Managing Director's Presentation to the AGM
Released
Released
Announcement PDF
ASX:EEG
Empire Energy – The Beetaloo Basin Pioneer moving into Production
Empire Annual General Meeting Presentation – 29th May 2025
Empire’s Beetaloo Basin Position
5 TCF gas pilot ready Carpentaria Project with >20 TCF Western Beetaloo resource delineated
• Empire is the largest net acreage holder in the Beetaloo
• All acreage is 100% owned and operated by Empire
• Acreage benefits from high Net Revenue Interest of ~85%1 vs typical US
NRI ~75%
• Acreage is proximal to existing pipeline and road infrastructure to
facilitate rapid commercialisation
• NT Government is investing in infrastructure corridors to facilitate rapid
industry growth
• The Carpentaria Project (EP187) is the immediate focus (5 TCF pilot
ready) targeting first production in 2025 with >20 TCF Western Beetaloo
Velkerri Shale resource providing material drilling inventory
1. Net revenue interest (NRI) equals Working Interest (100%) minus 10% Northern Territory Government royalty (partially offset
by statutory deductions) minus Traditional Owner royalty and private royalties
1
Empire’s Achievements to Date and Near-term Catalysts
EXPLORATION & APPRAISAL
2021
2022
2023
Gas Sales & Transportation: APA Group and Power and Water Corporation MoUs Executed
Carpentaria-1V: demonstrated the existence of Velkerri shales in the Carpentaria Area and flowed gas to surface
Carpentaria-2H flow rates: IP30 of 3.2 TJ (2.8 mmscf) per day
Carpentaria-3H flow rates: IP30 of 3.8 TJ (3.3 mmscf) per day
Carpentaria-4V: intersected the same stacked Velkerri Formation shales as the Carpentaria Project wells thereby opening the
Carpenaria East Area (total 110,000-acre development area delineated (~800 well locations))
Major 2C Contingent Resource upgrade announced for EP187 to 1,739 PJ (1.5 TCF high calorific, low CO2 gas)
Activities to date have been supported by $48 million in Australian Government funding across R&D incentive rebates and
drilling grants
KEY ACTIVITIES TO CARPENTARIA PILOT PROJECT FID
2024
Completed Front End Engineering & Design (“FEED”): including engineering, economic modelling etc.
Acquired 42TJ/d capacity gas plant from AGL Limited
Executed gas sales agreement with the Northern Territory Government for up to 25TJ/d for 10 years at attractive market pricing
Drilled and cased Carpentaria-5H (3,310 metre / 10,860 feet lateral)
Carpentaria Pilot Project is FID ready subject to Traditional Owner agreement. Environmental approvals received
PLANNED ACTIVITIES
2025
1.
2.
3.
Fracture stimulate Carpentaria-5H (60+ stages targeted)
Install the Carpentaria Pilot Project Gas Plant (“CGP”)
Commence gas sales
2026+ Drill additional pilot development wells and appraise Western Beetaloo discoveries (~20 TCF 2U resource)
2
Basin-wide appraisal is demonstrating the commercial case
* Due to casing deformation the majority of flows measured, between 85-95%, came from the first 200m section of the well
3
Appraisal Activity has Delivered the Carpentaria Project
Cost-Effective Approach to Appraisal
• Seismic, multi-stage vertical and horizontal flow tests have delineated a
large stacked play
• Four zones with a net effective area of >460,000 acres (~1,900 km2)
• ~A$130m (~US$83.5m) invested delivered >1,739 PJ (~1.5 TCF)
Commercial rates achieved
