill ▪
Charlotte 2D seismic
survey
▪
Carpentaria-2H EPT
Carpentaria-3H drill
and EPT
Carpentaria-4V drill
certainly increase 2C Contingent Resources given
Petroleum Resources Management System constraints in
resource booking
• Success in the pilot program may facilitate maiden 2P
reserve booking
Note: Refer to EEG announcement dated 29 May 2023 for Netherland, Sewell & Associates, Inc. Contingent and Prospective Resources
5
Empire’s Beetaloo Footprint Comparable to Marcellus
• Empire’s Beetaloo footprint is comparable in size to significant
portions of the core areas of the Marcellus Shale play in the
Appalachian Basin
• More than 9,000 wells are producing from similar depths to
Empire’s Beetaloo play (~34 percent of all Marcellus wells)1
across both core areas
• The majority of the more than 27,000 producing Marcellus
Shale wells are less than 2,250 metres below ground level
• Marcellus shale producing acreage has typically transacted
“Marcellus shale
gas production has
grown by 25 BCF/d
over ten years”
BCF/d
at US$5,000 to US$25,000 per acre2. Empire is valued at ~US$80
per acre based on the Carpentaria Project and Western
Beetaloo Project alone.
Source: U.S. Energy Information Administration - EIA - Independent Statistics and Analysis
1. EIA and relevant State databases
2. https://mercercapital.com/energyvaluationinsights/ma-in-marcellus-utica-basins-2
6
Empire’s First Horizontal Well Flow Test A Success
• Carpentaria-2H (“C-2H”) produced a total of 323 TJ (281 mmscf)
over 127 days
Stylised Schematic
Vertical
Exaggeration 5:1
Without Vertical Exaggeration
C-2
Carpentaria-2H is the fourth horizontal well in the basin, was drilled 100% within zone, and
successfully flowed gas to surface from all 21 frac stages with basin leading low rates
day for an equivalent 3,000m horizontal development well for
the entire test period
• Gas composition remained consistent with high calorific value and
extremely low CO2 (less than 1%)
• C-2H was brought back online after an initial 51 days of testing to
test the benefit of soaking with excellent results
B Shale
65m (~213 ft)
• This equates to a normalised rate of 8.25 TJ (7.2 mmscf) per
Target depth
1,600m (5,250 ft)
1,345m (4,411 ft) Horizontal Section
• The post-soak 2023 IP30 is confirmed at 10.5 TJ (9.2 mmscf) per
day for an equivalent 3,000 metre horizontal development well
• Completed without the need for production tubing, well freeflowed through 4 ½” casing. Empire is likely to move to 5 ½” in
future scenarios
• These rates exceed the benchmark other Beetaloo players have
put forth as commercial, at a capital cost of ~2/3 of Empire’s peers
Carpentaria-2H flare
7
Empire’s Record Breaking Carpentaria-3H Horizontal Well
Carpentaria-3H is the longest horizontal shale well, and the largest frac job ever executed
in Australia, on time and ~A$6m under budget
• Empire’s second horizontal well
Stylised Schematic
Vertical
Exaggeration 5:1
Without Vertical Exaggeration
• Total horizontal lateral length of 2,632m (8,633 ft), with 2,374 m (7,786 ft) successfully
placed within the target Velkerri B shale (90% in zone), with strong gas shows
throughout the target zone
2,632m (8,633 ft) Horizontal Section
• Confirmed long horizontals can be drilled in the Beetaloo using Australia’s
• Carpentaria-3H successfully stimulated, significantly below budget, executing all
planned 40 stages across 1,989m (6,526 ft)
C-2
existing rig fleet and generating material cost efficiency gains
• A total of 12.8 million lbs of proppant placed, averaged 319,000 lbs per stage
Target depth 1,750m (5,250 ft)
(~2,000 lbs/ft). Comparable to US Shale frac intensity
• Carpentaria-3H was brought back online on 3 August 2023 and has demonstrated
the material benefits to productivity of soaking, through significantly increased gas
flow rates
• Following reopening, Carpentaria-3H flowed gas at an average rate of 3.3 mmscf /
day (3.8 TJ / day) over the first 30 days (“IP30”)
• The Carpentaria-3H “post-soak” average daily production rates have increased
30% over the IP27 “pre-soak” test conducted in Q1 2023
• Empire is investigating optimisation of the per stage performance compared to C-
2H. Evidence of plug failures have likely contributed to materially lower productivity
