SEAAOC Conference Presentation
Released
Released
Announcement PDF
ASX:EEG
Empire Energy – Beetaloo Basin – On the Path to Pilot Production and Beyond
South East Asia Australia Offshore & Onshore Conference – 13 September 2023
Empire has a Commanding Beetaloo Position
• Total potential Prospective Resources in the Velkerri B shale of between 50
TCF and 100 TCF (one of five productive shale units) based on Government
estimates of 500 TCF gas-in-place (assuming recovery factors of between
10% and 20%)
Beetaloo Basin
+500 TCF
GIIP
• Large enough to supply both LNG and east coast markets
• Empire (100%) NT 2C Contingent Resource of 1,906 PJ (1.63
Amadeus Basin
0.22
TCF) gas and 3.5 MMBBLs liquids1
29.3
Cooper Basin
1.0
• Empire (100%) EP187 2C Contingent Resource of 1,739 PJ (1.5
TCF) at an average EUR per well location of 7.9 PJ
Bowen &
Surat Basins
• Empire (100%) P(50) Prospective Resource of 44,541 PJ (41.67
TCF) gas and 764 MMBBLs liquids1,2
Source: Netherland, Sewell & Associates Inc
1. Western Beetaloo 1.06 PJ per BCF applied
2. Barney Creek – McArthur Basin targets, 1.06 PJ per BCF applied
Otway Basin
Gippsland Basin
0.6
0.02
Bass Basin
1.7
Beetaloo Velkerri B GIIP Estimate
(SEAAOC 15 November 2018)
2P Reserves (TCF)
(Energy Quest as at 31 March 2023)
1
Empire has Grown its Certified 2C Contingent Resources
Empire’s on ground activities have grown discovered resources to an LNG Scale
EP187 Contingent Resources (100%) as at
May 2023
Net Sales Gas (PJ)
Low Estimate Best Estimate
(1C)
(2C)
Key Drivers
of 2C Uplift
Carpentaria-1 drill
Pangaea
acquisition
Carpentaria-1 EPT
Carpentaria-2H drill
Charlotte 2D seismic
survey
High
Estimate
(3C)
Total
304
1,739
3,507
Average EUR Per Development
Well
6.2
7.9
9.3
Indicative Pilot Development Well
Cost ($20m per well)
$3.23 / GJ
$2.53 / GJ
$2.15 / GJ
Indicative Full Field Development
Well Cost ($15m per well)
$2.42 / GJ
$1.90 / GJ
$1.61 / GJ
Carpentaria-2H EPT
Carpentaria-3H drill
and EPT
Carpentaria-4V drill
Note: Refer to EEG announcement dated 29 May 2023 for Netherland, Sewell & Associates, Inc. Contingent and Prospective Resources
2
Basin-wide Appraisal Drilling is Demonstrating the Commercial Case
• Empire drilling and fracture
stimulation costs ~2/3 of deeper
wells (on a like for like basis)
• Empire generating strong flow rates
on a per dollar of capex basis,
building the economic case for the
basin flanks
• Empire’s gas has a higher energy
content than dry gas (with positive
implications for revenue)
• 100% interest in all properties and
no private royalties maximises farm
out flexibility and economics
• Empire’s extremely low in-situ CO2
reduces offset costs
3
Empire’s Beetaloo Footprint Comparable to Marcellus
• Empire’s Beetaloo footprint is comparable in size to significant
portions of the core areas of the Marcellus Shale play in the
Appalachian Basin
• More than 9,000 wells are producing from similar depths to
Empire Beetaloo play (~34 percent of all Marcellus wells)1
across both core areas
• The majority of the more than 27,000 producing Marcellus
Shale wells are less than 2,250 metres below ground level
• Marcellus shale producing acreage has typically transacted
“Marcellus shale
gas production has
grown by 25 BCF/d
over ten years”
BCF/d
at US$5,000 to US$25,000 per acre2. Empire is valued at ~US$70
per acre based on the Carpentaria Project and Western
Beetaloo Project alone
Source: U.S. Energy Information Administration - EIA - Independent Statistics and Analysis
1. EIA and relevant State databases
2. https://mercercapital.com/energyvaluationinsights/ma-in-marcellus-utica-basins-2
Insert map: Empire’s base Velkerri B Shale at same scale as base Marcellus Shale map
4
Large Pilot Development and Appraisal Position (100% EEG)
Empire has two large scale appraisal and pilot development
projects across the Beetaloo Sub-basin connected to infrastructure
• Carpentaria – Pilot Development
• Covers 110,000 acres
• Fully delineated with 2D seismic, two horizontal stimulated wells, one
vertical multistage simulated well, one step-out vertical well and three
Extended Production Tests
• Focused on FID for pilot project in 2023 and construction in 2024
• 2C Contingent Resource 1,739 PJ (~1.5 TCF)
• 2U Prospective Resource 3,542 PJ (~3.0 TCF)
• Western Beetaloo – Appraisal
• Large, extensive play covering ~1m acres
• Delineated by five spatially drilled
wells, ~1,800 metres of core and
>1,000 km 2D seismic acquired
• Further de-risked by activity in
Carpentaria (same rock)
• 2U Prospective Resource ~28 TCF
One of only three operators in the Basin
5
Empire’s First Horizontal Well Flow Test A Success
over 127 days
• This equates to a normalised rate of 8.25 TJ (7.2 mmscf) per
day for an equivalent 3,000m horizontal development well for
the entire test period
• Gas composition remained consistent with high calorific value and
