2025 Annual Report
Released
Released
Announcement PDF
ANNUAL
ANNUAL
REPORT
REPORT
beetalooenergy.com
2025
2025
AND ITS CONTROLLED
ENTITIES
AND ITS CONTROLLED
ENTITIES
ABN 29 002 148 361
Beetaloo Energy Australia Limited and its controlled entities
(Formerly known as Empire Energy Group Limited)
Contents
31 December 2025
1
Corporate directory 2
Chairman and Managing Director letters to shareholders 4
Operations review 7
Directors' report 26
Director's report - remuneration report 37
Auditor's independence declaration 61
Consolidated statement of profit or loss and other comprehensive income 62
Consolidated statement of financial position 64
Consolidated statement of changes in equity 65
Consolidated statement of cash flows 66
Notes to the consolidated financial statements 67
Consolidated entity disclosure statement 108
Directors' declaration 109
Independent auditor's report to the members of Beetaloo Energy Australia Limited 110
Shareholder information 115
Beetaloo Energy Australia Limited and its controlled entities
(Formerly known as Empire Energy Group Limited)
Corporate directory
31 December 2025
2
Directors Peter Cleary (Chairman)
Alexander Underwood (Managing Director)
Louis Rozman
Prof John Warburton
Karen Green
Company Secretary Sally McDow
Sally Greenwood
Notice of Annual General
Meeting
The details of the annual general meeting of Beetaloo Energy Australia
Limited are:
29 May 2026 at 9.30 am
Level 5, 126 Phillip Street, Sydney NSW 2000
Registered office Level 5, 6-10 O'Connell Street
Sydney NSW 2000
Share Registry Computershare Investors Services Pty Limited
Level 3, 60 Carrington Street
Sydney NSW 2000
Auditor Ernst & Young
Level 34
200 George Street
Sydney NSW 2000
Australian Solicitors Baker McKenzie
Level 46, Tower One
International Towers Sydney
100 Barangaroo Avenue
Barangaroo NSW 2000
Ward Keller
Level 7 Northern Territory House
22 Mitchell Street
Darwin NT 0800
US Solicitors Hodgson Russ LLP
140 Pearl Street, Suite 100
Buffalo, NY 14202
Bankers Macquarie Bank Limited
1 Elizabeth Street
Sydney NSW 2000
Australia & New Zealand Banking Group Limited
1 Chifley Plaza
Sydney NSW 200
PNC Bank
249 Fifth Avenue
One PNC Plaza
Pittsburgh PA 15222
Stock exchange listing Beetaloo Energy Australia Limited shares are listed on the Australian
Securities Exchange (ASX code: BTL)
Website www.beetalooenergy.com
Beetaloo Energy Australia Limited and its controlled entities
(Formerly known as Empire Energy Group Limited)
Corporate directory
31 December 2025
3
Corporate Governance
Statement
The directors and management are committed to conducting the business
of Beetaloo Energy Australia Limited in an ethical manner and in
accordance with the highest standards of corporate governance. Beetaloo
Energy Australia Limited has adopted and has substantially complied with
the ASX Corporate Governance Principles and Recommendations (Fourth
Edition) ('Recommendations') to the extent appropriate to the size and
nature of the Group’s operations.
The Corporate Governance Statement, which sets out the corporate
governance practices that were in operation during the financial year and
identifies and explains any Recommendations that have not been followed,
which is approved at the same time as the Annual Report, can be found at:
https://beetalooenergy.com/company/corporate-governance/
Beetaloo Energy Australia Limited
Chair and Managing Director Letter to Shareholders
31 December 2025
Dear Shareholders,
FY2025 was another successful year for Beetaloo Energy Australia Limited as we continued to progress our Beetaloo Basin
properties towards pilot production and, in the success case, future reserves booking.
Put simply, our modern world runs on energy. Australian and global demand for all forms of energy, especially gas, continue to
grow rapidly. Developing Australia’s abundant energy sources is critical for us to continue to enjoy our standards of living.