which can be resolved in future wells. Well bore undulation and faulting, may have
also contributed to underperformance
8
SLB 185 Rig drilling Carpentaria-3H in EP187
Western Beetaloo Project Overview
Comprehensive well and seismic datasets in the Western Beetaloo Project have defined a
large extensive resource
• Very Large area and resource - 100+ TCF GIP within Notice of
Discovery (B Shale only) - over 1 million acres of dry to high calorific
gas with low CO2, close to rail, road and pipeline infrastructure
• Same rocks as Carpentaria Project – horizontal drill ready
• Strategically located near gas pipeline, highway and rail line
• Environmental approvals submitted to the Regulator for:
- The acquisition of up to ~380 km in-fill 2D seismic orientated for
future horizontal wells
- Clearance for drilling, stimulation and flow testing of up to six
horizontal wells on six well pad locations
• Land access agreements executed with pastoralists
• The approvals have the potential to accommodate numerous
production wells in a future commercial development scenario
• Current 2C Contingent Resource of 167 PJ1 (158 BCF) (+3.5 MMBBLS)
• Current 3C Contingent Resource of 441 PJ1 (416 BCF) (+14.1 MMBBLs)
• Current P(50) Prospective Resource of ~28 TCF and 764 MMBBLs
1. 1.06 PJ per BCF applied by Empire
EP 167 and EP 168 100% EEG
9
Basin-wide Appraisal Drilling is Demonstrating the Commercial Case
• Empire drilling and fracture
stimulation costs ~2/3 of deeper
wells (on a like for like basis)
• Empire generating strong flow rates
on a per dollar of capex basis,
building the economic case for the
basin flanks
• Empire’s gas has a higher energy
content than dry gas (with positive
implications for revenue)
• 100% interest in all properties and
no private royalties maximises farm
out flexibility and economics
• Empire’s extremely low in-situ CO2
reduces offset costs
• Flow rates achieved are from short
lateral tests
10
Rosalind Park Gas Plant Acquisition
• Empire has acquired AGL Limited’s (AGL) Rosalind Park Gas Plant (RPGP)
which significantly accelerates the path to Pilot Project gas production
• RPGP has a design capacity of 42 TJ/d (40 mmcf/d)
• RPGP is a fit for purpose facility that meets all Carpentaria pilot
specifications and has passed stringent technical due diligence
requirements
• RPGP supported the Camden Gas Project and was decommissioned
prematurely in August 2023 following a corporate decision to move away
from gas operations in greater Sydney metropolitan area:
• The RPGP was in Menangle NSW (near Sydney), where natural gas was
collected via low pressure underground gathering lines, compressed,
dried and made ready for use by households and businesses, and
transmitted into the Sydney natural gas network
RPGP at Menangle NSW
• RPGP is ~20 years old, peak production was ~15 TJ/d
• Empire has transported the RPGP to storage facilities in Roma in proximity
of Enerflex Engineering operations where the equipment will be refurbished
in readiness for transportation and reassembly at the Carpentaria Pilot
Project in 2024
• Empire continues to work with APA under its Initial Agreement which may
Empire estimates that the acquisition of the
RPGP may result in >$30 million in cost
savings and reduce the lead time by ~12
months compared to new build alternatives
result in the funding of the engineering and construction of midstream
infrastructure assets, if further approvals are obtained and long form
agreements are entered into
11
Connections to Market for Large Gas Volumes
• APA Group (ASX: APA) and Empire have executed an agreement
for the establishment of midstream gas infrastructure furthering the
memorandum of understanding announced by Empire on 27
October 2021
• APA will spend up to A$5 million under a proposed early works
agreement on Engineering and Design Concepts for midstream gas
facilities associated with Empire’s Carpentaria Pilot Project, which
would materially reduce the capital requirements for Empire to
commence commercial production
• APA and Empire are also working on open-access pipeline
concepts to transport large volumes of gas from the Beetaloo to
Australian east coast markets (in excess of 500 TJ/d / 476 mmcf/d).