extremely low CO2 (less than 1%)
• C-2H was brought back online after an initial 51 days of testing to
test the benefit of soaking with excellent results
Without Vertical Exaggeration
B Shale
65m (~213 ft)
• Carpentaria-2H (“C-2H”) produced a total of 323 TJ (281 mmscf)
Stylised Schematic
Vertical
Exaggeration 5:1
C-2
Carpentaria-2H is the fourth horizontal well in the basin, was drilled 100% within zone, and
successfully flowed gas to surface from all 21 frac stages
Target depth
1,600m (5,250 ft)
1,345m (4,411 ft) Horizontal Section
• The post-soak 2023 IP30 is confirmed at 10.5 TJ (9.2 mmscf) per
day for an equivalent 3,000 metre horizontal development well
• Completed without the need for production tubing, well freeflowed through 4 ½” casing. Empire is likely to move to 5 ½” in
future scenarios
• These rates exceed the benchmark other Beetaloo players have
put forth as commercial, at a capital cost of ~half of Empire’s peers
Carpentaria-2H flare
6
Empire’s Record Breaking Carpentaria-3H Horizontal Well
Carpentaria-3H is the longest horizontal shale well, and the largest frac job ever executed
in Australia, on time and ~$6m under budget
• Total horizontal lateral length of 2,632m (8,633 ft), with 2,374 m
Stylised Schematic
Vertical
Exaggeration 5:1
Without Vertical Exaggeration
(7,786 ft) successfully placed within the target Velkerri B shale (90%
in zone), with strong gas shows throughout the target zone
2,632m (8,633 ft) Horizontal Section
• Confirming long horizontals can be drilled in the Beetaloo
executing all planned 40 stages across 1,989m (6,526 ft)
• A total of 12.8 million lbs of proppant placed, averaged 319,000 lbs
C-2
• Carpentaria-3H successfully stimulated, significantly below budget,
per stage (~2,000 lbs/ft). Comparable to US Shale frac intensity
Target depth 1,750m (5,250 ft)
• Carpentaria-3H was brough back online on 3 August 2023 and has
demonstrated the material benefits to productivity of soaking,
through significantly increased gas flow rates
• Following reopening, Carpentaria-3H flowed gas at an average
rate of 3.3 mmscf / day (3.8 TJ / day) over the first 30 days (“IP30”)
• The Carpentaria-3H “post-soak” average daily production rates
have increased 30% over the IP27 “pre-soak” test conducted in Q1
2023
SLB 185 Rig drilling Carpentaria-3H in EP187
7
Connections to Market for Large Gas Volumes
• APA Group (ASX: APA) and Empire have executed an agreement
for the establishment of exclusive midstream gas infrastructure
furthering the memorandum of understanding as announced by
Empire on 27 October 2021
• APA will spend up to $5 million under a proposed early works
agreement on Engineering and Design Concepts for midstream gas
facilities associated with Empire’s Carpentaria Pilot Project, which
would materially reduce the capital requirements for Empire to
commence commercial production
• APA and Empire are also working on concepts to transport large
volumes of gas from the Beetaloo to Australian east coast markets
(in excess of 500 TJ/d). The leading concept considers the potential
construction of a new pipeline connecting the Beetaloo to APA’s
existing Carpentaria Gas Pipeline between Mount Isa and Ballera
(Queensland)
• Negotiations with NT Government owned utility Power and Water
Corporation under the existing MOU are advancing to facilitate
access to the McArthur River Pipeline
• Empire is currently in active gas sales negotiations with multiple
parties for supply of gas in both the pilot phase and full
development phase
8
Pathway to Carpentaria Pilot Project Production and Revenue
EXPLORATION & APPRAISAL
2021
2022
2C Contingent Resource: 575 BCFe
2U Prospective Resources: ~48 TCFe
Gas Sales & Transportation: APA Group and Power and Water Corporation MoUs Executed
Established $15 million credit facility with Macquarie Bank to move to project financing
KEY ACTIVITIES TO CARPENTARIA PILOT PROJECT FID
Major 2C Contingent Resource upgrade announced for EP187 to 1,739 PJ
Carpentaria-2H flow rates: normalised IP30 of 10.5 TJ (9.2 mmscf) per day for an equivalent 3,000m horizontal
2023
development well. Carpentaria-3H flow rates: IP30 of 3.8 TJ (3.3 mmscf) per day
Carpentaria-4V: intersected the same stacked Velkerri Formation shales as the Carpentaria Project wells thereby opening
the Carpenaria East Area
1. Front End Engineering & Design (“FEED”): including engineering, economic modelling etc
• Pilot development (up to 25 TJ/d) – over $90m revenue per annum @ $10/GJ
2. Subsurface design planning
3. Execute gas sales and transportation agreements – discussions ongoing with multiple parties
4. Arrange financing for pilot (Macquarie Bank credit facility already in place)
5. Obtain government approvals: NT Petroleum Production Licence over Carpentaria
6. Negotiate Northern Land Council (“NLC”) Production Agreement with Traditional Owners
POST FID
2024
1.