As Australia grapples with rapidly rising energy prices and increasing energy insecurity, we firmly believe that the Beetaloo Basin
will be a critical provider of affordable, reliable and dispatchable energy for the Northern Territory, Australia and the region for
decades to come. During the year, the Company continued the progression from field appraisal towards pilot production,
culminating in the Board’s Final Investment Decision (FID) for the Carpentaria Pilot Project in December 2025. This milestone was
supported by the strong production test performance of the Carpentaria-5H well, which achieved one of the highest flow rates
recorded in the Beetaloo Basin to date. We are rapidly advancing up the technical shale gas learning curves seen in the United
States of America, and we are carrying out leading edge research and development to unlock this incredible gas resource.
Strategic Basin-Scale Opportunity
Australia’s east coast gas market continues to face tightening supply dynamics, and the regional demand across Asia remains
structurally strong. Policymakers and industry participants increasingly recognise the Northern Territory, and specifically the
Beetaloo Basin, as critical to future domestic energy security.
Beetaloo Energy holds a substantial, strategically located acreage position within this emerging basin. During FY2025, significant
advancements were achieved in respect of both technical feasibility and operational readiness, providing confidence to progress
pilot-scale production, forming a critical first step toward longer-term resource development.
The Carpentaria Pilot Project is designed to supply up to 25 TJ/day to the Northern Territory domestic market under the existing
Gas Sales Agreement. The pilot project is designed to provide operational and shale resource data essential for planning any
potential future development.
Capital Strength and Funding
In May and June 2025, the Company raised $35 million (before costs) through a $28 million institutional placement and a $7
million Share Purchase Plan at 16c per share with a 1:2 option exercisable at 24c per share for 2 years after issue, reflecting
market confidence in the pilot project. Liquidity remained strong throughout the year, supported by the Macquarie Bank facilities.
Following FID, we intend to draw down $30 million under the Macquarie Midstream Infrastructure Facility to fund the Carpentaria
Gas Plant and associated infrastructure.
Technical Validation – Carpentaria-5H
The Carpentaria-5H well set a new technical benchmark for the Basin. In July 2025, hydraulic stimulation was completed across a
2,955-metre horizontal section with 67 fracture stages — this was the longest stimulation in the Beetaloo Basin and the largest
fracture stimulation in Australian history.
Following shut-in and soak after initial clean-up phases, flow testing in December delivered:
Peak flow rate: 11.2 TJ/day
Average flow rate: 7.1 TJ/day
Exit flow rate: 6.3 TJ/day after 46 days
4
Beetaloo Energy Australia Limited
Chair and Managing Director Letter to Shareholders
31 December 2025
These flow rates were achieved during the ‘clean up’ phase, that is, while still dewatering the well. We look forward to reopening
the well once local weather conditions allow, to assess the full deliverability of the well.
Strong early reservoir performance and high permeability materially supported the Board’s pilot project FID decision.
Further clean-up and flow testing from Carpentaria-5H is anticipated to recommence after the wet-season.
Regulatory and Community Engagement
Traditional Owners of the Mambaliya Rrumburriya Wuyaliya Aboriginal Land Trust provided consent at an On Country Meeting in
June 2025 under Section 57AAA (5)(d) of the Petroleum Act 1984 (NT). This was the critical final step for Federal Ministerial
approval and Northern Territory Government ‘Beneficial Use of Test Gas’ approvals in December 2025, providing regulatory
certainty for pilot production and demonstrating the importance of constructive engagement with Traditional Owners and
government stakeholders.
We are committed to developing the Beetaloo Basin in a way that delivers tangible benefits to local communities and the Northern
Territory economy. Throughout FY2025, we engaged closely with Traditional Owners and regional stakeholders to ensure our
operations support local employment, skills development, and business opportunities. We employ traditional owners and local
people and provide significant work for local businesses in this remote region.
