Quarterly Activities Report - 30 June
Released
Released
Announcement PDF
Q2 2025 QUARTERLY REPORT
31st July 2025
• $35 million share placement and SPP completed with strong SPP participation
• Successful completion of hydraulic stimulation of Carpentaria-5H well
• IP30 flow rate results are expected by end September
• Traditional owner consent to the sale of appraisal gas from the Carpentaria Pilot
Project
• Change of name to Beetaloo Energy Australia Limited
• Total liquidity at end of the Quarter $55.0 million comprising $39.4 million in cash
and $15.6 million of undrawn funding available under the Macquarie facilities*
“This has been a breakthrough quarter for the company with our change of name to
Beetaloo Energy Australia Limited, completion of a $35 million share placement and SPP,
successful completion of the longest hydraulic stimulation of a gas well in Australia, and
Traditional Owner consent to sale of appraisal gas.
The results of the IP30 flow test following the hydraulic stimulation of Carpentaria-5H next
quarter will be an important step towards first gas production from the Carpentaria Pilot
Project
I want to thank the Beetaloo Energy team along with our partners and stakeholders for the
focus and determination that has gone into the achievements in the quarter, with the focus
now on completion of the Carpentaria Pilot Project including installation of the Carpentaria
Gas Plant, with production expected to commence in 2026”
Alex Underwood, Managing Director
* Excludes A$30 million Macquarie Midstream Infrastructure Tranche which Beetaloo Energy expects to become available
in coming months once Conditions Precedents are satisfied.
Beetaloo Energy Australia Limited
ABN 29 002 148 361
Level 5, 6-10 O’Connell St, Sydney, NSW 2000
T +61 2 9251 1846
info@beetalooenergy.com
NORTHERN TERRITORY OPERATIONS UPDATE
Carpentaria-5H Hydraulic Stimulation
Hydraulic stimulation was successfully completed by Halliburton on the Carpentaria-5H horizontal
well in Beetaloo Basin permit EP 187 following a 20-day campaign that commenced on 16th June
2025.
The hydraulic stimulation was completed over a 2,955 metre (9,695 foot) section within the B Shale
of the Velkerri Formation. Beetaloo Energy implemented several design improvements during the
hydraulic stimulation based on learnings from prior well operations and analogue North American
shale basins. An average pump rate over 100 bbl/min was achieved on multiple stages due to the
available hydraulic horsepower and increased casing size to 5 ½”. 67 stages were placed, and an
average fluid intensity of 52 bbl/ft was achieved with proppant (sand) intensity of 2,320 lb/ft using a
fully slickwater design.
Schematic of Carpentaria-2H, 3H and 5H horizontal well bores and stimulation stages
The operations were completed with no recordable or reportable HSE incidents or injuries.
Logistics and operational milestones in the basin’s largest hydraulic stimulation included deployment
of a successful automated conveyor-based sand delivery process, and the first 24-hour hydraulic
stimulation operations for Beetaloo Energy. The hydraulic stimulation team achieved 5 or more
pumped stages per day on multiple days during the campaign.
These hydraulic stimulation metrics exceed those previously achieved in the Carpentaria-2H (“C-2H”)
and Carpentaria-3H (“C-3H”) wells that were drilled and stimulated by Beetaloo Energy from the
same well pad.
Beetaloo Energy Australia Limited
www.beetalooenergy.com
2
Coiled tubing mill out operations were undertaken after completion of the hydraulic stimulation. A
2,760m section (~93%) of the horizontal well bore was cleaned out during this process. A short initial
flowback of injected water from the well was then conducted.
The C-5H well was shut in on 25th July and is currently undergoing soak. Following the soak,
extended production testing will be undertaken for a 30-day period (“IP30”). IP30 gas rates are
expected to be announced in late September.
This IP30 test is a precursor to the longer term planned pilot production following the
commissioning of the Carpentaria Gas Plant. C-5H will form part of the Carpentaria Pilot Project
along with C-2H and C-3H.
