Ord Minnett Conference Presentation
Released
Released
Announcement PDF
ASX:EEG
Empire Energy – The Beetaloo Basin Pioneer moving into Production
Ord Minnett Conference Presentation – 20th March 2025
Corporate Snapshot
ASX Share Price
Capital Structure
Shares on issue1
1,017.3M
Share price
A$0.19
Market cap
A$193.3M
Net (debt2) / cash3
~A$21.2M
Enterprise value
~A$172.1M
Cash at bank3
~A$25.6M
Contingent and Prospective Resources
Top Shareholders
Pangaea Resources
13.8%
2C Contingent Resources
1.65 TCFe
1,927 PJe
Sheffield Holdings (USA)
9.0%
2U Prospective Resources
46.6 TCFe
49,125 PJe
Elphinstone Group
8.0%
Liberty Oilfield Services (USA)
4.7%
1. Empire has 26.5m Share Rights on issue to members of the management team and Board, 14.3m of which have performance hurdles tied to total shareholder return or service period thresholds.
2. Total available debt of A$65.0 million (drawn to A$4.4 million), comprising: (i) A$30.0 million revolving credit facility; (ii) A$5 million performance bonding facility (drawn to A$4.4 million), representing a contingent liability; and (iii) $30m
Midstream Infrastructure Facility (undrawn). All the facilities are provided by Macquarie Bank
3. As at 30 December 2024
1
Empire Energy Investment Case
The Beetaloo Basin Focused Gas Development Company
• The Beetaloo’s Velkerri Shale is an enormous (>500 TCF) low CO2 shale gas resource located in Northern Australia close to Asian
LNG markets and existing export infrastructure
• The Beetaloo is a stacked shale play with world class geological characteristics analogous to the prolific US Marcellus Shale
• Empire holds ~3 million net effective Beetaloo acres in two contiguous landholdings
• Empire owns and operates all of its acreage with 100% working interest and ~85% net revenue interest
2
Empire Energy Investment Case (Cont’d)
The Beetaloo Basin Focused Gas Development Company
• Empire’s acreage contains >47 TCFe 2U resource and >1.6 TCF 2C resource independently assessed by NSAI with <1% CO2
• Recent appraisal drilling by Empire and other operators has demonstrated commercial viability
• Binding gas sales agreement with investment grade customer
• Australian gas prices are over two times US, demonstrating an urgent need for increased supply
• Empire is targeting first gas sales from its Carpentaria Pilot Project in 2025 with scope to grow to LNG scale in years ahead
3
Empire’s Achievements to Date and Near-term Plan
EXPLORATION & APPRAISAL
2021
2022
2023
Gas Sales & Transportation: APA Group and Power and Water Corporation MoUs Executed
Carpentaria-1V: demonstrated the existence of Velkerri shales in the Carpentaria Area and flowed gas to surface
Carpentaria-2H flow rates: IP30 of 3.2 TJ (2.8 mmscf) per day
Carpentaria-3H flow rates: IP30 of 3.8 TJ (3.3 mmscf) per day
Carpentaria-4V: intersected the same stacked Velkerri Formation shales as the Carpentaria Project wells thereby opening the
Carpenaria East Area (total 110,000-acre development area delineated (~800 well locations))
Major 2C Contingent Resource upgrade announced for EP187 to 1,739 PJ (1.5 TCF high calorific, low CO2 gas)
Activities to date have been supported by $48 million in Australian Government funding across R&D incentive rebates and
drilling grants
KEY ACTIVITIES TO CARPENTARIA PILOT PROJECT FID
2024
Completed Front End Engineering & Design (“FEED”): including engineering, economic modelling etc.
Acquired 42TJ/d capacity gas plant from AGL Limited
Executed gas sales agreement with the Northern Territory Government for up to 25TJ/d for 10 years at attractive market pricing
Drilled and cased Carpentaria-5H (3,310 metre / 10,860 feet lateral)
Carpentaria Pilot Project is FID ready subject to Traditional Owner agreement. Environmental approvals received
PLANNED ACTIVITIES
2025
1.
2.
3.