Pilot project construction
2025
1.
2.
First gas sales
Planning to move to full development (200 TJ/d+ to East Coast then >1 PJ / day LNG export via Darwin)
9
ASX:EEG
https://empireenergygroup.net/
Alex Underwood
Managing Director
info@empiregp.net
+612 9251 1846
10
Appendix 1: Empire is Working Sustainably to Develop the Beetaloo
Empire is responsibly developing its Beetaloo gas resources
• Empire’s forecast Greenhouse Gas (“GHG”) emissions have been
independently reviewed based on recent appraisal results, planned field
development assumptions and the National Greenhouse and Energy
Reporting framework1
• Empire’s Scope 1 emissions based on this analysis will include:
- Fuel combustion e.g. gas for power, diesel use
- Fugitive emissions associated with operations (aim to minimise)
• Empire estimates its Scope 1 offsetting obligation is less than 5% of gross
revenue (at $10/GJ gas price) for Carpentaria’s full field economic life at the
Australian Government’s carbon price cap ($75 per tonne indexed at 2%
p.a. plus CPI). This obligation is ~2% of gross revenue at the current Australian
Carbon Credit Unit (“ACCU”) price1
- Empire has commenced engagement with ACCU supply counterparties
• Carpentaria CO2 reservoir levels are extremely low (less than 1%)
• Empire maintains strong relationships with Traditional Owners (“TO”) on whose
land it operates with their full, informed and prior consent
- ~30 on-county meetings held with TOs to date. NLC exploration
payments paid for the benefit of TOs and thousands of hours of
employment for TOs to date
1. Estimates have been independently reviewed by HRL Technology Group Pty Limited (https://www.hrlt.com.au)
11
Appendix 2: Beetaloo Horizontal Well Activity
#
Well Name
Year
Operator
Average
Depth of
Horizontal
(Below
Ground)
Horizontal
Length
Total
Measured
Depth (m)
Drilling Cost
($’M)
Fracture
Stimulation
Stages
Stimulated
Length
Fracture
Stimulation
and Extend
Production
Testing Cost
($’M)
Total Cost
($’M)
1
Amungee-1H
2015/16
Origin Energy
(now TBN)
~2,400m
1,100m
3,808m
11
~750m
2
Tanumbrini-2H
2021/22
Santos
~3,450m
1,000m
4,598m
11
660m
Est. $37 to $40
3
Tanumbrini-3H
2021/22
Santos
~3,3475m
1,000m
4,857m
10
600m
Est. $37 to $40
Carpentaria-2H
2021/22
Empire
~1,620m
1,345m
3,150m
$11.1
21
927m
$13.0
$24.1
Carpentaria-3H
2022/23
Empire
~1,700m
2,632m
4,460m
$10.0
40
1,989m
$17.3
$27.3
Amungee-2H
2022/23
Tamboran
~2,400m
1,275m
3,883m
$14.1
25
1,020m
~$18
Est. $32 to $35
Shenandoah South-1H
2023 Pending
Tamboran
4
Est. ~3,000m Est. ~1,000m
IP
(EPT 1)
IP(57)
1.11mmscf/d
IP(14)
2.0mmscf/d
IP(10)
1.7mmscf/d
IP(30)
2.4mmscf/d
IP(27)
2.6mmscf/d
IP(50)
0.97mmscf/d
IP30
(EPT 2)
CO2
N/A
3 to 4%
2.1mmscf/d
3 to 4%
3.1mmscf/d
3 to 4%
2.8mmscf/d
Sub 1%
3.3mmscf/d
Sub 1%
N/A
3 to 4%
Est. ~500m
Sources:
1. Falcon Oil & Gas (TSXV: FO, AIM: FOG) release entitled:
“Amungee NW-1H – Normalised gas flow rate equivalent to 5 mmscf/d per 1,000m horizontal” dated 3 September 2021
2. Tamboran Resources (ASX: TBN) announcements entitled:
“Operational update: Approximately 17 per cent upward revision to Tanumbirini-2H and 3H flow test results” dated 21 March 2022
“Tanumbirini-2H and 3H 30-day normalised flow rates exceed estimated Beetaloo commerciality threshold” dated 5 September 2022
Total Cost calculated as EP161: Tanumbirini 2H & 3H wells total funds used to date ($18.5m) per Tamboran’s Q1 2023 Quarterly Report multiplied by 4 (TBN holds a 25% interest in these wells)
3. Tamboran Resources (ASX: TBN) announcements entitled:
“Operational update: Approximately 17 per cent upward revision to Tanumbirini-2H and 3H flow test results” dated 21 March 2022
“Tanumbirini-2H and 3H 30-day normalised flow rates exceed estimated Beetaloo commerciality threshold” dated 5 September 2022
Total Cost calculated as EP161: Tanumbirini 2H & 3H wells total funds used to date ($18.5m) per Tamboran’s Q1 2023 Quarterly Report multiplied by 4 (TBN holds a 25% interest in these wells)
4. Releases entitled:
