Managing Director's Presentation to the AGM
Released
Released
Announcement PDF
Annual General Meeting
Presentation
29 May 2026
2
Beetaloo Energy Australia Limited
This presentation has been prepared by Beetaloo Energy Australia Limited (“Beetaloo” or the “Company”). The information in this presentation is information of a general nature
and is subject to change without notice. The information in this presentation does not purport to be complete, nor does it contain all of the information which would be required
in a prospectus prepared in accordance with the requirements of the Corporations Act 2001 (Cth). It contains information in a summary form only and should be read in
conjunction with Beetaloo’s other periodic disclosure announcements to the ASX available at www.asx.com.au.
An investment in Beetaloo shares is subject to known and unknown risks, many of which are beyond the ability of Beetaloo to control or predict. These risks may include, for
example, movements in oil and gas prices, a failure to acquire some or all of the targeted acreage, risks associated with the development and operation of the acreage,
exchange rate fluctuations, an inability to obtain funding on acceptable terms or at all, loss of key personnel, an inability to obtain appropriate licences, permits and or/or
other approvals, inaccuracies in resource estimates, share market risks and changes in general economic conditions. Such risks may affect actual and future results of Beetaloo
and its shares.
This presentation contains statements, opinions, projections, forecasts, and other material (“forward looking statements”). These statements can be identified by the use of words
like ‘anticipate’, ‘believe’, ‘intend’, ‘estimate’, ‘expect’, ‘may’, ‘plan’, ‘project’, ‘forecast’, ‘will’, ‘should’, ‘could’, ‘seek’ and other similar expressions. Forward looking statements may
be based on assumptions which may or may not prove to be correct. None of Beetaloo, its respective officers, employees, agents, advisers or any other person named in this
presentation makes any representation as to the accuracy or likelihood of fulfilment of the forward looking statements or any of the assumptions upon which they are based and
disclaim any obligation or undertaking to revise any forward looking statement, whether as a result of new information, future event or otherwise.
Maps and diagrams contained in this presentation are provided to assist with the identification and description of Beetaloo’s lease holdings and Beetaloo’s intended targets and
potential exploration areas within those leases. The maps and diagrams may not be drawn to scale and Beetaloo’s intended targets and exploration areas may change in the
future.
All financial information is in Australian dollars unless stated otherwise.
The information contained in this presentation does not take into account the investment objectives, financial situation or particular needs of any recipient and is not financial
product advice. Before making an investment decision, recipients of this presentation should consider their own needs and situation and, if necessary, seek independent
professional advice.
To the maximum extent permitted by law, Beetaloo and its respective officers, employees, agents and advisers give no warranty, representation or guarantee as to the accuracy,
completeness or reliability of the information contained in this presentation. Further, none of Beetaloo nor its respective officers, employees, agents or advisers accept, to the
extent permitted by law, responsibility for any loss, claim, damages, costs or expenses arising out of, or in connection with, the information contained in this presentation. Any
recipient of this presentation should independently satisfy themselves as to the accuracy of all information contained herein.