The Carpentaria Pilot Project is the next step towards creating long-term economic value for the region while providing a reliable
domestic gas supply that underpins broader energy security. Safety, community engagement, and responsible environmental
stewardship remain central to our operations as we move toward pilot production.
Offsite assembly of the Carpentaria Gas Plant commenced in October 2025. Piling and installation works are progressing, with gas
compressors scheduled for delivery in April 2026.
Execution and Leadership
We welcomed Mr Alexander Hunter as Chief Financial Officer in June 2025. His 20+ years of energy finance experience will
support disciplined project execution and future growth.
We also welcomed Cassandra Schmidt as VP Environment, Compliance and Sustainability. Based in Darwin, Cassandra is a
Northern Territory local and a highly regarded industry professional. Her expertise will be instrumental in further strengthening our
environmental, compliance and sustainability functions as the Company transitions toward pilot production.
Outlook – Delivering the Next Phase of Value
Beetaloo Energy enters FY2026 with:
Further advanced basin specific completion techniques with the execution of the Carpentaria-5H drilling and stimulation
Demonstrated reservoir productivity at Carpentaria-5H
Full regulatory and Traditional Owner approvals for appraisal gas sales
Final Investment Decision secured for the Carpentaria Pilot Project
Midstream Facility funding arrangements in place (subject to conditions precedent)
Construction of the Carpentaria Gas Plant and associated infrastructure underway
Three wells ready to tie into pilot production (Carpentaria-2H, -3H and -5H)
5
Beetaloo Energy Australia Limited
Chair and Managing Director Letter to Shareholders
31 December 2025
Our near-term focus is clear: safe, disciplined, and on-schedule delivery of the Carpentaria Pilot Project and commencement of
pilot gas sales in late 2026.
While we keenly await the commencement of revenue generation from the pilot project, this goal is secondary to our goal of
establishing longer term production performance from these wells than has been possible by flaring gas during testing.
Beyond pilot production, the scale of our acreage and the technical performance demonstrated to date provide a platform for future
expansion. As the Basin continues its journey towards gas production, Beetaloo Energy is positioned to play a significant role in
Australia’s domestic gas supply landscape.
On behalf of the Board, we thank our shareholders for their continued support, our Traditional Owner partners for their
engagement, government stakeholders for their constructive collaboration, and our dedicated employees, contractors and service
providers whose work has made this progress possible.
Yours sincerely,
Peter Cleary
Chairman
Beetaloo Energy Australia Limited
Alex Underwood
Managing Director
Beetaloo Energy Australia Limited
6
Beetaloo Energy is an Australian upstream petroleum company focused on the appraisal and development of large-
scale unconventional shale gas resources in the Northern Territory. Its Beetaloo Basin portfolio spans an area
comparable in size to the core regions of the Marcellus Shale in the Appalachian Basin, positioning the Company to
play a meaningful role in addressing forecast gas supply shortfalls across both the Australian domestic and global
LNG markets.
The Beetaloo Basin represents one of Australia’s most significant energy opportunities – a world-class shale gas
resource in the heart of the Northern Territory, characterised by naturally low CO₂ intensity and substantial long-term
potential.
Australia’s future prosperity depends on energy that is clean, affordable, abundant and reliable – and that future is
being shaped now.
The people of the Northern Territory, together with the Northern Territory Government and industry, share a clear
vision: for the Beetaloo to become a cornerstone of Australia’s energy security and a strategic supplier to our region.
Around the world, nations are experiencing a resurgence in energy strength driven by shale gas development. Now
it’s Australia’s turn.
Beetaloo Energy’s near-term focus is the Carpentaria Pilot Project, which benefits from established road and
pipeline infrastructure and is targeting first appraisal gas in 2026.
At Beetaloo Energy Australia, we are proud to be helping unlock this opportunity responsibly and sustainably –
delivering long-term value for the Northern Territory, our shareholders, our employees and the communities in which
we operate.