Fracture stimulate Carpentaria-5H (60+ stages targeted)
Install the Carpentaria Pilot Project Gas Plant (“CGP”)
Commence gas sales
2025+ Drill additional pilot development wells and appraise Western Beetaloo discoveries (~20 TCF 2U resource)
4
Empire’s Beetaloo Basin Position
5 TCF gas pilot ready Carpentaria Project with >20 TCF Western Beetaloo resource delineated
• Empire is the largest net acreage holder in the Beetaloo
• All acreage is 100% owned and operated by Empire
• Acreage benefits from high Net Revenue Interest of ~85%1 vs typical US
NRI ~75%
• Acreage is proximal to existing pipeline and road infrastructure to
facilitate rapid commercialisation
• NT Government is investing in infrastructure corridors to facilitate rapid
industry growth
• The Carpentaria Project (EP187) is the immediate focus (5 TCF pilot
ready) targeting first production in 2025 with >20 TCF Western Beetaloo
Velkerri Shale resource providing material drilling inventory
1. Net revenue interest (NRI) equals Working Interest (100%) minus 10% Northern Territory Government royalty (partially offset
by statutory deductions) minus Traditional Owner royalty and private royalties
5
Positioned Across the Thickest Section of the Stacked Play
Combined Thickness of A, Intra A/B, B and C Velkerri Shales
• Empire’s Beetaloo Projects area located across the
thickest section of stacked Velkerri Shale reservoirs
in the basin
• Carpentaria Project has >300 m gross thickness of A,
Intra A/B, B and C Shale reservoirs
• Western Beetaloo Project has the thickest stacked B
and C Shale in the Beetaloo
• Empire’s “stacked shale play” results in a 4x
increase in the net effective acres compare to the B
Shale alone
6
Empire’s Stacked Play Improves Development Economics
Empire’s four stacked shale
reservoirs are 5x thicker
than the prolific Marcellus
Single Reservoir
Depth
(ft)
5800)
0
Gas
Saturation
100%
328 ft
Gamma Ray
(6400)
Depth
M (ft)
0
Stacked Shale Play Development Concept
Gas
Saturation
100%
C Shale
(5250)
(5500)
(6000)
(6200)
Gamma Ray
(5000)
100 m
SW Marcellus
Section
Four Stacked Reservoirs
Carpentaria-4
Type Section
Marcellus
(5750)
Total Marcellus
Thickness ~60 m
(6000)
(6250)
B Shale
• Four stacked reservoirs allows for fewer
well pads with more wells
Intra A/B • Option for more than 30 wells per pad
(Hybrid Play)
A Shale
Total Net Thickness >300 m
• Leads to improved development
efficiencies and economics
• Akin to Permian Basin style development
7
Empire has High-Quality, Low CO2 Gas
Empire’s Carpentaria gas composition meets Japanese customer specifications
• Gas for the Ichthys LNG is supplied from the Brewster Member and the
Carpentaria-2H Gas Composition - Mole %
Plover Formations which comprise the Ichthys Gas Field
• Production to date has mainly been from the Brewster Member,
however production is expected to move towards Plover and
peak in the 2030s as Brewster is depleted1
• Gas composition of Brewster and Plover
• Brewster: ~8% (CO2), ~11% (ethane)
• Plover: ~17% (CO2), ~4% (ethane)2
• Empire’s low CO2 (>1%) and high ethane (~12%) is perfectly
positioned to be blended with emerging Ichthys Gas supply to:
• Reduce average CO2 content (lessen need for CO2 stripping and
carbon, capture and storage)
Component
Q3 2022 Testing
Q1-Q2 2023 Testing
C1
Methane
83.17
82.80
C2
Ethane
11.95
12.40
C3
Propane
1.47
1.50
C4
Butane
0.30
0.30
C5+
Pentane and Higher
0.06
0.06
He
Helium
0.16
0.12
CO2
Carbon Dioxide
0.88
0.91
2.01
1.91
100.00
100.00
Other Inerts e.g., Nitrogen
Total Gas Composition
Hydrocarbons
Inerts
Sources:
1. https://www.upstreamonline.com/field-development/inpex-steps-to-the-starting-line-for-next-ichthys-phase/2-1-972375
2. https://www.inpex.com.au/media/yrobfsay/draft-environmental-impact-statement-06-chapter-4-project-description.pdf
3. https://territorygas.nt.gov.au/Knowledge-Centre/latest-news/2022/inpex-commits-to-lng-expansion
• Increase ethane content (attractive to Japanese energy market
given high heating value required and lessen the requirement for
ethane spiking of gas into plant or upon arrival in Japan)
• Support Ichthys LNG planned expansion to three trains by 20303
8
Appraisal Activity has Delivered the Carpentaria Project
Cost-Effective Approach to Appraisal
• Seismic, multi-stage vertical and horizontal flow tests have delineated a
large stacked play
• Four zones with a net effective area of >460,000 acres (~1,900 km2)