Disclaimer
3
Beetaloo Energy Australia Limited
Investment Overview
Beetaloo Energy is unlocking a world-class gas resource to supply domestic and international
gas markets
Substantial Gas Resource in Beetaloo Basin
100% interest in ~3 million net effective Beetaloo acres containing >46 TCFe 2U
resource and >1.6 TCF 2C resource with <1% CO2
1
Strategic Market Access
Positioned to supply both domestic gas markets and Asian LNG demand via existing
and planned infrastructure
Near-Term Production with Clear Commercialisation Pathway
First appraisal gas sales targeted for Q4 2026, underpinned by a binding 10-year NT
Government Gas Sales Agreement
Accelerating Development with Highly Encouraging Well Clean Up Results
5 wells drilled including Carpentaria-5H, which delivered 67 fracture stages across a 2,955m
horizontal section and achieved a peak gas flow rate of 11.2TJ/day2 during clean up
1. BTL announcement 29 May 23 Netherland, Sewell & Associates, Inc. Contingent and Prospective Resources, liquids conversion of 6 BCF/MMBBL
2. BTL announcement 22 Dec 25 Carpentaria-5H Clean-Up Flow Test Update
Carpentaria Pilot Project Funding
Upsized $45M Midstream Infrastructure Facility with Macquarie Bank funds the
Carpentaria Gas Plant, a 100%-owned processing facility to monetise appraisal gas
1.6 TCF
2C Contingent Gas Resource1
~3 million ac
Prospective Net Acreage1
46 TCFe
2U Prospective Gas Resource1
10 PJ
Initial Pilot Area EUR per Well2
4
Beetaloo Energy Australia Limited
Beetaloo Energy Value Catalysts
Strategic Vision Value Proposition
Phase 2 Domestic Gas Project
• ~200TJ/d to supply Australian east coast
• ~2.6 million net effective acres of ‘running
room’ across Western Beetaloo
Phase 1 Carpentaria Pilot Project
• Up to 25 TJ/d
• Targeting first revenue in 2026
Phase 3 Full Field Development - LNG
• ~1 BCF per day to supply LNG export
market
Largest 100%-owned acreage position across the Beetaloo
and McArthur Basins
Simple royalty regime with High Net Revenue Interest of
~85-90%1 vs typical US NRI ~75%
1. Net revenue interest (NRI) equals Working Interest (100%) net of 10% Northern Territory Government royalty (partially offset by statutory deductions), Traditional Owner royalty and private royalties
Structural gas shortages domestically and internationally
underpin long-term demand and price support
100%-owned Carpentaria Gas Plant removes third-party
dependency and accelerates first revenue
Key Near Term Catalysts
Ministerial approvals and Final Investment Decision
Q2 2026: Recommence the Carpentaria-5H flow test
Q3 2026: Installation of Carpentaria Gas Plant and tie-in 3 production wells
Q4 2026: Commence Carpentaria Pilot Project gas sales
Strong government and infrastructure alignment
accelerating the pathway to commercialisation
Increasing confidence in the Beetaloo Basin with recent
uptick in appraisal programs and investments
5
Beetaloo Energy Australia Limited
Corporate Snapshot
Pangaea Resources 11.4%
Elphinstone Group 6.6%
Liberty Oilfield Services (USA) 3.9%
Macquarie Group 2.1%
BTL top 20 shareholders hold 56.0%; top 50 shareholders hold 65.1%
Shares on Issue 1,487.0M
In the Money Options1
148.0M
Share Price A$0.29
Market Cap A$431.2M
Debt2
A$15.2M
Cash3 A$65.2M
Enterprise Value A$381.1M
1. As at 22 May 2026, BTL has approximately 94.3 million options on issue with an exercise price of A$0.24 expiring on 26 August 2027, 3.7million options with an exercise price of A$0.24 expiring on 2 September 2027, 25 million options with an exercise price
of A$0.24 expiring 31 December 2029 and 25 million options with an exercise price of A$0.27 expiring 31 December 2029. All tranches are in the money and, if fully exercised, would generate total proceeds of approximately A$36.3 million for BTL.
2. Total available debt of A$65.0 million, comprising: (i) A$30.0 million revolving R&D facility (drawn to $A12.5 million); (ii) A$5.0 million performance bonding facility (drawn to A$2.7 million), representing a contingent liability; and (iii) A$45.0 million
Midstream Infrastructure Facility (undrawn) as at 25 May 2026.