The leading concept considers the potential construction of a new
pipeline connecting the Beetaloo to APA’s existing Carpentaria
Gas Pipeline between Mount Isa and Ballera (Queensland)
• Negotiations with NT Government owned utility Power and Water
Corporation under the existing MOU are advancing to facilitate
access to the McArthur River Pipeline
• Empire is currently in active gas sales negotiations with multiple
parties for supply of gas in both the pilot phase and full
development phase
12
The Beetaloo Strategically Located Near Asian Markets
LNG Tanker Sailing Days to Tokyo Bay1
• Darwin currently has installed LNG export capacity at Ichthys
and Darwin LNG of 12.6mtpa with environmental approvals in
place to increase to 27.8mtpa
• Kevin Gallagher, Santos Managing Director:
• “We have approval for two more trains at DLNG and we
are open to third party gas opportunities,”2
• Darwin currently supplies >10% of all LNG to Japan3
• Globally competitive LNG offering for growing Asian LNG
markets with the lowest transportation cost of all major supply
hubs
• Empire’s estimated landed cost of LNG into Tokyo Bay
• Estimated landed cost: US$6.50 / MMBtu
• Total Upstream Cost (including APA tariff): US$3.50 – US$4.00
/ MMBtu
• Pipeline tariff, LNG processing tolling, shipping: US$2.50 /
MMBtu
Source:
1. BloombergNEF, Tamboran Resources
2. Santos release “Santos and Eni sign MOU to Collaborate in Northern Australia and Timor-Leste” dated 3 May 2021
3. https://territorygas.nt.gov.au/gas-strategy/our-gas-led-growth-story/expand-darwins-world-scale-lng-hub
• Current Japan/Korea Marker (Platts) LNG price
• US$9.77 MMBtu (as at 25 January 2024)
13
Northern Territory Gas Market Overview
The local NT gas market is in crisis due to the decline of existing supply sources
Demand Overview
• Uses 25 to 30 PJ (or 70 to 80 TJ/d) of gas p.a.
• Sources of demand include:
• NT Government (via Power and Water Corporation (PWC) and Territory
Generation (TGen)) for power generation
• EDL (independent electricity producer)
• Mining: McArthur River Mine (Glencore), Tanami Gold Mine (Newmont)
Supply Overview
• There are three existing sources of supply for the local NT market:
• Blacktip Gas Field (ENI owned and operated)
• PWC entered a 25 year take or pay with ENI commencing in 2009
for all of Blacktip volumes (up to 860 PJ). In accordance, with the
GSA PWC is entitled to purchase 37 PJ p.a., at a maximum daily
rate of 104 TJ/d [Current supply ~20TJ/d, AEMO]
• PWC on-sells to TGen, EDL and Newmont
• Amadeus Basin (Central Petroleum operated)
• Supplies PWC, McArthur River Mine [Current supply ~40 TJ/d, AEMO]
• Darwin LNG (Santos operated) / Ichthys LNG (INPEX operated)
• Current source of NT emergency gas
• Bayu-Undan field is nearing full depletion
14
Empire – Beetaloo Focused Since 2018
Australian Government has supported Empire’s on-ground activities with ~A$44m
February 2015
Pangaea NT farms out
17.5% interest for A$45m
carry to Energy & Minerals
Group (EMG)
2013 - 2017
November 2022
R&D Tax Offset of A$7.8m in
cash received
June 2019
Sale of Kansas oil assets to
Mai Oil for US$19.1m
2018
August 2018
Placement to raise A$15m
Debt convert to equity
US$4m
September 2021
R&D Tax Offset of A$5.3m in
cash received
2019
2020
November 2022
New A$15m credit facility
established with
Macquarie Bank
May 2023
Final Beetaloo Cooperative
Drilling Program received.