• ~A$90m (~US$60m) invested delivered >1,739 PJ (~1.5 TCF)
Commercial rates achieved
•
•
Two horizontal wells stimulated
•
High calorific value gas (1.15 TJ per MMCF)
Excellent flow rates – normalised rate of 3.5 TJ/d per 1,000 m
Gas resource and productivity now established to move into pilot production
•
•
More than 200 drilling locations delineated in the B Shale
~600 additional locations across A, Intra A/B and C Shales
9
The Carpentaria Pilot Project
Empire is targeting first production from Carpentaria in 2025
The Carpentaria Pilot Project aims to:
• Produce sales gas from existing Carpentaria-2H and Carpentaria-3H test wells,
Carpentaria-5H and future pilot development wells
• Process gas through Empire’s Carpentaria Gas Plant which has a design
capacity of 42 TJ/d (40 mmcf/d)
• Utilise existing McArthur River Gas Pipeline capacity to produce up to 25 TJ /d
(23 mmcf/d) in the pilot phase
- “T-piece” connection has been inserted into the pipeline to facilitate
Empire’s access to the line for gas sales
• Deliver both cash flow and additional resource definition for large-scale
development
Carpentaria 2H and 3H well pad from above
Carpentaria-2H flare
Carpentaria Gas Plant in operation immediately prior to acquisition
10
Carpentaria-5H
C-5H is the longest horizontal shale well, and will be the largest frack job executed in Australia
• C-5H was drilled from the same well pad as Carpentaria-2H (“C-2H”) and
Carpentaria-3H (“C-3H”) in 5 ½” casing
• C-5H:
- is the longest horizontal well drilled in the Beetaloo to date (3,310
metres of horizontal section); and
- will target 60 fracture stimulation stages
• C-5H will utilise the best practise completion to optimise productivity.
Empire has engaged specialist US shale experts to refine design and
ensure learnings from previous wells are captured in C-5H
• The goals of C-5H are:
- Execute a development scale well for the Carpentaria Pilot Project;
- Optimise fracture stimulation design to achieve higher productivity;
- Conduct a long-term production test to develop a Carpentaria type
curve for long laterals for development planning, and
- Commence gas sales from the Beetaloo Basin
• Halliburton contracted to fracture stimulate C-5H after the northern wet
season
11
Basin-wide appraisal is demonstrating the commercial case
* Due to casing deformation the majority of flows measured, between 85-95%, came from the first 200m section of the well
12
A Platform for Increased Productivity
Basin-specific drilling and completion methodologies are being developed to drive
increasing flow rates and EUR consistent with the lived experience of the US Shale Revolution
Drilled Appraisal Wells
Demonstrated Execution
> 2.6 km horizontal well drilled
successfully with 4 ½” casing
Drilling
Trialled multiple techniques
Stimulation
61 stimulation stages successfully
executed without screenout
Multiple stimulation fluids trialled
Lift, Choke & Soak
Flowback
No artificial lift required during
flowback
Trialled choke management and
soaking
Future Pilot / Development Wells
• Drilling 3km horizontal wells
• Increase casing size to 5 ½”
• Completion focus for landing zone, geosteering
and cementing
• Higher horsepower and doubling pump rates to
>100 barrels per minute
• One optimised strategy
• Post stimulation well cleanup timing and
technique (“soak”)
• Managed choke scheme for long term
productivity
EUR
Well
Cost
13
10 Year Binding Gas Sales Agreement with NT Government
Foundation gas sales agreement with investment grade customer underwrites pilot economics
• Buyer: Northern Territory Government (Aa3, stable)
• Volume / Term:
• up to 25 TJ/d for 10 years (~75PJ total, net to Empire)
• an additional 10 TJ/d+ for up to 10 years at the option of the Buyer to
be made available by Empire if production levels from the
Carpentaria project exceed 100 TJ/d
• Pricing: ex-field take-or-pay basis at competitive market gas prices,
escalating at 100% of the Australian CPI
• Delivery: McArthur River Gas pipeline (“MRP”)
• A T-piece connection has already been installed into the MRP at the
proposed location of the Carpentaria Gas Plant
• Conditions Precedent: customary conditions for an agreement of this
nature including Empire reaching FID for the Carpentaria Pilot Project
and receipt of regulatory approvals which are well advanced
Carpentaria Gas Plant
14
$65M Beetaloo Financing Package
Empire has executed binding debt commitment letters for Carpentaria Pilot Project
