Quarterly Activities Report - 31 March
Released
Released
Announcement PDF
Beetaloo Energy Australia Limited T +61 2 9251 1846
ABN 29 002 148 361 info@beetalooenergy.com
Level 5, 6-10 O’Connell St, Sydney, NSW 2000
“We are very pleased with the positive outcomes the company has achieved during the quarter.
The strong participation in our recent placement and increased funding under our Macquarie facilities not
only underpin completion of the Carpentaria Gas Plant which is fully funded to production, but also
support key capital works programmes across our Beetaloo Basin Permits including a 2D seismic
programme in our western permits, ordering long lead drilling items and funding a local sand mining
operation to support shale gas activities across the basin.
Over the last 12 months horizontal appraisal drilling has accelerated in the basin. The level of activity
expected this year will represent a further increase in activity and the commencement of pilot production
from both our pilot project and Shenandoah South pilot project to the west. This is highly consistent with
the dramatic increase in activity across all the major shale producing basins globally.
Increased activity, assuming continued technical success, will bode well for our shareholders as more
capital and equipment flows into the basin. We look forward to continuing to play our role for the benefit
of all shareholders, the people of the Northern Territory, and Australia.
⎯ Alex Underwood, Managing Director
Q1 2026 QUARTERLY REPORT
30th April 2026
• Strong investor support for $66.3 million equity placement to existing and new institutional and
sophisticated investors (post quarter-end)
• Strengthened cash position with receipt of $15.4 million (including interest) under the Australian
Government’s R&D tax incentive for FY2024 activities (post quarter-end)
• Macquarie Bank Midstream Infrastructure Facility, which is currently undrawn, has been upsized
from $30 million to $45 million to fund Carpentaria Gas Plant construction
• Civil and piling works completed at the Carpentaria Gas Plant, with plant refurbishment for
transportation to site completed post quarter end
• Flow testing of Carpentaria-5H to recommence during Q2 2026
• Total liquidity at end of the Quarter was $14.3 million comprising $7.5 million in cash and $6.8
million of undrawn funding, prior to completion of $66.3 million placement
Beetaloo Energy Australia Limited www.beetalooenergy.com 2
Civils and piling complete at the Carpentaria site in early April
Refurbished units in Roma being loaded for transport to Carpentaria
NORTHERN TERRITORY OPERATIONS UPDATE
The quarter coincided with a particularly extreme Northern Territory wet season, which limited on-site
operational activities, with work focused on environmental management and compliance. After the
successful clean-up flow testing of Carpentaria-5H (“C-5H”) in Q4 2025, detailed analysis was undertaken to
assess well performance and optimise completion design for the next drilling and stimulation campaign,
currently in the planning phase.
Preparations are underway for the installation of additional water handling capacity on site to support
further flow testing of the C-5H well in Q2 2026 and gas plant production later in the year.
Planning was undertaken during the quarter for a 2D seismic campaign in the Western Beetaloo permits
(EP167 and EP168) with contracts expected to be awarded in Q2 2026.
Carpentaria Pilot Project Update
There was significant progress made during the quarter with gas plant refurbishment on site in Roma now
completed. Transportation of gas plant components from Roma to Carpentaria commenced in early April.
Refurbishment works to date have been completed with no recordable safety or environmental incidents.
Beetaloo Energy Australia Limited www.beetalooenergy.com 3
OTHER CORPORATE NEWS
Research and Development Macquarie Facility
During the quarter, no drawdowns were made under the $30 million R&D Facility with Macquarie Bank
Limited.
Midstream Macquarie Facility
Subsequent to quarter end, availability under the Midstream Infrastructure Facility was increased to $45
million, which is currently undrawn, to support construction, commissioning and production from the
Carpentaria Pilot Project which is now fully funded to first production.
Research and Development Tax Incentive
The ATO’s Research and Development Tax Incentive Scheme is designed to encourage companies to
undertake eligible research and development activities and support innovation in Australia. The scheme
provides eligible companies with a refundable tax offset on qualifying R&D expenditure.
Subsequent to quarter end, Beetaloo Energy received a cash refund of $15.4 million (including interest) in
respect of FY2024 R&D activities.
Proceeds from the refund will be applied to captial works projects and partial repayment of the Macquarie
Bank R&D Credit Facility.
Territory Sands Project
During the quarter, Beetlaoo entered into a binding term sheet to fund development of Territory Sands’
Forest Hill South frac sand project in the Beetaloo Sub-basin region.
Subsequent to quarter end, the Northern Territory Government issued a Notice of Intent to Grant extractive
mineral leases (EML 33034 and EML 33036) to Territory Sands Pty Ltd, marking a key regulatory milestone for
the proposed operations.