•
•
Two horizontal wells stimulated
•
High calorific value gas (1.15 TJ per MMCF)
Excellent flow rates – normalised rate of 3.5 TJ/d per 1,000 m
Gas resource and productivity now established to move into pilot production
•
•
More than 200 drilling locations delineated in the B Shale
~600 additional locations across A, Intra A/B and C Shales
4
Empire has High-Quality, Low CO2 Gas
Empire’s Carpentaria gas composition meets Japanese customer specifications
• Gas for the Ichthys LNG is supplied from the Brewster Member and the
Carpentaria-2H Gas Composition - Mole %
Plover Formations which comprise the Ichthys Gas Field
• Production to date has mainly been from the Brewster Member,
however production is expected to move towards Plover and
peak in the 2030s as Brewster is depleted1
• Gas composition of Brewster and Plover
• Brewster: ~8% (CO2), ~11% (ethane)
• Plover: ~17% (CO2), ~4% (ethane)2
• Empire’s low CO2 (>1%) and high ethane (~12%) is perfectly
positioned to be blended with emerging Ichthys Gas supply to:
• Reduce average CO2 content (lessen need for CO2 stripping and
carbon, capture and storage)
Component
Q3 2022 Testing
Q1-Q2 2023 Testing
C1
Methane
83.17
82.80
C2
Ethane
11.95
12.40
C3
Propane
1.47
1.50
C4
Butane
0.30
0.30
C5+
Pentane and Higher
0.06
0.06
He
Helium
0.16
0.12
CO2
Carbon Dioxide
0.88
0.91
2.01
1.91
100.00
100.00
Other Inerts e.g., Nitrogen
Total Gas Composition
Hydrocarbons
Inerts
Sources:
1. https://www.upstreamonline.com/field-development/inpex-steps-to-the-starting-line-for-next-ichthys-phase/2-1-972375
2. https://www.inpex.com.au/media/yrobfsay/draft-environmental-impact-statement-06-chapter-4-project-description.pdf
3. https://territorygas.nt.gov.au/Knowledge-Centre/latest-news/2022/inpex-commits-to-lng-expansion
• Increase ethane content (attractive to Japanese energy market
given high heating value required and lessen the requirement for
ethane spiking of gas into plant or upon arrival in Japan)
• Support Ichthys LNG planned expansion to three trains by 20303
5
The Carpentaria Pilot Project
Empire is targeting first production from Carpentaria in 2025
The Carpentaria Pilot Project aims to:
• Produce sales gas from existing Carpentaria-2H and Carpentaria-3H test wells,
Carpentaria-5H and future pilot development wells
• Process gas through Empire’s Carpentaria Gas Plant which has a design
capacity of 42 TJ/d (40 mmcf/d)
• Utilise existing McArthur River Gas Pipeline capacity to produce up to 25 TJ /d
(23 mmcf/d) in the pilot phase
- “T-piece” connection has been inserted into the pipeline to facilitate
Empire’s access to the line for gas sales
• Deliver both cash flow and additional resource definition for large-scale
development
Carpentaria 2H, 3H and 5H well pad from above
Carpentaria-2H flare
Carpentaria Gas Plant in operation immediately prior to acquisition
6
Carpentaria-5H
C-5H is the longest horizontal shale well, and will be the largest frack job executed in Australia
• C-5H was drilled from the same well pad as Carpentaria-2H (“C-2H”) and
Carpentaria-3H (“C-3H”) in 5 ½” casing
• C-5H:
- is the longest horizontal well drilled in the Beetaloo to date (3,310
metres of horizontal section); and
- will target ~60 fracture stimulation stages
• C-5H will utilise the best practise completion to optimise productivity.