• This financing package represents a continuation of a 15-year relationship between Empire and Macquarie Bank
• Execution of the financing package follows the completion of an extensive competitive tender process of global oil & gas
financers
• The financing will be provided across three tranches:
• A$30 million R&D Facility will fund exploration, appraisal and development activities including Carpentaria-5H and
construction of infield infrastructure representing an upsizing and maturity extension of existing A$2.25 million facility
• A$5 million Performance Bond Facility to meet Empire’s Northern Territory environmental bonding obligations
• New A$30 million Midstream Infrastructure Facility to finance refurbishment and construction of the Carpentaria Gas Plant
and associated infrastructure. Repayment of this tranche will be via a tolling fee
• This financing along with existing cash resources, will fund the drilling, completion and flow testing of C-5H and the installation
of the Carpentaria Gas Plant and associated infield infrastructure
15
Connections to Market for Large Gas Volumes
• APA Group (ASX: APA) and Empire have executed an agreement
for the establishment of midstream gas infrastructure furthering the
memorandum of understanding announced by Empire on 27
October 2021
• APA will spend up to A$5 million under a proposed early works
agreement on Engineering and Design Concepts for midstream gas
facilities associated with Empire’s Carpentaria Pilot Project, which
would materially reduce the capital requirements for Empire to
commence commercial production
• APA and Empire are also working on open-access pipeline
concepts to transport large volumes of gas from the Beetaloo to
Australian east coast markets (in excess of 500 TJ/d / 476 mmcf/d).
The leading concept considers the potential construction of a new
pipeline connecting the Beetaloo to APA’s existing Carpentaria
Gas Pipeline between Mount Isa and Ballera (Queensland)
16
Pathway to Full-Field Development of the Carpentaria Project
Year
2024
2025
• Drill Carpentaria-5H
(3,000m lateral, ~60
stages)
• Pilot project
KEY ACTIVITIES
environmental approvals
received
• Fracture stimulate and
connect Carpentaria-5H
(3,000m lateral, ~60
stages) and existing well
inventory (C-2H and C3H)
• Construct Carpentaria
Pilot Project midstream
facilities and gas
gathering network
• First gas deliveries from
the Carpentaria Pilot
Project
Carpentaria Pilot Project
2026
• Planning and
engineering work for fullfield development
• Drill, fracture stimulate
and connect a further
~3 wells (3,000m lateral,
~60 stages) to grow
production to ~25TJ/d
• APA to commence work
2028+
• ‘Factory’ drilling
• Grow production up ~1
BCF/d to supply east
coast and LNG markets
• All three target gas
markets (NT, east coast
and LNG) are structurally
short of gas
on pipeline and gas
processing infrastructure
for full-field
development
Carpentaria Gas
Project
17
Empire is a Responsible Operator with ESG at the Core of its Strategy
Empire’s Beetaloo gas contains sub 1% CO2 in the reservoir
Environment
• Carpentaria CO2 reservoir levels are extremely low compared
to other new supply options
• Empire will offset all Scope 1 emissions with minimal impact on
revenues
- ~2% of gross revenue (at A$10/GJ gas price) for
Carpentaria’s full field economic life at the current
Australian Carbon Credit Unit (“ACCU”) price of ~A$35 per
tonne of CO2e1
• Stacked shale play minimises surface footprint
Social and Governance
• Empire maintains strong relationships with Traditional Owners
(TOs) and pastoralists on whose land it operates with full
consent
- ~30 on-county meetings held with TOs to date
- Northern Land Council exploration payments paid for the
benefit of TOs and thousands of hours of employment for
TOs to date
- Land access agreements signed with pastoralists
1. Estimates have been prepared by Empire and independently reviewed by HRL Technology Group Pty Limited (https://www.hrlt.com.au)
18
Government Supporting the Beetaloo
NT Government has primary responsibility for regulation of the Beetaloo Basin
Federal Labor Government is supportive of Beetaloo development
The Hon Lia Finocchiaro (Chief Minister of the Northern Territory)
“The CLP have always stood up for, and supported the Territory’s gas industry, and this industry
will proceed with certainty under a CLP government.