3. Cash balance includes A$5.0 million fully underwritten SPP which is subject to shareholder approval.
Peter Cleary Chair
Alex Underwood Managing Director & CEO
Karen Green Non-Executive Director
Prof. John Warburton Non-Executive Director
BTL 12-Month Share Price & Volume (27 May 2026)
Capital Structure (27 May 2026)
Board of Directors
Top Shareholders
0
10
20
30
May
25
Jun
25
Jul
25
Aug
25
Sep
25
Oct
25
Nov
25
Dec
25
Jan
26
Feb
26
Mar
26
Apr
26
May
26
0.00
0.10
0.20
0.30
0.40
Volume
(m)
Price
(A$)
6
Beetaloo Energy Australia Limited
International and Domestic Gas Supply Deficit Looming
A structural supply gap is emerging across both international and domestic markets
Forecast global LNG supply
deficit mid-2030s
1. Shell LNG Portfolio Strategic Spotlight, March 2026.
2. AEMO Gas Statement of Opportunities March 2026, Figure 39. Southern states include NSW, ACT, SA, TAS and VIC. Northern states include QLD and NT.
3. AEMO 2025 Inputs, Assumptions and Scenarios Report, August 2025 Section 3.3.11 Data centre forecast
Southern States AEMO Supply Forecast, PJ p.a.2
Shell Global LNG Demand Outlook, mtpa1
AEMO3 forecasts rapid growth in data centre
electricity demand - rising ~25% p.a. to 12 TWh
by 2030 ≈6% of National Energy Market supply)
0
50
100
150
200
250
300
350
400
2026 2029 2032 2035 2038 2041 2044
Existing and Committed Supply Anticipated Supply
Flow from North Step Change Demand
Supply Gap
Increasing reliance on gas flow
from the North (QLD & NT
including the Beetaloo Basin)
7
Beetaloo Energy Australia Limited
Beetaloo Strategically Located Near Asian LNG Markets
Australian domestic gas and Asian LNG indices trade at multiples of US Henry Hub prices
1. Bloomberg NEF, Beetaloo Energy
2. EIA 18/05/2026 Henry Hub Natural Gas Spot Price
3. AEMO Wallumbilla Benchmark Price at 27/05/2026 A$10.01/GJ (1 GJ to 0.9478 MMBtu; FX AUD/USD 0.7)
4. ACCC LNG netback price series May 2026. “LNG netback price is a measure of an export parity price that a gas supplier can expect to receive for exporting its gas. It is calculated by taking the price that could be received for LNG and subtracting or
‘netting back’ the costs incurred by the supplier to convert the gas to LNG and ship it to the destination port”
5. ACCC Market Advice and Estimates of Contemporary LNG Contract Prices December 2025 Report #8
6. ACCC LNG Freight Rate Estimates - Results December 2025
LNG Tanker Sailing Days to Tokyo Bay1 Gas Market Reference Prices, US$/MMBtu
3.07
3.57
6.64
15.34
US Henry Hub² Premium to
Henry Hub
Wallumbilla Hub
(East Coast, Aus)³
Wallumbilla
LNG netback⁴
LNG Shipping Cost Estimates, US$/MMBtu
US Gulf Coast to Asia5 $2.37
Gladstone, AU to Japan6 $1.08
8
Beetaloo Energy Australia Limited
Infrastructure Pathway to Commercialisation
Multiple delivery pathways connect Beetaloo gas to domestic markets and LNG facilities
Carpentaria Gas Plant enables Beetaloo Energy
to monetise appraisal gas from first
production, capturing full upstream value
NT Government is investigating a multi-user
infrastructure corridor (gas, water, optic fibre)
to connect the Beetaloo Basin to Darwin
Major infrastructure players have identified
Beetaloo as a priority connection, with
expansion plans already in advanced stages
Scale and position to supply both the domestic
markets and growing Asian LNG demand from a
single development
9
Beetaloo Energy Australia Limited
Significant & Growing Investment in the Beetaloo Basin
~$1 billion committed to the Beetaloo Basin in the next ~18 months – with LNG major INPEX's
entry providing strong external validation of commercial potential
1. Formentera and INPEX Announce Strategic Partnership to Accelerate Development of Australia’s Beetaloo Shale Resources, Formentera Businesswire 27 March 2026
2. Tamboran farmout Pilot Area and BCDA acreage for significant premium in acreage value, Tamboran Resources Announcement 31 March 2026
3. Tamboran Resources 3Q FY26 Result Presentation, Slide 9 14 May 2026
4. Tamboran Resources 3Q FY26 Result Presentation, Slide 8 14 May 2026
5. Darwin LNG reborn: Santos eyes Beetaloo as Barossa fires up, Australian Financial Review 8 March 2026