Empire has engaged specialist US shale experts to refine design and
ensure learnings from previous wells are captured in C-5H
• The goals of C-5H are:
- Execute a development scale well for the Carpentaria Pilot Project;
- Optimise fracture stimulation design to achieve higher productivity;
- Conduct a long-term production test to develop a Carpentaria type
curve for long laterals for development planning, and
- Commence gas sales from the Beetaloo Basin
• Halliburton to commence fracture stimulate C-5H 15th June
7
Increased Stimulation Length
The longer the well – the greater the access to the shale
8
The benefit of experience
9
Empire’s Stacked Play Improves Development Economics
Empire’s four stacked shale
reservoirs are 5x thicker
than the prolific Marcellus
Single Reservoir
Depth
(ft)
5800)
0
Gas
Saturation
100%
328 ft
Gamma Ray
(6400)
Depth
M (ft)
0
Stacked Shale Play Development Concept
Gas
Saturation
100%
C Shale
(5250)
(5500)
(6000)
(6200)
Gamma Ray
(5000)
100 m
SW Marcellus
Section
Four Stacked Reservoirs
Carpentaria-4
Type Section
Marcellus
(5750)
Total Marcellus
Thickness ~60 m
(6000)
(6250)
B Shale
• Four stacked reservoirs allows for fewer
well pads with more wells
Intra A/B • Option for more than 30 wells per pad
(Hybrid Play)
A Shale
Total Net Thickness >300 m
• Leads to improved development
efficiencies and economics
• Akin to Permian Basin style development
10
A Platform for Increased Productivity
Basin-specific drilling and completion methodologies are being developed to drive
increasing flow rates and EUR consistent with the lived experience of the US Shale Revolution
Drilled Appraisal Wells
Demonstrated Execution
> 3.3 km horizontal well drilled
successfully with 5 ½” casing
Drilling
Trialled multiple techniques
Stimulation
61 stimulation stages successfully
executed without screenout
Multiple stimulation fluids trialled
Lift, Choke & Soak
Flowback
No artificial lift required during
flowback
Trialled choke management and
soaking
Future Pilot / Development Wells
• Drilling 3km horizontal wells
• Potential to increase the horizontal length of
the well
• Completion focus for landing zone, geosteering
and cementing
• Higher horsepower and doubling pump rates to
>100 barrels per minute
• One optimised strategy
• Post stimulation well cleanup timing and
technique (“soak”)
• Managed choke scheme for long term
productivity
EUR
Well
Cost
11
10 Year Binding Gas Sales Agreement with NT Government
Foundation gas sales agreement with investment grade customer underwrites pilot economics
• Buyer: Northern Territory Government (Aa3, stable)
• Volume / Term:
• up to 25 TJ/d for 10 years (~75PJ total, net to Empire)
• an additional 10 TJ/d+ for up to 10 years at the option of the Buyer to
be made available by Empire if production levels from the
Carpentaria project exceed 100 TJ/d
• Pricing: ex-field take-or-pay basis at competitive market gas prices,
escalating at 100% of the Australian CPI
• Delivery: McArthur River Gas pipeline (“MRP”)
• A T-piece connection has already been installed into the MRP at the
proposed location of the Carpentaria Gas Plant
• Conditions Precedent: customary conditions for an agreement of this
nature including Empire reaching FID for the Carpentaria Pilot Project
and receipt of regulatory approvals which are well advanced
Carpentaria Gas Plant
12
$65M Beetaloo Financing Package
Empire has credit facilities in place for Carpentaria Pilot Project
• This financing package represents a continuation of a 15-year relationship between Empire and Macquarie Bank
• Execution of the financing package follows the completion of an extensive competitive tender process of global oil & gas
financers
• Financing is be provided across three tranches:
• A$30 million R&D Facility will fund exploration, appraisal and development activities including Carpentaria-5H and
construction of infield infrastructure representing an upsizing and maturity extension of existing A$2.25 million facility
• A$5 million Performance Bond Facility to meet Empire’s Northern Territory environmental bonding obligations
• New A$30 million Midstream Infrastructure Facility to finance refurbishment and construction of the Carpentaria Gas Plant
and associated infrastructure. Repayment of this tranche will be via a tolling fee
• This financing along with existing cash resources, will fund the drilling, completion and flow testing of C-5H and the installation
of the Carpentaria Gas Plant and associated infield infrastructure
13
Government Supporting the Beetaloo
NT Government has primary responsibility for regulation of the Beetaloo Basin
Federal Labor Government is supportive of Beetaloo development
The Hon Lia Finocchiaro (Chief Minister of the Northern Territory)
“The CLP have always stood up for, and supported the Territory’s gas industry, and this industry
will proceed with certainty under a CLP government.
We have this incredible resource right here and thousands of Territory jobs could be created
over the next 20 years.