A$15.3m received in total
2023
2022
2021
October 2023
R&D Tax Offset of A$15.6m
in cash received
August 2020
Placement to raise A$10m
November 2019
Placement to raise A$12m
September 2020
Options converted to raise
A$8m
• A$200m spent on-ground, representing ~A$0.10 / GJ
finding cost for 2C Contingent Resources of 1,906 PJ
• Empire shareholders have contributed A$126m (net)
of total invested capital1 demonstrating Empire’s
sharp focus on capital efficiency
1. Calculated as equity raised plus Pangaea / EMG acquisition less Australian Government contributions
April 2021
Placement to raise A$30m
Directors contribute a
further A$1.2m
June 2022
Placement to raise A$27.5m
Directors contribute a further
A$0.5m
SPP raises A$2.5m
August 2021
Empire acquires Pangaea
NT / EMG NT for A$57m in
scrip and cash
May 2021
Share Purchase Plan raises
A$6m
A$44m
Non-Share Issuance Capital Raised
A$113m
Equity Capital Raisings
A$57m
Acquisitions
15
Pathway to Carpentaria Pilot Project Production and Revenue
EXPLORATION & APPRAISAL
2021
2022
✓ 2C Contingent Resource: 575 BCFe
✓ 2U Prospective Resources: ~48 TCFe
✓ Gas Sales & Transportation: APA Group and Power and Water Corporation MoUs Executed
✓ Established A$15 million credit facility with Macquarie Bank to move to project financing
KEY ACTIVITIES TO CARPENTARIA PILOT PROJECT FID
✓ Major 2C Contingent Resource upgrade announced for EP187 to 1,739 PJ (1.5 TCF high calorific gas)
✓ Carpentaria-2H flow rates: normalised IP30 of 10.5 TJ (9.2 mmscf) per day for an equivalent 3,000m horizontal development well
2023
and H1
2024
Carpentaria-3H flow rates: IP30 of 3.8 TJ (3.3 mmscf) per day
✓ Carpentaria-4V: intersected the same stacked Velkerri Formation shales as the Carpentaria Project wells thereby opening the
Carpenaria East Area
✓ Front End Engineering & Design (“FEED”): including engineering, economic modelling etc. Gas plant secured
▪ Pilot development (up to 25 TJ/d) – over A$110m revenue per annum @ A$12/GJ
✓ Subsurface design planning
1. Execute gas sales and transportation agreements – discussions ongoing with multiple parties
2. Arrange financing for pilot (Macquarie Bank credit facility already in place)
3. Obtain government approvals: NT Petroleum Production Licence over Carpentaria
4. Negotiate Northern Land Council (“NLC”) Production Agreement with Traditional Owners
POST FID
2024
1.
Pilot project construction
2025
1.
2.
First gas sales
Planning to move to full development (200 TJ/d+ to East Coast then >1 PJ / day LNG export via Darwin)
16
Pathway to Full-Field Development of the Carpentaria Project
Year
2024
• Construct Carpentaria
KEY ACTIVITIES
Pilot Project midstream
facilities and gas
gathering network
• Drill, fracture stimulate
and connect 3x wells
(3,000m lateral, ~60
stages)
2025
2026
2028+
• Drill, fracture stimulate
• First gas deliveries from
the Carpentaria Pilot
Project (~15TJ/d)
• Planning and
engineering work for fullfield development
Carpentaria Pilot Project
and connect a further
3x wells (3,000m lateral,
~60 stages) to grow
production to ~25TJ/d
• APA to commence work
on pipeline and gas
processing infrastructure
for full-field
development
• ‘Factory’ drilling
• Grow production
beyond 200TJ/d
(~190mmcf/d) to supply
east coast and LNG
markets
Carpentaria Gas Project
17
ASX:EEG
https://empireenergygroup.net/
Alex Underwood
Managing Director
info@empiregp.net
+612 9251 1846
18
Appendix 1: Corporate Snapshot
ASX Share Price
Capital Structure
Shares on issue1
773.1M
Share price
A$0.18
Market cap
A$139.2m
Net (debt2) / cash
~A$8.6m
Enterprise value
~A$130.6m
Cash at bank3
~A$17.3m
• Top 20 shareholders own 61.5%
• Top 50 shareholders own 70.3%
1.
2.
3.
Top Shareholders
Pangaea Resources
18.1%
Elphinstone Group
8.3%
Global Energy and Resources
4.2%
Sheffield Holdings (USA)
4.1%
Energy and Minerals Group (USA)
3.4%
Macquarie Bank
3.4%
Empire has 78.9m unlisted options on issue with an average exercise price of ~A$0.39 per share. In addition, there are 18.6m Share Rights on issue to members of the management team and Board. Most of the Share Rights have performance hurdles tied to total shareholder return.