INPEX farm-in with Daly Waters
Energy1
• INPEX to acquire ~68,000 net
acres within Daly Waters Energy
acreage through a staged earn-in
for up to US$208 million in
consideration
• INPEX has option to acquire
~75,000 additional net acres for
US$266 - $411 million in
consideration, dependent on
option execution timing
Daly Waters Energy farm-in with
Tamboran Resources2
• Tamboran Resources will farm
down approximately 10,000 acres
of its working interest across the
core block to Daly Waters Energy
for staged earn-in up to ~US$28.5
million
Capital raising to fund growth and
appraisal activities3
• US$198 million of capital raised
funds 2026 and 2027 growth and
appraisal activities
EP161 Upcoming Activity4
• $300 million5 program to drill two
or three wells in acreage it holds
jointly with Tamboran Resources
• Wells planning to be stimulated
with up to 60 stages and flow
tested over 12-month period
• Targeting FID in late 2028 or early
2029
10
Beetaloo Energy Australia Limited
Activity in the Beetaloo Basin is Accelerating
Four project areas with multi-horizontal wells located throughout the basin
11
Beetaloo Energy Australia Limited
5 TCF gas pilot ready Carpentaria Project with >20 TCF Western Beetaloo resource1
1. BTL announcement 29 May 23 Netherland, Sewell & Associates, Inc. Contingent and Prospective Resources; BTL announcement 14 Apr 21 Transformational Acquisition of Pangaea Resources; Company analysis of 3C and 2U.
2. BTL announcement 26 Jul 24 Binding Gas Sale Agreement with NT Government
Focus Area 2:
Western Beetaloo (EP167/168) >20 TCF resource providing
material drilling inventory. 2D seismic program planned to
commence in June 2026.
Focus Area 1:
Carpentaria Project (EP187) (5 TCF pilot ready) targeting
first production in Q4 2026 to supply the Northern Territory
Government under a 10-year binding Gas Sales
Agreement2.
Beetaloo Energy’s project areas are located across
the thickest section of stacked Velkerri Shale
reservoirs in the basin
Beetaloo Energy’s Two Focus Areas in the Basin
12
Beetaloo Energy Australia Limited
Stacked Play Improves Development Economics
C Shale
B Shale
Intra A/B
A Shale
Marcellus
100
m
328
ft
Single Reservoir
Four Stacked Reservoirs
Total Marcellus
Thickness ~60 m
Stacked shale play developments allow for:
• More wells per pad
• Improved development efficiencies and
economics
• Analogous to Permian Basin style development
Stacked Play Development Example
Beetaloo Energy’s four
stacked shale reservoirs
are 5x thicker than the
prolific Marcellus Shale
Carpentaria-4 Type Section
SW Marcellus Section
Total Net Thickness >300 m
Multi-Zone Cube
Development –
Delaware Basin1
1. Devon Energy Cube Development: What, How, When and Why? November SPE BD Group
Presentation, 28 November 2018
Gas Saturation
0 100%
Gamma Ray
Depth
M (ft)
(5000)
(5500)
(6000)
0 100%
Gas Saturation
(6200)
(6000)
(5800)
(6400)
Depth
(ft)
Gamma Ray
13
Beetaloo Energy Australia Limited
Western Beetaloo Seismic Program
Planned seismic lines oriented for future horizontal wells, focusing on the deepest area adjacent
to key infrastructure
Program Overview
• In-fill 2D seismic and appraisal drilling focused across the proven Gas
Discovery Area between Tarlee-S3 and Birdum Creek-1
• Targeting the same reservoir units as Carpentaria, but with
significantly thicker B Shale development
• Program area strategically located near pipeline, road, and rail
infrastructure
Seismic Program Planned to Commence in June
• Land access agreements have now been executed with pastoralists
• Clearing for access will commence in mid-June
• 230 km of seismic lines under existing environmental approvals
designed to optimise future horizontal well orientation
EP 167 and EP 168 100% BTL
• Seismic program designed to delineate a >20 TCF resource
and build a multi-decade LNG-scale drilling inventory
14
Beetaloo Energy Australia Limited
Territory Sands Investment
$10 million investment securing local frac sand supply and reducing well frac costs
Strategic Rationale
• Frac sand is one of the largest cost inputs in horizontal well
completions, representing ~28%¹ of total well frac costs.