Falcon Oil & Gas, “Amungee NW-2H Well Update” dated 22 June 2023
Falcon Oil & Gas, “Operational Update on Amungee NW-2H Drilling” dated 23 December 2022
Tamboran Resources, “EP98 Operational Update: Successful completion of 25-stage stimulation program at Amungee-2H” dated 22 March 2023
12
Disclaimer
This presentation has been prepared by Empire Energy Group Limited (“Empire” or the “Company”). The information in this presentation is information of a general nature and is subject to
change without notice. The information in this presentation does not purport to be complete, nor does it contain all of the information which would be required in a prospectus prepared in
accordance with the requirements of the Corporations Act 2001 (Cth). It contains information in a summary form only and should be read in conjunction with Empire’s other periodic
disclosure announcements to the ASX available at www.asx.com.au.
An investment in Empire shares is subject to known and unknown risks, many of which are beyond the ability of Empire to control or predict. These risks may include, for example, movements
in oil and gas prices, a failure to acquire some or all of the targeted acreage, risks associated with the development and operation of the acreage, exchange rate fluctuations, an inability to
obtain funding on acceptable terms or at all, loss of key personnel, an inability to obtain appropriate licences, permits and or/or other approvals, inaccuracies in resource estimates, share
market risks and changes in general economic conditions. Such risks may affect actual and future results of Empire and its shares.
This presentation contains statements, opinions, projections, forecasts, and other material (“forward looking statements”). These statements can be identified by the use of words like
‘anticipate’, ‘believe’, ‘intend’, ‘estimate’, ‘expect’, ‘may’, ‘plan’, ‘project’, ‘forecast’, ‘will’, ‘should’, ‘could’, ‘seek’ and other similar expressions. Forward looking statements may be based on
assumptions which may or may not prove to be correct. None of Empire, its respective officers, employees, agents, advisers or any other person named in this presentation makes any
representation as to the accuracy or likelihood of fulfilment of the forward looking statements or any of the assumptions upon which they are based and disclaim any obligation or undertaking
to revise any forward looking statement, whether as a result of new information, future event or otherwise.
Maps and diagrams contained in this presentation are provided to assist with the identification and description of Empire’s lease holdings and Empire’s intended targets and potential
exploration areas within those leases. The maps and diagrams may not be drawn to scale and Empire’s intended targets and exploration areas may change in the future.
All financial information is in Australian dollars unless stated otherwise.
The information contained in this presentation does not take into account the investment objectives, financial situation or particular needs of any recipient and is not financial product advice.
Before making an investment decision, recipients of this presentation should consider their own needs and situation and, if necessary, seek independent professional advice.
To the maximum extent permitted by law, Empire and its respective officers, employees, agents and advisers give no warranty, representation or guarantee as to the accuracy, completeness or
reliability of the information contained in this presentation. Further, none of Empire nor its respective officers, employees, agents or advisers accept, to the extent permitted by law,
responsibility for any loss, claim, damages, costs or expenses arising out of, or in connection with, the information contained in this presentation. Any recipient of this presentation should
independently satisfy themselves as to the accuracy of all information contained herein.
13
Share your feedback
Discover