We have this incredible resource right here and thousands of Territory jobs could be created
over the next 20 years.
Gas is the cleaner and cheaper pathway to renewables. The Territory’s gas can provide the
solution to the East Coast power shortage and provide economic benefit to Territorians.”1
The Hon Gerard Maley (Deputy Chief Minister of the Northern Territory)
“Our Government is fully and unequivocally committed to the development of the Beetaloo
Sub-basin, the untapped potential of which represents decades of prosperity and energy
security for Territorians and an answer to the nation’s worsening energy crisis.”2
The Hon Madeleine King MP (Minister for Resources and Minister for Northern Australia)
The Hon Gerard Maley – Deputy Chief Minister NT, The Hon Lia Finocchiaro – Chief
Minister NT and Managing Director Alex Underwood, September 2024
“The (Future Gas) Strategy makes it clear that gas will remain an important source of energy
through to 2050 and beyond, and its uses will change as we improve industrial energy
efficiency, firm renewables, and reduce emissions”
“But it is clear we will need continued exploration, investment and development in the sector to
support the path to net zero for Australia and for our export partners, and to avoid a shortfall in
gas supplies.”3
1. The CLP's Plan to Rebuild the Territory
2. (26) Activity | Gerard Maley MLA | LinkedIn
3. https://www.minister.industry.gov.au/ministers/king/media-releases/australias-future-gas-strategy
19
Australia, Asia and the World Need New Gas Supply
Empire’s strategy is to supply domestic and international gas markets
Phase 1: Northern Australian Gas
Market
Phase 2/3: Australian East Coast
Gas Market
Phase 2/3: Global LNG Market
• Blacktip Gas Field: GSA to 2034
• Australian east coast domestic
• Empire is strategically located
of 104TJ/d vs. 11TJ/d production
• NT needing to buy emergency
gas from Darwin LNG terminals
• Northern Gas Pipeline (to QLD):
currently closed1
market is structurally short of gas
with a supply vs. demand deficit
emerging in 2027
• Existing supply sources such as
the Gippsland Basin are in
decline. QLD CSG largely
developed and contracted for
LNG to Asia
1. https://www.aemo.com.au/energy-systems/gas/gas-bulletin-board-gbb/data-gbb/data-dashboard
2. Shell LNG Outlook 2024
between Darwin and Gladstone
LNG export infrastructure
• LNG demand to reach around
625-685 million tonnes a year in
2040 (2023: 404mt) and outstrip
supply by 20272
20
The Beetaloo is Strategically Located Near Asian Markets
Australian domestic gas and Asian LNG indices trade at multiples of US Henry Hub prices
LNG Tanker Sailing Days to Tokyo Bay1
• Exposure to Pacific Basin gas prices
• ~US$10 / MMBtu premium to Henry Hub
• Japan/Korea Marker (Platts) LNG price
• US$13.64 / MMBtu (as at 17 March 2025)
• US$12.66 / MMBtu (avg. previous 12 months)
• US$19.03 / MMBtu (avg. previous 3 years)
• US Henry Hub price
• US$4.01 / MMBtu (at 18 March 2025)
Source:
1. BloombergNEF, Tamboran Resources
• Wallumbilla (Main East Coast Australian Index)
• A$14.55 / MMBtu (at 17 March 2025)
• US$9.16 / MMBtu (at 17 March 2025)
• A$20.59 / MMBtu Wallumbilla LNG Netback
21
The Empire Value Proposition
Phase 1
Carpentaria Pilot Project
Phase 2
Domestic Gas Project
Phase 3
Full-Field Development - LNG
• Up to 25 TJ/d (24 mmcf/d)
• Targeting first revenue in 2025
• Mature resource definition and
type curves for larger scale
development
• Gas plant secured
• ~200TJ/d (~190 mmcf/d) to
• ~1 BCF per day to supply LNG
• Carpentaria ‘stacked play’