The project is expected to support the development of a locally sourced supply of high-quality quartz sand
for use as proppant in Beetaloo Basin hydraulic fracturing activities and will generate broader economic
benefits including local employment and engagement with regional communities, while contributing to the
efficient development of Beetaloo Energy’s projects.
Beetaloo Energy Tenements
Beetaloo Energy has included a schedule of its oil and gas leases in Appendix A as required under ASX
Listing Rule 5.4.3.
Beetaloo Energy Australia Limited www.beetalooenergy.com 4
Darwin’s St Mary’s football team in action during the NT Men’s Premier League Grand Final, March 2026.
COMMUNITY ENGAGEMENT
St Mary’s Football Club
We continue to proudly support Darwin based St Mary’s Football Club as part of our broader commitment to
community engagement and regional investment in the Northern Territory.
The club competed in the NT Men’s Premier League Grand Final at Darwin’s TIO Stadium in March 2026,
reflecting a strong and consistent performance throughout the season.
While the Premier League side did not secure the premiership, St Mary’s maintained a strong presence
across multiple divisions during Grand Final weekend, demonstrating the depth of talent and development
within the club.
Our sponsorship supports grassroots participation, player development, and community engagement,
strengthening local connections while also enhancing brand visibility and aligning with positive social
outcomes in a key operating region.
Beetaloo Energy Australia Limited www.beetalooenergy.com 5
Aerial view of gas plant equipment being delivered to the Carpentaria site after trucking from Roma, QLD
NT PETROLEUM SECTOR UPDATE
12th
January 2026: Tamboran Resources announced the appointment of Mr Todd Abott as Chief Executive
Officer1
.
22nd
January 2026: Santos announced a drilling rig was secured during Q4 2025 for the Beetaloo Basin
program consisting of a 2-3 well campaign planned for the third quarter of 20262
.
12th
February 2026: Central Petroleum announced it is targeting FID for four new wells at Mereenie and
Palm Valley fields – drilling to commence in mid-20263
12th
February 2026: Tamboran Resources announced the planned drilling of two wells (SS-7H and -8H) at
the FSDA South joint venture located within the Beetaloo Basin, operated by Daly Waters Energy, LP (“DWE”)
a wholly owned subsidiary of Formentera Partners, from 2Q 20264
.
25th
January 2026: Santos announced first cargo from the Barossa Field via the Darwin LNG facility5
.
25th
March 2026: INPEX announced that its Australian subsidiary entered into a farm-in agreement with
DWE to acquire 11.25% interest in the First Strategic Development Area (FSDA) North and FSDA South and a
20.00% interest in the Beetaloo Central Development (BCD) acreage in the Beetaloo Basin6
31st
March 2026: Tamboran Resources announced the execution of a Farm-in Agreement with DWE.
Tamboran Resources will farm down approximately 10,000 acres of its working interest across the FSDA
North, FSDA South and the BCD to DWE for staged earn-in up to ~US28.5 million7
.
1 Tamboran Resources announcement Appointment Mr. Todd Abbott as Chief Executive Officer dated 12th
January 2026
2 Santos Fourth Quarter Report (2025) dated 22nd
January 2026.
3 Central Petroleum investor update dated 12th February 2026
4 Tamboran Resources 2Q FY26 Result Presentation dated 12th
February 2026
5 Santos announces first Barossa LNG cargo dated 27th
January 2026
6 INPEX announces INPEX farms into prospective acreage in Beetaloo Sub-basin dated 25th March 2026
7 Tamboran Resources Tamboran farmout Pilot Area and BCDA acreage for significant premium in acreage value 31st
March 2026
Beetaloo Energy Australia Limited www.beetalooenergy.com 6
BALANCE SHEET AND LIQUIDITY
Beetaloo Energy’s cash balance at Quarter end was $7.5 million of which $7.2 million was held in Australian
dollars and US$0.2 million was held in United States dollars.
Beetaloo Energy’s total available liquidity at Quarter end was $14.3 million, comprising total cash of $7.5
million, $4.6 million undrawn under the R&D Facility and $2.2 million undrawn under the Performance Bond
Facility. Both facilities are held with Macquarie Bank.
During the Quarter, 2,920,239 options were exercised at 24c per share, generating $700,857 in cash.
Payments to Related Parties of the Company and their Associates
Item 6.1: Appendix 5B description of payments to related parties of the Company:
Liquidity
Quarter Ended 31-Mar-26 31-Dec-25 30-Sep-25 30-Jun-25
Cash (A$) $7,508,552 $17,956,969 $27,141,948 $39,414,486
Debt (A$)9
$(27,345,858) $(28,194,566) $(29,515,769) $(19,448,156)
Net Cash / (Debt)10
$(19,837,306) $(10,237,597) $(2,373,821) $19,966,330
Production and Development Expenditure (ASX Listing Rule 5.2.1)
Beetaloo Energy did not incur production and development expenditure on its assets during the Quarter.