Aerial view of mobilisation during the Carpentaria-5H hydraulic stimulation operation
Beetaloo Energy Australia Limited
www.beetalooenergy.com
3
Hydraulic stimulation pump equipment being set up at the Carpentaria-5H well pad
Traditional Owner Consent to the Sale of Appraisal Gas
As detailed in BTL ASX announcement dated 26th June 2025 “Traditional Owners Consent to the Sale
of Appraisal Gas” the traditional Aboriginal owners of the Mambaliya Rrumburriya Wuyalia
Aboriginal Land Trust covering EP 187 (“Traditional Owners”) consented to the sale of appraisal gas
from the Carpentaria Pilot Project in accordance with section 57AAA (5)(d) of the Petroleum Act 1984
(NT).
The package of benefits has been finalised between Beetaloo Energy and a committee of the
Traditional Owners with the support of the Northern Land Council. The process of completing the
agreement is under way in accordance with the Aboriginal Land Rights (Northern Territory) Act 1976
(Cth).
Beetaloo Energy Australia Limited
www.beetalooenergy.com
4
This photo was taken and used with consent.
CARPENTARIA PILOT PROJECT UPDATE
Construction of the Carpentaria Pilot Project is expected to commence in Q4 2025 including
installation of well head connection and processing facilities for Carpentaria-2H, 3H and 5H
horizontal wells, installation of interconnecting flowlines between the wells and the Carpentaria Gas
Plant, installation and commissioning of the Carpentaria Gas Plant, and connection to the Macarthur
River Gas Pipeline.
OTHER CORPORATE NEWS
Geophysics Grant-LiDAR
Beetaloo Energy was successful in its application for funding in the Round 18 co-funded Geophysics
and Drilling Collaboration program, funded by Resourcing the Territory program administered by
the Northern Territory Geological Survey.
The co-funding will be used for a LiDAR survey over the EP187 Carpentaria Gas Project Area to
accelerate the progression to development. The LiDAR survey is scheduled to be acquired during Q3
2025.
Research and Development Facility
During the quarter, Beetlaoo Energy drew down $2.6 million under the new $30 million R&D Facility
with Macquarie Bank Limited, applying the proceeds to the Carpentaria Pilot Project.
Beetaloo Energy Australia Limited
www.beetalooenergy.com
5
Documentation of the Midstream Infrastructure Facility was completed in Q2 2025. The facility will
become available for drawdown following receipt of Beneficial Use of Gas approval from the NT
Government as described above, subject to FEED approval and certain other conditions.
2025 Annual General Meeting
Beetaloo Energy held its 2025 Annual General Meeting on 29th May 2025 in Sydney. All resolutions
were carried by shareholders.
A General Meeting will be held on Thursday, 7th August 2025 at 9:30am as detailed in the ASX
announcement by Beetaloo Energy on 8th July 2025.
Beetaloo Energy Tenements
Beetaloo Energy has included a schedule of its oil & gas leases in Appendix A as required under ASX
Listing Rule 5.4.3.
NT PETROLEUM SECTOR UPDATE
14 May 2025: Tamboran finalised the checkerboard of Beetaloo Basin blocks and announced a
US$15 million acreage sale to Daly Waters Energy, LP. Tamboran and Daly Waters Energy, LP (DWE)
signed a binding agreement to finalize the checkerboard of the joint acreage position across EPs 76,
98 and 117 1.
16 June 2025: Tamboran’s SS-2H ST1 delivered a record Beetaloo Basin average 30 day production
(IP30) flow rate of 7.2 million cubic feet per day (MMcf/d) over a 5,483 foot (1,671-metre), 35 stage
stimulated length within the Mid Velkerri B Shale 2
16 June 2025: XRG Consortium submitted a non-binding indicative proposal to acquire Santos
Limited at a 44% premium to the 3- month VWAP of A$6.19 3
18 June 2025: Barossa LNG FPSO arrived in the field and was successfully hooked up. Santos
announced the arrival of the BW Opal FPSO (floating production, storage and offloading) vessel at
the Barossa gas field approximately 285 km north of Darwin on Sunday 15th June 2025, marking a
critical milestone on the path to first gas in Q3 2025 4
BALANCE SHEET AND LIQUIDITY
Beetaloo Energy’s cash balance as of 30th June was $39.4 million of which $38.8 million was held in
Australian dollars and US$0.6 million was held in United States dollars.