Gas is the cleaner and cheaper pathway to renewables. The Territory’s gas can provide the
solution to the East Coast power shortage and provide economic benefit to Territorians.”1
The Hon Gerard Maley (Deputy Chief Minister of the Northern Territory)
“Our Government is fully and unequivocally committed to the development of the Beetaloo
Sub-basin, the untapped potential of which represents decades of prosperity and energy
security for Territorians and an answer to the nation’s worsening energy crisis.”2
The Hon Madeleine King MP (Minister for Resources and Minister for Northern Australia)
The Hon Gerard Maley – Deputy Chief Minister NT, The Hon Lia Finocchiaro – Chief
Minister NT and Managing Director Alex Underwood, September 2024
“The (Future Gas) Strategy makes it clear that gas will remain an important source of energy
through to 2050 and beyond, and its uses will change as we improve industrial energy
efficiency, firm renewables, and reduce emissions”
“But it is clear we will need continued exploration, investment and development in the sector to
support the path to net zero for Australia and for our export partners, and to avoid a shortfall in
gas supplies.”3
1. The CLP's Plan to Rebuild the Territory
2. (26) Activity | Gerard Maley MLA | LinkedIn
3. https://www.minister.industry.gov.au/ministers/king/media-releases/australias-future-gas-strategy
14
The Empire Value Proposition
Phase 1
Carpentaria Pilot Project
Phase 2
Domestic Gas Project
Phase 3
Full-Field Development - LNG
• Up to 25 TJ/d (24 mmcf/d)
• Targeting first revenue in 2025
• Mature resource definition and
type curves for larger scale
development
• Gas plant secured
• ~200TJ/d (~190 mmcf/d) to
• ~1 BCF per day to supply LNG
• Carpentaria ‘stacked play’
• ~2.6 million net effective acres of
supply Australian east coast
provides additional drilling
inventory across ~460,000 net
effective acres
export markets
‘running room’ across Western
Beetaloo
• Binding gas sales agreement
with investment grade customer
• Macquarie Bank funding
package secured
15
Near-term Growth Catalysts
2024 Achievements
Key 2025 Catalysts
1. Divested US assets and repaid outstanding debt
1. C-5H stimulation and well testing commencing in June
2. Raised ~$46 million in equity and sale of royalty
2. Obtain Indigenous Approvals
3. Executed Gas Sales Agreement with NT Government
3. Construct surface facilities
4. Obtained Environmental Approvals for Carpentaria and
Western Beetaloo
4. Commence pilot project gas sales
5. Drilled C-5H (longest horizontal in the Beetaloo to date)
6. Arranged committed debt financing for Carpentaria Pilot
Project
16
ASX:EEG
https://empireenergygroup.net/
Alex Underwood
Managing Director
info@empiregp.net
+612 9251 1846
17
Appendix 1:Corporate Snapshot
ASX Share Price
Capital Structure
Shares on issue1
1,190.7M
Share price
A$0.16
Market cap
A$190.5M
2
3
Net debt / (cash )
(A$16.1M)
Enterprise value
~A$206.6M
Cash at bank3
~A$35.8M
$0.3300
$0.3100
$0.2900
$0.2700
$0.2500
$0.2300
$0.2100
$0.1900
$0.1700
May
Apr
Mar
Feb
Jan
Dec
Nov
Oct
Sep
Aug
Jul
Jun
May
$0.1500
Contingent and Prospective Resources
Top Shareholders
Pangaea Resources
11.5%
2C Contingent Resources
1.65 TCFe
1,927 PJe
Sheffield Holdings (USA)
6.7%
2U Prospective Resources
46.6 TCFe
49,125 PJe
Elphinstone Group
6.9%
Liberty Oilfield Services (USA)
4.0%
1. Empire has 26.5m Share Rights on issue to members of the management team and Board, 14.3m of which have performance hurdles tied to total shareholder return or service period thresholds. Subject to shareholder approval, Empire will
issue 87,500,000 options exercisable at A$0.24 per share for 2 years from the date of issuance to investors in the May 2025 placement.
2. Total available debt of A$65.0 million , comprising: (i) A$30.0 million revolving R&D facility (drawn to A$15.3m) ; (ii) A$5 million performance bonding facility (drawn to A$4.4 million), representing a contingent liability; and (iii) A$30m Midstream
Infrastructure Facility (undrawn). All the facilities are provided by Macquarie Bank. Empire expects to receive an R&D Tax Offset of A$16m- A$18m in H2. 80% of which will be applied to repayment of R&D facility and 20% retained for working
capital.