• ~2.6 million net effective acres of
supply Australian east coast
provides additional drilling
inventory across ~460,000 net
effective acres
export markets
‘running room’ across Western
Beetaloo
• Binding gas sales agreement
with investment grade customer
• Macquarie Bank funding
package secured
22
Near-term Growth Catalysts
FY2024 Achievements
Key Near-term Catalysts
1. Divested US assets and repaid outstanding debt
1. Complete C-5H stimulation and well testing
2. Raised ~$46 million in equity and sale of royalty
2. Obtain Indigenous Approvals
3. Executed Gas Sales Agreement with NT Government
3. Construct surface facilities
4. Obtained Environmental Approvals for Carpentaria and
Western Beetaloo
4. Commence pilot project gas sales
5. Drilled C-5H (longest horizontal in the Beetaloo to date)
6. Arranged committed debt financing for Carpentaria Pilot
Project
23
ASX:EEG
https://empireenergygroup.net/
Alex Underwood
Managing Director
info@empiregp.net
+612 9251 1846
24
Appendix 1: A Globally Significant Resource Position
Contingent
Resources (Gas)
Low Estimate Best Estimate
(1C)
(2C)
Contingent Resources
(Liquids)
High
Estimate
(3C)
Low Estimate Best Estimate
(1C)
(2C)
High
Estimate
(3C)
Prospective
Resources (Gas)
Prospective Resources(Liquids)
Low Estimate Best Estimate
High
(1U)
(2U)
Estimate (3U)
Low Estimate Best Estimate
High
(1U)
(2U)
Estimate (3U)
PJ
PJ
PJ
mmbbls
mmbbls
mmbbls
PJ
PJ
PJ
mmbbls
mmbbls
mmbbls
365.2
1,906.1
3,946.1
0.9
3.5
14.1
12,380
44,540
145,523
164
764
3,509
Empire 2C Contingent Resource of 1,906 PJ (1,625 BCF gas) and 3.5 MMBBLs liquids
Empire P(50) Prospective Resource of 44,541 PJ (42 TCF gas) and 764 MMBBLs liquids
Note: Refer to EEG announcement dated 29 May 2023 for Netherland, Sewell & Associates, Inc. Contingent and Prospective Resources
Estimate of BCF to PJ undertaken by Empire of 1.06
25
Appendix 2: Empire’s Board of Directors
Peter Cleary
Alex Underwood
Karen Green
Louis Rozman
Prof. John Warburton
Chairman
Managing Director
Non-Executive Director
Non-Executive Director
Non-Executive Director
• Distinguished 29-year career
representing Santos, the
North West Shelf Venturers
and BP in Asia. His executive
career was in LNG, pipeline
gas and chemicals
operations
• Associate Director Energy
Markets Division of
Macquarie Bank Limited
(Sydney and Singapore) for
10 years
• Over 30 years’ experience in
Chartered Accountancy,
predominantly in business
advisory services and has
lived and worked in Darwin
since 1991
• Former Managing Director of
CH4 Gas which merged with
Arrow Energy and later
acquired by PetroChina and
Shell
• Highly regarded petroleum
geoscientist experienced in
big fields
• Member of the Executive
Committee of the Australia
Japan Business Co-operation
Committee and the Australia
Korea Business Council
• Director Natural Resources
Division of Commonwealth
Bank of Australia
(Singapore)
• Financial Analyst BHP Billiton
Petroleum (Perth)
• Experience investing debt
and equity in the upstream
oil and gas sector and
identification of value
creation opportunities for
upstream oil and gas
development / production
assets
• Deep understanding as an
institutional investor of the
key drivers of shale gas
value generation
• Managing Partner for the
Northern Territory and leader
for Advisory Services for
Deloitte in the Northern
Territory
• 5th female ever to enter the
Deloitte Australian Partnership
• Currently on the Northern
Territory Investment Advisory
Group and on the Northern
Territory National Security
Advisory Panel.