• Establishes a local, dedicated frac sand supply for Beetaloo Basin
operations.
• Eliminates exposure to distant supply chains and logistics
constraints that drive cost and schedule risk.
• Proximity pricing delivers significant long-term frac cost
reductions, underpinning supply-chain resilience across multi-
year development programs.
Key Investment Terms
• Up to ~$10m secured credit facility funding Territory Sands’ sand
mine and plant development.
• Attaching options provide Beetaloo Energy with the ability to
acquire ~24% equity in Territory Sands.
• Beetaloo Energy will secure priority offtake access to frac sand
under confidential commercial terms.
2025 Frac Sand Potential Local Frac Sand
A$/tonne
Frac Sand Delivery Costs
~90% potential reduction in
delivery cost
~3501
~30
Territory Sands
1. BTL internal calculations based on Carpentaria-5H hydraulic stimulation costs
15
Beetaloo Energy Australia Limited
Carpentaria-5H Flow Test
Carpentaria-5H (C-5H) achieved strong flow rates with enhanced permeability, underpinning
long-term performance1
KEY METRICS
• Length: 2,955 metres (9,695
feet)
• Stages: 67 stages executed
• Fluid intensity : 52 bbl/ft avg
• Proppant intensity: 2,295 lb/ft
avg
• Proppant per stage: 337,000 lbs
avg
• Strong clean-up flow performance: C-5H achieved a peak gas
flow rate of 11.2 TJ/day and a 30-day average of 7.1 TJ/day, with a
Day-30 exit rate of 6.3 TJ/day
• Disciplined flowback strategy applied: Use of a restricted-choke,
extended clean-up methodology resulted in a >5× increase in
maintained fracture conductivity relative to earlier Carpentaria
wells, consistent with a focus on long-term well performance
• Positive reservoir indicators: Flowback analysis suggests higher
apparent shale permeability (~60%) and longer effective fracture
lengths compared with previous wells
• Clean-up ongoing with upside potential: ~23% of injected frac
fluid recovered to date, with improving gas-to-water ratios.
1. BTL announcement 22 Dec 25 Carpentaria-5H Clean-Up Flow Test Update
• Previous wells recorded up to ~30% uplift in IP30 rates
following full clean-up
• Beetaloo Energy plans to recommence the C-5H flow test in
Q2 2026, following installation of an additional water tank to
manage water production after a substantial wet season
16
Beetaloo Energy Australia Limited
Carpentaria Pilot Project
Production Wells
Carpentaria-2H, Carpentaria-3H and Carpentaria-5H
EMP’s fully approved for additional pilot wells
Facility
Civil works for the Carpentaria Gas Plant completed
Jan-2026.
Mechanical refurbishment of plant equipment in
Roma completed Mar-2026
• On-site installation of the Carpentaria Gas Plant
underway
Offtake
T-piece inserted into the McArthur River Gas Pipeline
Traditional Owner approval to the sale of appraisal gas
• Pipeline compression to increase capacity up to 25
TJ/d during the pilot phase
Beetaloo Energy is on track to deliver first gas sales from the Carpentaria Pilot Project in Q4 2026
On-site installation of the Carpentaria Gas Plant is underway
• Pilot gas sale expected to commence in Q4 2026