18
3. As at 27 May 2025
Appendix 2: Empire’s Board of Directors
Peter Cleary
Alex Underwood
Karen Green
Louis Rozman
Prof. John Warburton
Chairman
Managing Director
Non-Executive Director
Non-Executive Director
Non-Executive Director
• Distinguished 29-year career
representing Santos, the
North West Shelf Venturers
and BP in Asia. His executive
career was in LNG, pipeline
gas and chemicals
operations
• Associate Director Energy
Markets Division of
Macquarie Bank Limited
(Sydney and Singapore) for
10 years
• Over 30 years’ experience in
Chartered Accountancy,
predominantly in business
advisory services and has
lived and worked in Darwin
since 1991
• Former Managing Director of
CH4 Gas which merged with
Arrow Energy and later
acquired by PetroChina and
Shell
• Highly regarded petroleum
geoscientist experienced in
big fields
• Member of the Executive
Committee of the Australia
Japan Business Co-operation
Committee and the Australia
Korea Business Council
• Director Natural Resources
Division of Commonwealth
Bank of Australia
(Singapore)
• Financial Analyst BHP Billiton
Petroleum (Perth)
• Experience investing debt
and equity in the upstream
oil and gas sector and
identification of value
creation opportunities for
upstream oil and gas
development / production
assets
• Deep understanding as an
institutional investor of the
key drivers of shale gas
value generation
• Managing Partner for the
Northern Territory and leader
for Advisory Services for
Deloitte in the Northern
Territory
• 5th female ever to enter the
Deloitte Australian Partnership
• Currently on the Northern
Territory Investment Advisory
Group and on the Northern
Territory National Security
Advisory Panel.
• Non-Executive Director of
Airport Development Group
Pty Ltd (the long-term lease
holder of Darwin International
Airport, Alice Springs Airport
and Tennant Creek Airport)
• Founding principal of Pacific
Road Capital, a resources
investing manager of private
equity funds
• Former Chief Operating
Officer of AurionGold Limited
• 30 years technical &
leadership experience in
leading E&P companies
including BP, LASMO-Eni and
Oil Search
• Previously Chief of
Geoscience & Exploration
Excellence for Oil Search
• Chairman of the VALMIN
Code Committee for the
AusIMM and Australian
Institute of Geoscientists
19
Appendix 3: A Globally Significant Resource Position
Contingent
Resources (Gas)
Low Estimate Best Estimate
(1C)
(2C)
Contingent Resources
(Liquids)
High
Estimate
(3C)
Low Estimate Best Estimate
(1C)
(2C)
High
Estimate
(3C)
Prospective
Resources (Gas)
Prospective Resources(Liquids)
Low Estimate Best Estimate
High
(1U)
(2U)
Estimate (3U)
Low Estimate Best Estimate
High
(1U)
(2U)
Estimate (3U)
PJ
PJ
PJ
mmbbls
mmbbls
mmbbls
PJ
PJ
PJ
mmbbls
mmbbls
mmbbls
365.2
1,906.1
3,946.1
0.9
3.5
14.1
12,380
44,540
145,523
164
764
3,509
Empire 2C Contingent Resource of 1,906 PJ (1,625 BCF gas) and 3.5 MMBBLs liquids
Empire P(50) Prospective Resource of 44,541 PJ (42 TCF gas) and 764 MMBBLs liquids
Note: Refer to EEG announcement dated 29 May 2023 for Netherland, Sewell & Associates, Inc. Contingent and Prospective Resources
Estimate of BCF to PJ undertaken by Empire of 1.06
20
Appendix 4: Large Western Beetaloo Resource
Comprehensive well and seismic datasets in the Western Beetaloo Project have defined a
large extensive resource strategically located on existing infrastructure
Resource has been delineated
•
•
•
•
Delineated ~2.6 million net effective acres
100+ TCF OGIP Discovery (B Shale only)
Less than 1% CO2
Thickest B and C Shale in Beetaloo
• Same rock as Carpentaria Project – Stacked Play
• Huge running room
Forward program
•
•
EP 167 and EP 168 100% EEG
Up to 380 km in-fill 2D seismic oriented for future Hz wells
Multiple locations cleared for drilling and flow testing
21
Appendix 5: Empire Energy Investment Case
The Beetaloo Basin Focused Gas Development Company
•
The Beetaloo’s Velkerri Shale is an enormous (>500 TCF) low CO2 shale gas resource located in Northern Australia close to Asian LNG markets and existing export
infrastructure
•
The Beetaloo is a stacked shale play with world class geological characteristics analogous to the prolific US Marcellus Shale
•
Empire holds ~3 million net effective Beetaloo acres in two contiguous landholdings