Empire has a US$7.5 million debt facility (drawn to US$4.7 million) with Macquarie Bank maturing in September 2024 which is secured against the Company’s USA gas production assets. Under new management, total US debt has been reduced by over 80% since 2018. Empire also has in place a
A$2.25 million revolving credit facility (drawn to A$1.8 million) and A$5 million performance bonding facility (undrawn) with Macquarie Bank
As at 31 December 2023
19
Appendix 2: Empire’s Board of Directors
Peter Cleary
Alex Underwood
Karen Green
Louis Rozman
Prof. John Warburton
Chairman
Managing Director
Non-Executive Director
Non-Executive Director
Non-Executive Director
• Distinguished 29-year career
representing Santos, the
North West Shelf Venturers
and BP in Asia. His executive
career was in LNG, pipeline
gas and chemicals
operations
• Associate Director Energy
Markets Division of
Macquarie Bank Limited
(Sydney and Singapore) for
10 years
• Over 30 years’ experience in
Chartered Accountancy,
predominantly in business
advisory services and has
lived and worked in Darwin
since 1991
• Former Managing Director of
CH4 Gas which merged with
Arrow Energy and later
acquired by PetroChina and
Shell
• Highly regarded petroleum
geoscientist experienced in
big fields
• Member of the Executive
Committee of the Australia
Japan Business Co-operation
Committee and the Australia
Korea Business Council
• Director Natural Resources
Division of Commonwealth
Bank of Australia
(Singapore)
• Financial Analyst BHP Billiton
Petroleum (Perth)
• Experience investing debt
and equity in the upstream
oil and gas sector and
identification of value
creation opportunities for
upstream oil and gas
development / production
assets
• Deep understanding as an
institutional investor of the
key drivers of shale gas
value generation
• Managing Partner for the
Northern Territory and leader
for Advisory Services for
Deloitte in the Northern
Territory
• 5th female ever to enter the
Deloitte Australian Partnership
• Currently on the Northern
Territory Investment Advisory
Group and on the Northern
Territory National Security
Advisory Panel.
• Non-Executive Director of
Airport Development Group
Pty Ltd (the long-term lease
holder of Darwin International
Airport, Alice Springs Airport
and Tennant Creek Airport)
• Founding principal of Pacific
Road Capital, a resources
investing manager of private
equity funds
• Former Chief Operating
Officer of AurionGold Limited
• 30 years technical &
leadership experience in
leading E&P companies
including BP, LASMO-Eni and
Oil Search
• Previously Chief of
Geoscience & Exploration
Excellence for Oil Search
• Chairman of the VALMIN
Code Committee for the
AusIMM and Australian
Institute of Geoscientists
20
Appendix 3: A Globally Significant Resource Position
Contingent Resources
(Liquids)
Shale Unit
Low Estimate Best Estimate
(1C)
(2C)
High
Estimate
(3C)
Contingent
Resources (Gas)
Low Estimate Best Estimate
(1C)
(2C)
High
Estimate
(3C)
Prospective Resources(Liquids)
Prospective
Resources (Gas)
Low Estimate Best Estimate
High
(1U)
(2U)
Estimate (3U)
Low Estimate Best Estimate
High
(1U)
(2U)
Estimate (3U)
mmbbls
mmbbls
mmbbls
PJ
PJ
PJ
mmbbls
mmbbls
mmbbls
PJ
PJ
PJ
0.9
3.5
14.1
365.2
1,906.1
3,946.1
164
764
3,509
12,380
44,540
145,523
Empire 2C Contingent Resource of 1,906 PJ (1,625 BCF gas) and 3.5 MMBBLs liquids
Empire P(50) Prospective Resource of 44,541 PJ (42 TCF gas) and 764 MMBBLs liquids
Note: Refer to EEG announcement dated 29 May 2023 for Netherland, Sewell & Associates, Inc. Contingent and Prospective Resources
Estimate of BCF to PJ undertaken by Empire of 1.06
21
Appendix 4: Beetaloo Horizontal Well Activity
#
Well Name
Year
Operator
Average
Depth of
Horizontal
(Below
Ground)
Horizontal
Length
Total
Measured
Depth (m)
Drilling Cost
(A$’M)
Fracture
Stimulation
Stages
Stimulated
Length
Fracture
Stimulation
and Extend
Production
Testing Cost
(A$’M)
Total Cost
(A$’M)
1