7
Hydraulic Stimulation – Carpentaria-5H (“C-5H”)
2,955 metre hydraulic stimulation across 67 stages
10,000 tonnes proppant placed
> 5 stages/day on multiple days
>100 barrels per minute pump rate on multiple days, replicating US-style
frac intensity
Largest Beetaloo Basin stimulation to date
Clean-up up Flow Test Results – C-5H
Peak gas rate: 11.2 TJ/day
30-day average: 7.1 TJ/day
Day-30 exit rate: 6.3 TJ/day
High calorific gas with elevated ethane; CO₂ <1%
At shut-in the well was still cleaning up and the rates are not
representative of unconstrained flow rate potential
The well is to be reopened after the wet season for further flow testing
Resource Position
Beetaloo Basin
o 100% working interest across ~3 million net effective acres
o 2C Contingent Resources: 1.6 TCFe
o 2U Prospective Resources: 35 TCFe
Greater McArthur Basin
o 2U Prospective Resources: 11 TCF
Infrastructure & Commercialisation
First gas: Expected 2026
Carpentaria Gas Plant (CGP):
o 25 TJ/day capacity once commissioned
o Civil works complete
o Refurbishment nearing completion in Roma
o Transport and installation planned to commence in April 2026
Approvals
Traditional Owner consent & NT ministerial approval for appraisal
gas sales
All permits for pilot project and pilot gas sales now in place
Safety & ESG
No reportable environmental or safety incidents during fracture
stimulation and gas plant early works
All activities conducted under approved Environment Management
Plans (EMPs)
2025 AT A GLANCE
8
2025 OVERVIEW & HIGHLIGHTS
Halliburton frac pumps mobilised at Carpentaria-5H
FY2025 marked a pivotal year for Beetaloo Energy, advancing the development of its multi-TCF shale
resource in the Beetaloo Basin, Northern Territory, and laying the foundation for future
commercialisation. The Company holds 100% working interest in approximately 3 million net effective
acres in the Basin, with 1.6 TCFe of 2C Contingent Resources and 35 TCFe of 2U Prospective
Resources, with carbon dioxide content consistently below 1%.
Strategic Advantage
Velkerri Formation: thick high organic content stacked shales
Shale quality comparable to Marcellus Shale (Appalachian Basin) and Permian Basin stacked
plays
Direct link to Northern Territory and East Coast gas markets
With first gas, the Beetaloo Basin will be the first new gas producing onshore basin in Australia in over
20 years. This is the first step in the Beetaloo becoming a major gas producing hub.
OVERVIEW
9
BEETALOO ENERGY’S
STRATEGIC ASSETS
The Beetaloo Basin is one of the world’s largest shale gas deposits with world-class geological characteristics, low CO2 and
proximity to the world’s largest gas demand centres.
Beetaloo Energy’s Beetaloo Basin portfolio comprises two core areas; Carpentaria (EP187) and the Western Beetaloo (EP167 and
EP168). Together these assets represent large and highly strategic positions within one of Australia’s most prospective onshore
gas basins and emerging global shale plays.
The Carpentaria Pilot Project was the Company’s primary operational focus during 2025, with hydraulic stimulation and flow testing
of C-5H and completion of the Carpentaria Gas Plant civil works. In 2026, the Carpentaria Gas Plant is to be commissioned for first
appraisal gas offtake and seismic acquisition is planned in the Western Beetaloo permits as appraisal progresses across that
material resource area.
The broader permit portfolio spans the greater McArthur Basin and provides long-term exploration and development optionality
with multiple shale targets. The maps below illustrate the scale, location and strategic positioning of Beetaloo Energy’s acreage
within the Northern Territory and their access to gas markets. Beetaloo Energy holds one of the largest shale gas acreage
positions globally.