• Non-Executive Director of
Airport Development Group
Pty Ltd (the long-term lease
holder of Darwin International
Airport, Alice Springs Airport
and Tennant Creek Airport)
• Founding principal of Pacific
Road Capital, a resources
investing manager of private
equity funds
• Former Chief Operating
Officer of AurionGold Limited
• 30 years technical &
leadership experience in
leading E&P companies
including BP, LASMO-Eni and
Oil Search
• Previously Chief of
Geoscience & Exploration
Excellence for Oil Search
• Chairman of the VALMIN
Code Committee for the
AusIMM and Australian
Institute of Geoscientists
26
Appendix 3: Large Western Beetaloo Resource
Comprehensive well and seismic datasets in the Western Beetaloo Project have defined a
large extensive resource strategically located on existing infrastructure
Resource has been delineated
•
•
•
•
Delineated ~2.6 million net effective acres
100+ TCF OGIP Discovery (B Shale only)
Less than 1% CO2
Thickest B and C Shale in Beetaloo
• Same rock as Carpentaria Project – Stacked Play
• Huge running room
Forward program
•
•
EP 167 and EP 168 100% EEG
Up to 380 km in-fill 2D seismic oriented for future Hz wells
Multiple locations cleared for drilling and flow testing
27
Appendix 4: Conversion Table
Exchange Rate
US$ : A$
0.62
Energy
MCF : GJ
1.06
MMCF : TJ
1.06
BCF : PJ
1.06
GJ : TJ
1,000
GJ : PJ
1,000,000
Distance
Feet : Metres
3.28
28
Appendix 5: Empire’s Beetaloo Footprint Comparable to Marcellus
• Empire’s Beetaloo footprint is comparable in size to significant
portions of the core areas of the Marcellus Shale play in the
Appalachian Basin
• More than 9,000 wells are producing from similar depths to
Empire’s Beetaloo play (~34 percent of all Marcellus wells)1
across both core areas
• The majority of the more than 27,000 producing Marcellus
Shale wells are less than 2,250 metres below ground level
• Marcellus shale producing acreage has typically transacted
at US$5,000 to US$25,000 per acre2. Empire is valued at
~US$100 per acre based on the Carpentaria Project and
Western Beetaloo Project alone.
BCF/d
“Marcellus shale
gas production has
grown by 25 BCF/d
over ten years”
MARCELLUS SHALE GAS PRODUCTION
January 2008 – August 2024
BCF/d
Source: U.S. Energy Information Administration - EIA - Independent Statistics and Analysis
1. EIA and relevant State databases
2. https://mercercapital.com/energyvaluationinsights/ma-in-marcellus-utica-basins-2
29
Disclaimer
This presentation has been prepared by Empire Energy Group Limited (“Empire” or the “Company”). The information in this presentation is information of a general nature and is subject to
change without notice. The information in this presentation does not purport to be complete, nor does it contain all of the information which would be required in a prospectus prepared in
accordance with the requirements of the Corporations Act 2001 (Cth). It contains information in a summary form only and should be read in conjunction with Empire’s other periodic
disclosure announcements to the ASX available at www.asx.com.au.
An investment in Empire shares is subject to known and unknown risks, many of which are beyond the ability of Empire to control or predict. These risks may include, for example, movements
in oil and gas prices, a failure to acquire some or all of the targeted acreage, risks associated with the development and operation of the acreage, exchange rate fluctuations, an inability to
obtain funding on acceptable terms or at all, loss of key personnel, an inability to obtain appropriate licences, permits and or/or other approvals, inaccuracies in resource estimates, share
market risks and changes in general economic conditions. Such risks may affect actual and future results of Empire and its shares.
This presentation contains statements, opinions, projections, forecasts, and other material (“forward looking statements”). These statements can be identified by the use of words like
‘anticipate’, ‘believe’, ‘intend’, ‘estimate’, ‘expect’, ‘may’, ‘plan’, ‘project’, ‘forecast’, ‘will’, ‘should’, ‘could’, ‘seek’ and other similar expressions. Forward looking statements may be based on
assumptions which may or may not prove to be correct. None of Empire, its respective officers, employees, agents, advisers or any other person named in this presentation makes any
representation as to the accuracy or likelihood of fulfilment of the forward looking statements or any of the assumptions upon which they are based and disclaim any obligation or undertaking
to revise any forward looking statement, whether as a result of new information, future event or otherwise.
Maps and diagrams contained in this presentation are provided to assist with the identification and description of Empire’s lease holdings and Empire’s intended targets and potential
exploration areas within those leases. The maps and diagrams may not be drawn to scale and Empire’s intended targets and exploration areas may change in the future.
All financial information is in Australian dollars unless stated otherwise.
The information contained in this presentation does not take into account the investment objectives, financial situation or particular needs of any recipient and is not financial product advice.
Before making an investment decision, recipients of this presentation should consider their own needs and situation and, if necessary, seek independent professional advice.
To the maximum extent permitted by law, Empire and its respective officers, employees, agents and advisers give no warranty, representation or guarant
Share your feedback
Discover