•
Empire owns and operates all of its acreage with 100% working interest and ~85% net revenue interest
•
Empire’s acreage contains >47 TCFe 2U resource and >1.6 TCF 2C resource independently assessed by NSAI with <1% CO2
•
Recent appraisal drilling by Empire and other operators has demonstrated commercial viability
•
•
Binding gas sales agreement with investment grade customer
•
Empire is targeting first gas sales from its Carpentaria Pilot Project in 2025 with scope to grow to LNG scale in years ahead
Australian gas prices are over two times US, demonstrating an urgent need for increased supply
22
Disclaimer
This presentation has been prepared by Empire Energy Group Limited (“Empire” or the “Company”). The information in this presentation is information of a
general nature and is subject to change without notice. The information in this presentation does not purport to be complete, nor does it contain all of the
information which would be required in a prospectus prepared in accordance with the requirements of the Corporations Act 2001 (Cth). It contains information
in a summary form only and should be read in conjunction with Empire’s other periodic disclosure announcements to the ASX available at www.asx.com.au.
An investment in Empire shares is subject to known and unknown risks, many of which are beyond the ability of Empire to control or predict. These risks may
include, for example, movements in oil and gas prices, a failure to acquire some or all of the targeted acreage, risks associated with the development and
operation of the acreage, exchange rate fluctuations, an inability to obtain funding on acceptable terms or at all, loss of key personnel, an inability to obtain
appropriate licences, permits and or/or other approvals, inaccuracies in resource estimates, share market risks and changes in general economic conditions.
Such risks may affect actual and future results of Empire and its shares.
This presentation contains statements, opinions, projections, forecasts, and other material (“forward looking statements”). These statements can be identified by
the use of words like ‘anticipate’, ‘believe’, ‘intend’, ‘estimate’, ‘expect’, ‘may’, ‘plan’, ‘project’, ‘forecast’, ‘will’, ‘should’, ‘could’, ‘seek’ and other similar
expressions. Forward looking statements may be based on assumptions which may or may not prove to be correct. None of Empire, its respective officers,
employees, agents, advisers or any other person named in this presentation makes any representation as to the accuracy or likelihood of fulfilment of the
forward looking statements or any of the assumptions upon which they are based and disclaim any obligation or undertaking to revise any forward looking
statement, whether as a result of new information, future event or otherwise.
Maps and diagrams contained in this presentation are provided to assist with the identification and description of Empire’s lease holdings and Empire’s intended
targets and potential exploration areas within those leases. The maps and diagrams may not be drawn to scale and Empire’s intended targets and exploration
areas may change in the future.
All financial information is in Australian dollars unless stated otherwise.
The information contained in this presentation does not take into account the investment objectives, financial situation or particular needs of any recipient and
is not financial product advice. Before making an investment decision, recipients of this presentation should consider their own needs and situation and, if
necessary, seek independent professional advice.
To the maximum extent permitted by law, Empire and its respective officers, employees, agents and advisers give no warranty, representation or guarantee as
to the accuracy, completeness or reliability of the information contained in this presentation. Further, none of Empire nor its respective officers, employees,
agents or advisers accept, to the extent permitted by law, responsibility for any loss, claim, damages, costs or expenses arising out of, or in connection with, the
information contained in this presentation. Any recipient of this presentation should independently satisfy themselves as to the accuracy of all information
contained herein.