Exploration Expenditure (ASX Listing Rule 5.2.2)
Asset Nature of Expenditure Amount
Capitalised
EP187 Carpentaria Pilot Project $7,799,775
Total Capitalised $7,799,775
Expensed
EP187
Annual Licensing and Administrative fees
$407,722
(NT Government and NLC)
Consulting and advisory expenses $740,430
EP167, EP168, EP169, EP198
(Western Beetaloo)
Annual Licensing Fees (NT Government) $234,175
Total Expensed $1,382,327
Beetaloo did not incur exploration expenditure on its other assets during the Quarter.
8
Managing Director and Related Parties remuneration includes his spouse, Melissa Underwood, who earns consulting fees under an arm’s
length contract.
9
Debt is comprised of $25,445,340 under Facility A (R&D Facility), and $2,749,226 owing under Facility B (Performance Bond Facility) with Macquarie Bank
Limited
10
Net Cash / (Debt) is defined as cash minus debt for the purposes of this calculation
Director Fees $22,985
Managing Director and Related Parties8
Remuneration $201,059
Total (Item 6.1) $224,044
Beetaloo Energy Australia Limited www.beetalooenergy.com 7
ABOUT BEETALOO ENERGY
Beetaloo Energy holds 28.9 million acres of highly prospective exploration tenements in the McArthur Basin
and Beetaloo Sub-basins, Northern Territory. Work undertaken by the Company since 2010 demonstrates
that the Eastern depositional Trough of the McArthur Basin, of which the Company holds around 80%, has
enormous conventional and unconventional hydrocarbon potential. The Beetaloo Basin, in which Beetaloo
Energy holds a substantial position, has world-class hydrocarbon volumes in place and a ramp up in industry
activity to appraise substantial discoveries already made by major Australian oil and gas operators is
ongoing.
This ASX release has been authorised by the Board of Directors.
Registered Office Beetaloo Energy Australia Limited
Level 5, 6-10 O’Connell Street ABN 29 002 148 361
Sydney NSW 2000
Phone: +61 2 9251 1846 Securities Exchange
ASX: BTL
Media and Investor Enquiries Share Registry
Nick Kell Computershare Investor Services
Phone +61 2 9251 1846 Phone: 1300 850 505
Beetaloo Energy Australia Limited www.beetalooenergy.com 8
APPENDIX A: INTEREST IN PETROLEUM PERMITS AND MINERAL TENEMENTS
Lease Holder Status Percentage of Interest Held
31 March 2026
EP180 Imperial Oil & Gas Application 100%
EP181 Imperial Oil & Gas Application 100%
EP182 Imperial Oil & Gas Application 100%
EP183 Imperial Oil & Gas Application 100%
EP184 Imperial Oi & Gas Granted 100%
EP187 Imperial Oil & Gas Granted 100%
EP188 Imperial Oil & Gas Application 100%
EP319 Imperial Oil & Gas Application 100%
EP320 Imperial Oil & Gas Application 100%
EP321 Imperial Oil & Gas Application 100%
EP322 Imperial Oil & Gas Application 100%
EP323 Imperial Oil & Gas Application 100%
EP324 Imperial Oil & Gas Application 100%
EP325 Imperial Oil & Gas Application 100%
EP326 Imperial Oil & Gas Application 100%
EP327 Imperial Oil & Gas Application 100%
EP328 Imperial Oil & Gas Application 100%
EP329 Imperial Oil & Gas Application 100%
EP330 Imperial Oil & Gas Application 100%
EP331 Imperial Oil & Gas Application 100%
EP332 Imperial Oil & Gas Application 100%
EP333 Imperial Oil & Gas Application 100%
EP334 Imperial Oil & Gas Application 100%
EP335 Imperial Oil & Gas Application 100%
EP336 Imperial Oil & Gas Application 100%
EP337 Imperial Oil & Gas Application 100%
EP338 Imperial Oil & Gas Application 100%
EP339 Imperial Oil & Gas Application 100%
EP340 Imperial Oil & Gas Application 100%
EP341 Imperial Oil & Gas Application 100%
EP342 Imperial Oil & Gas Application 100%
EP167 Imperial Oil and Gas A Granted 100%
EP168 Imperial Oil and Gas A Granted 100%
EP169 Imperial Oil and Gas A Granted 100%
EP198 Imperial Oil and Gas A Granted 100%