Beetaloo Energy acreage and access to gas markets
10
Timeline of executed Carpentaria drilling and hydraulic stimulation activity
Since commencing on-ground activity in 2019, Beetaloo Energy has taken a measured and
methodical approach to appraising the stacked shales of the Velkerri Formation in EP187 through
seismic acquisition, drilling, and state of the art testing programs.
The vertical Carpentaria-1 (“C-1”) well confirmed both the presence and productivity of the shales of
the Velkerri Formation, establishing the foundation for further appraisal. A four-stage hydraulic
stimulation and testing program returned gas to surface from all four Velkerri Formation shale target
zones. Subsequent vertical wells, including Carpentaria -2 (“C-2”) and Carpentaria-4V (“C-4V”), have
demonstrated the lateral continuity and consistency of the shale intervals across the permit, as well
as generating significant technical knowledge regarding the drilling and stimulation processes
applicable to the region.
Building on these results, the drilling and hydraulic stimulation of horizontal wells Carpentaria-2H
(“C-2H”), Carpentaria-3H (“C-3H”), and C-5H has further validated shale productivity and provided
critical insights into reservoir characteristics, key to refining the drilling and stimulation process
design. Through successive increases in horizontal well length and hydraulic stimulation pumped
volumes, Beetaloo Energy has progressively refined and advanced basin-specific completion
techniques, creating a prototype for large-scale shales that are characteristic of the region has
resulted in several technical milestones in the Australian unconventional gas sector and ongoing
applied R&D will be instrumental for future production optimisation and commercialisation of the
region.
CARPENTARIA WORKS TO DATE
11
Carpentaria Project B-Shale Depth Below Ground
12
Hydraulic stimulation of the C-5H well was the operational focus in FY2025 and demonstrated Beetaloo Energy’s capability to
design and execute basin-leading shale completions at scale. The C‑5H hydraulic stimulation was undertaken systematically to
build upon operational and design enhancements developed during previous campaigns, while generating new technical
knowledge that is critical to advance the project and progress towards commercialisation of the region.
C-5H was drilled in November–December 2024 to a total measured depth of 5,310 metres, incorporating a 3,310-metre horizontal
section positioned within the target B Shale of the Velkerri Formation. The well targeted the same stratigraphic interval and was
drilled from the same well pad as C-2H and C-3H, enabling appraisal and operational efficiencies.
The July 2025 stimulation campaign delivered the most extensive fracture stimulation undertaken in the Beetaloo Basin to date,
with 2,955 metres stimulated across 67 stages using a fully slickwater design and approximately 10,000 tonnes of proppant
placed. The program was executed over a 20-day continuous campaign and applied a design and scale rivalling leading US shale
basins.
Operational performance reflected scalable and repeatable execution capability. Pump rates exceeded 100 barrels per minute on
multiple stages, with sustained 24-hour operations achieving more than five stages per day on several occasions. The campaign
was completed safely, on schedule and in line with design objectives.
C-5H incorporated several material enhancements relative to earlier wells on the pad, including a larger production casing, longer
stimulated lateral, higher pump rates, and increased proppant and fluid intensities. These design changes were undertaken and
tested systematically to assess the applicability of North American scale completion design elements in the Australian context, in
conjunction with technical learnings from earlier applied R&D undertaken by Beetaloo Energy. The operational and technical
capability, as well as productivity outcomes demonstrated through execution of C5-H has provided a solid foundation to progress
the Carpentaria Pilot Project. Once online, activities undertaken as part of the Carpentaria Pilot Project will provide critical data for
ongoing completion design.
The successful execution of C‑5H demonstrates advanced technical and operational readiness for large‑scale development of the
Velkerri Formation shales and represents a step‑change in the Company’s progression toward commercial production.
Carpentatria-5H key completion enhancements
CARPENTARIA-5H HYDRAULIC STIMULATION
13
Carpentatria-5H produced gas chromatography
STRONG FLOW TEST RESULTS
AND RESOURCE VALIDATION
Beetaloo Energy applied a technically disciplined flowback strategy at C-5H, designed to preserve fracture conductivity, manage
drawdown and maximise long-term well productivity.