Beetaloo Energy’s total available liquidity as of 30th June 2025 was $55.0 million, comprising total
cash of $39.4 million, $14.6 million undrawn under the R&D Facility and $0.9 million undrawn under
the Performance Bond Facility. Both facilities are held with Macquarie Bank.
Tamboran Resources ASX announcement: dated 14th May 2025
Tamboran Resources ASX announcement: dated 16th June 2025
3
Santos Limited ASX announcement dated 16th June 2025
4
Santos Limited ASX announcement: dated 18th June 2025
1
2
Beetaloo Energy Australia Limited
www.beetalooenergy.com
6
Beetaloo Energy expects to satisfy the conditions precedent to drawdown of the $30 million
Midstream Infrastructure Facility in the coming months. Those funds will be applied to the
construction and installation of the Carpentaria Gas Plant and associated infield infrastructure.
Payments to Related Parties of the Company and their Associates
Item 6.1: Appendix 5B description of payments to related parties of the Company:
Director Fees
$68,250
Managing Director and Related Parties 5 Remuneration
$199,796
Total (Item 6.1)
$268,046
Liquidity
Quarter Ended
30-Jun-25
31-Mar-25
31-Dec-24
30-Sep-24
Cash (A$)
$39,414,486
$14,396,319
$25,631,533
$39,835,277
Debt (A$) 6
$(19,448,156)
$(17,202,353)
$(6,659,860)
$(6,224,896)
Net Cash / (Debt) 7
$19,966,330
$(2,806,034)
$18,971,673
$33,610,381
Production and Development Expenditure (ASX Listing Rule 5.2.1)
Beetaloo Energy did not incur production and development expenditure on its assets during the
Quarter.
Exploration Expenditure (ASX Listing Rule 5.2.2)
Asset
Nature of Expenditure
Amount
Carpentaria Pilot Project
$7,390,521
Capitalised
EP187
Total Capitalised
$7,390,521
Expensed
EP187
Annual Licensing and Administrative fees
(NT Government and NLC)
Environmental, compliance and cultural monitoring
Consulting and advisory expenses
EP167, EP168, EP169,
EP198
Annual Licensing fees (NT Government)
(Western Beetaloo)
Compliance & Operations
Total Expensed
$432,757
$3,250
$1,658,406
$199,838
$5,544
$2,299,795
Beetaloo did not incur exploration expenditure on its other assets during the Quarter.
Managing Director remuneration includes his spouse, Melissa Underwood, who earns consulting fees under an arm’s
length contract approved by the Audit and Risk Committee of the Board.
6
Debt is comprised of $15,377,727 under Facility A (R&D Facility), and $4,070,429 owing under Facility B (Performance Bond Facility)
with Macquarie Bank Limited.
7
Net Cash / (Debt) is defined as cash minus debt for the purposes of this calculation
5
Beetaloo Energy Australia Limited
www.beetalooenergy.com
7
About Beetaloo Energy
Beetaloo Energy holds 28.9 million acres of highly prospective exploration tenements in the McArthur
Basin and Beetaloo Sub-basins, Northern Territory. Work undertaken by the Company since 2010
demonstrates that the Eastern depositional Trough of the McArthur Basin, of which the Company holds
around 80%, has enormous conventional and unconventional hydrocarbon potential. The Beetaloo Basin,
in which Beetaloo Energy holds a substantial position, has world-class hydrocarbon volumes in place and
a ramp up in industry activity to appraise substantial discoveries already made by major Australian oil and
gas operators is ongoing.
Registered Office
Beetaloo Energy Australia Limited
Level 5, 6-10 O’Connell Street
Sydney NSW 2000
Phone: +61 2 9251 1846
Facsimile: +61 4 9251 1022
ABN 29 002 148 361
Securities Exchange
ASX:BTL
Media and Investor Enquiries
Share Registry
Nick Kell
Phone +61 2 9251 1846
Computershare Investor Services
Phone: 1300 850 505
This ASX release has been authorised by the Board of Directors.
Beetaloo Energy Australia Limited
www.beetalooenergy.com
8