Amungee-1H
2015/16
Origin Energy
(now TBN)
~2,400m
1,100m
3,808m
11
~750m
2
Tanumbirini-2H
2021/22
Santos
~3,450m
1,000m
4,598m
11
660m
Est. $37 to $40
3
Tanumbirini-3H
2021/22
Santos
~3,475m
1,000m
4,857m
10
600m
Est. $37 to $40
Carpentaria-2H
2021/22
Empire
~1,620m
1,345m
3,150m
$11.1
21
927m
$13.0
$24.1
Carpentaria-3H
2022/23
Empire
~1,700m
2,632m
4,460m
$10.0
40
1,989m
$17.3
$27.3
4
Amungee-2H
2022/23
Tamboran
~2,400m
1,275m
3,883m
$14.1
25
1,020m
~$18
Est. $32 to $35
5
Shenandoah South-1H
2023
Tamboran
~3,000m
1,074m
4,300m
6
Amungee-3H
2023
Tamboran
2,272m
1,100m
3,837m
IP
(EPT 1)
IP(57)
1.11mmscf/d
IP(14)
2.0mmscf/d
IP(10)
1.7mmscf/d
IP(30)
2.4mmscf/d
IP(27)
2.6mmscf/d
IP(50)
0.97mmscf/d
IP30
(EPT 2)
CO2
N/A
3 to 4%
2.1mmscf/d
3 to 4%
3.1mmscf/d
3 to 4%
2.8mmscf/d
Sub 1%
3.3mmscf/d
Sub 1%
N/A
3 to 4%
500m
$12.6
Sources:
1. Falcon Oil & Gas (TSXV: FO, AIM: FOG) release entitled:
▪ “Amungee NW-1H – Normalised gas flow rate equivalent to 5 mmscf/d per 1,000m horizontal” dated 3 September 2021
2. Tamboran Resources (ASX: TBN) announcements entitled:
▪ “Operational update: Approximately 17 per cent upward revision to Tanumbirini-2H and 3H flow test results” dated 21 March 2022
▪ “Tanumbirini-2H and 3H 30-day normalised flow rates exceed estimated Beetaloo commerciality threshold” dated 5 September 2022
▪ Total Cost calculated as EP161: Tanumbirini 2H & 3H wells total funds used to date ($18.5m) per Tamboran’s Q1 2023 Quarterly Report multiplied by 4 (TBN holds a 25% interest in these wells)
3. Tamboran Resources announcements entitled:
▪ “Operational update: Approximately 17 per cent upward revision to Tanumbirini-2H and 3H flow test results” dated 21 March 2022
▪ “Tanumbirini-2H and 3H 30-day normalised flow rates exceed estimated Beetaloo commerciality threshold” dated 5 September 2022
▪ Total Cost calculated as EP161: Tanumbirini 2H & 3H wells total funds used to date ($18.5m) per Tamboran’s Q1 2023 Quarterly Report multiplied by 4 (TBN holds a 25% interest in these wells)
4. Releases entitled:
▪ Falcon Oil & Gas, “Amungee NW-2H Well Update” dated 22 June 2023
▪ Falcon Oil & Gas, “Operational Update on Amungee NW-2H Drilling” dated 23 December 2022
▪ Tamboran Resources, “EP98 Operational Update: Successful completion of 25-stage stimulation program at Amungee-2H” dated 22 March 2023
5. Falcon Oil & Gas release entitled “Successful Drilling of Shenandoah South 1H Horizontal Well” dated 18 September 2023
6. Tamboran Resources release entitled “EP98/117 Operational Update: A3H drilled in record time in less than 18 days” dated 16 October 2023
22
Disclaimer
This presentation has been prepared by Empire Energy Group Limited (“Empire” or the “Company”). The information in this presentation is information of a general nature and is subject to
change without notice. The information in this presentation does not purport to be complete, nor does it contain all of the information which would be required in a prospectus prepared in
accordance with the requirements of the Corporations Act 2001 (Cth). It contains information in a summary form only and should be read in conjunction with Empire’s other periodic
disclosure announcements to the ASX available at www.asx.com.au.
An investment in Empire shares is subject to known and unknown risks, many of which are beyond the ability of Empire to control or predict. These risks may include, for example, movements
in oil and gas prices, a failure to acquire some or all of the targeted acreage, risks associated with the development and operation of the acreage, exchange rate fluctuations, an inability to
obtain funding on acceptable terms or at all, loss of key personnel, an inability to obtain appropriate licences, permits and or/or other approvals, inaccuracies in resource estimates, share
market risks and changes in general economic conditions. Such risks may affect actual and future results of Empire and its shares.