Clean-up flow testing conducted during November and December 2025 delivered strong and stable performance, with low decline
observed across the test period. Key outcomes from the 30-day clean-up test included:
Peak gas rate: 11.2 TJ/day
30-day average gas rate: 7.1 TJ/day
Day-30 exit rate: 6.3 TJ/day, reflecting a low decline profile through the test
These results further reinforce confidence in the scale and quality of the unconventional gas resources. Independent resources
assessor Netherland, Sewell & Associates has estimated recoverable gas of approximately 10 PJ per well location in the
Carpentaria-5H area, supporting potential full-scale development subject to ongoing development of completion techniques.
Compositional analysis of produced gas during the flow test confirmed high energy content, driven by elevated ethane levels that
are well above the Beetaloo Basin average. This higher heating value translates into materially improved revenue per unit volume
of gas sold. Underscoring the high quality of the gas resource, carbon dioxide content measured at C-5H and prior Carpentaria
wells is below 1%.
With strong recoveries per well, high-energy gas, above-average reservoir thickness, multiple high-quality stacked shale intervals
and relatively shallow reservoir depth compared to other parts of the basin meaning lower well costs, the Carpentaria Project area
is shaping as a potential sweet spot.
14
INFRASTRUCTURE PROGRESS
Beetaloo Energy achieved several critical milestones to progress the Carpentaria Pilot Project. Consent from Traditional
Owners and ministerial approval from the Northern Territory Government were secured to enable the sale of appraisal gas. All
required permits to commence the sale of appraisal gas are now in place.
From October 2025, the Company advanced site works for the CGP. Civil works at the plant site were completed by
NT-based contractor Top End Civil, allowing focus to shift to plant installation and commissioning activities. These
developments position Beetaloo Energy to commence pilot operations and supply appraisal gas into the Northern Territory
market in 2026.
Civil works for the Carpentaria Gas Plant are complete
The CGP, currently located in Roma, Queensland is undergoing refurbishment and is scheduled to be transported to the
Carpentaria site in April 2026. The facility will supply up to 25 TJ per day under Beetaloo Energy’s gas sale agreement with
the Northern Territory Governmnet. The CGP will initally comprise an inlet slug catcher, suction fuel separator, two gas
compression packages, a discharge scrubber, a gas dehydration unit and a metering skid.
The three existing horizontal wells— C-2H, C-3H and C-5H—will be tied into the gas plant to supply feed gas for the initial
production phase.
Upon commissioning later in 2026, the CGP will provide a direct link between Beetaloo Energy’s shale gas resource and
the Northern Territory and East Coast gas markets, marking a key step in the pursuit of full Beetaloo Basin development.
15
WESTERN BEETALOO
Beetaloo Energy secured the Western Beetaloo permits in 2021 and received Environment Management Plan approval for
exploration and appraisal in 2024. In 2026, the Company intends to commence appraisal activity across the 27 TCFe resource.
The region benefits from proximity to a major gas pipeline, highway, and rail corridor. Consistent with the Carpentaria Project,
the Western Beetaloo permits contain a basin‑leading, thick succession of stacked Velkerri Formation shales. Previous seismic
and drilling campaigns have materially de-risked the area. Future appraisal activity will focus on productivity of the shales and
the continued R&D of hydraulic stimulation techniques established at Carpentaria.
Planning is underway for a multi-year seismic, drilling, and stimulation program across more than one million acres, beginning
with the acquisition of approximately 250 km of 2D seismic data to optimise horizontal well placement.
Western Beetaloo with planned seismic lines and well pad corridor options
16
RESOURCE COMPARISON TO
US SHALE
Beetaloo Energy’s footprint is comparable in size to Marcellus Shale core areas
Shale and tight formations account for ~ 80% of the ~110 BCF/day of dry natural gas produced in the United States,
highlighting the economic significance of this resource type . 1 The Marcellus Shale, within the Appalachian Basin, is the
most productive US shale play, producing ~26 BCF/day. Like the Velkerri Formation, the Marcellus Shale was deposited
in an organic-rich marine environment, providing high gas-in-place and shale characteristics for hydraulic stimulation.
1 United States Energy Information Administration (eia.gov), February 2026 data.
Beetaloo Energy’s Four Stacked Velkerri Shales compared to the southwest Mercellus Shale
Key reservoir properties—organic content, gas-in-place, and depth—show that the Velkerri Formation compares favourably with
the Marcellus Shale. The Velkerri Formation also features stacked shale intervals, analogous to the Permian Basin, where
multi-target, multi-well pad development enhances economics and operational efficiency. These characteristics position the
Beetaloo Basin as a high-potential, commercially attractive shale gas province.
18
HEALTH, SAFETY AND
ENVIRONMENT
Health, safety and environmental management remained a core focus for Beetaloo Energy
throughout FY2025. The hydraulic stimulation campaign at C-5H, subsequent flowback
operations, and early works for the Carpentaria Gas Plant were all executed without
reportable environmental or safety incidents. Operations were conducted under approved
Environment Management Plans and regulatory requirements, with ongoing monitoring,
auditing, and risk management embedded across all field activities.
The Company remains committed to continuous improvement in safety and environmental
performance as activity levels increase, ensuring the protection of our workforce,
stakeholders, and the environment as the Carpentaria Project progresses toward first gas.
Bird’s-eye view of the hydraulic stimulation at Carpentari-5H site
Major projects have been planned and completed without any reportable safety incidents
19
2025 WRAP UP
FY2025 has been a transformative year for Beetaloo Energy, moving the Company through appraisal towards the threshold of
pilot gas sales to the Northern Territory market. The record-scale stimulation execution at C-5H, combined with strong flow test
results and high-quality gas, has validated the productivity and economic potential of the Velkerri shale.
The completion of key approvals, and civil works for the CGP provides a clear path to first gas in 2026, while appraisal in the
Western Beetaloo positions the Company for multi-decade development of its expansive resource base.
These achievements underscore Beetaloo Energy’s growing operational capability, technical expertise, and strategic focus on
unlocking one of the world’s most significant onshore gas resources. With strong shareholder support, stakeholder engagement,
and a proven track record Beetaloo Energy is well placed to deliver long-term energy security and economic value for the
Northern Territory and Australia.
Top Left: On-Country meeting where Traditional Owners consented to the sale of appraisal gas
Top Right: Frac sand pit and Halliburton frac pump at Carpentaria-5H
Bottom Left: 2025 site visit to Carpentaria-5H
Bottom Right: Milestone moment for the company where the NT Government approved Beetaloo Energy’s Beneficial Use of Gas application
for the sale of appraisal gas from EP187.
20
CREDIT FACILITIES
The Company has a $65 million credit facility with Macquarie Bank Limited (“Macquarie”) to support its activities in the Northern
Territory. The outstanding balance of the credit facility as at 31 December 2025 is $28.1 million (made up of $25.4 million of the
R&D Facility and $2.7 million of the Performance Bond facility). Facility C has not yet been drawn down.
Key terms of this credit facility are set out below:
Principal Amount $65 Million compromising:
Facility A (Revolving Credit Facility, $30.0 million)
Facility B (Performance Bond Facility, $5 million)
Facility C (Midstream Infrastructure Facility, $30 million)
Borrowers Imperial Oil & Gas Pty Limited
Imperial Oil & Gas A Pty Limited
Guarantor Beetaloo Energy Australia Limited
Imperial Oil &Gas Pty Limited and
Imperial Oil & Gas A Pty Limited
Sec
Share your feedback
Discover