Quarterly Activities Report
Released
Released
Announcement PDF
ASX: EEG
Q1 2024 QUARTERLY REPORT
30 APRIL 2024
•
Empire’s focus during the Quarter was progressing towards a final investment
decision for the Carpentaria Pilot Project and planning for the $46.8 million capital
raise described below
•
Empire anticipates commencement of commercial production and gas sales in 2025
•
Planning for the Carpentaria-5H (“C-5H”) pilot development well, to be drilled in this
work season subject to Northern Territory approvals, is well advanced. C-5H will be
the first 3,000m horizontal section drilled by Empire and potentially the first in the
Beetaloo
•
After Quarter-end, Empire announced it had completed a $46.8 million capital raise
cornerstoned by Bryan Sheffield and Liberty Energy Inc (NYSE: LBRT). Commenting
on the capital raise, Chief Minister of the Northern Territory, Hon Eva Lawler said:
“Today’s announcement by Empire is fantastic news for jobs, fantastic news for our
economy and fantastic news for the future of the Territory”
•
Also after Quarter-end, Empire completed the sale of its USA assets for up to
US$9.1 million in cash. Empire has fully repaid its US credit facility with part of the
proceeds of the sale
•
Cash at the end of the Quarter was $12.0 million. At the time of this announcement
total available cash at bank is ~$49 million excluding Tranche 2 of the capital raise
($8.1 million before transaction costs) which is subject to shareholder approval
Comments from Managing Director Alex Underwood:
"The Empire team had a busy and productive Quarter focused on bringing EP187 in the Beetaloo
Basin into production next year.
We announced the sale of our US production assets after Quarter end for up to US$9.1 million. This
has allowed us to extinguish all remaining US debt and free up capital to focus on our Beetaloo
assets. The sale brings to a successful conclusion Empire’s strategic shift to focus on unlocking the
latent value in our Beetaloo / McArthur Basin asset portfolio.
Shortly after the sale of the US assets, Empire announced that it had completed a $46.8 million
capital raise strongly supported by existing and new institutional and sophisticated investors.
Proceeds of the raise will be applied to the drilling, stimulation and flow testing of our first 3,000m
horizontal section pilot development well, and to progress surface facility design and installation in
EP187.
We are progressing gas sales negotiations, the majority of the required regulatory applications have
been submitted, and long-lead items are now being procured.
One of our major shareholders recently expressed to me his view that “the play is about to take off”.
This is a view I share. With our capital position now the strongest it has ever been, the Empire team’s
focus in coming months will be to bring this goal to fruition.”
EMPIRE ENERGY GROUP LTD
ABN 29 002 148 361
Level 5, 6-10 O’Connell Street Sydney NSW 2000
T: +61 2 9251 1846
F: +61 2 9251 0244
E: info@empiregp.net
Northern Territory Operations Update
Carpentaria Pilot Project Update
Empire Energy Group Limited (“Empire” or the “Company”) is rapidly advancing toward final investment
decision (“FID”) for the Carpentaria Pilot Project in EP187. Arrangement of financing, securing gas
sales and transportation agreements, finalization of FEED (Front End Engineering and Design) and
regulatory approvals are all progressing according to schedule.
During the Quarter, Empire continued stakeholder engagement for the Carpentaria Pilot Project.
Empire has built strong relationships with stakeholders since 2012, when it first acquired EP187,
through regular on country meetings with the Traditional Owners upon whose land we work and
continued open and informed dialogue with local communities, pastoralists and affected stakeholders.
An Environment Management Plan (“EMP”) for the Carpentaria Pilot Project was submitted during the
Quarter and is being assessed by the Northern Territory Government. A public consultation period
extended for 30 days until 19 April 2024. Empire anticipates approval of the EMP during the current
Quarter.
Following approval of the EMP, Empire will have the relevant NT Government approvals to:
•
Upstream: drill, hydraulically stimulate and flow test up to ten new horizontal wells along with
the construction of up to 4 new well pads; and
•
Midstream: construct a gas processing facility, including the installation of the Empire’s recently
purchased 42 TJ / day Rosalind Park Gas Plant (“Carpentaria Pilot Plant”) and gas and water
gathering system from the wells to the Carpentaria Pilot Plant and tie-in of midstream
infrastructure to the McArthur River Gas Pipeline for gas sales.
Subject to FID for the Carpentaria Pilot Project, during H2 2024 Empire is planning to:
2
•
Drill and fracture stimulate one new horizontal development well (~3km lateral, ~60 stages)
(“Carpentaria-5H”). The target interval will be the same B Shale of the Velkerri Formation as the
drilled Carpentaria-2H (“C-2H”) and Carpentaria-3H (“C-3H”) wells;
•
Complete civil works and construction of the Carpentaria Pilot Plant and associated infield gas
infrastructure including gas gathering, water handling, camp; and
•
Tie-in Carpentaria-5H (“C-5H”), C-2H and C-3H to midstream infrastructure and the McArthur
River Gas Pipeline for gas sales. Power Water Corporation, the owner of the McArthur River
Gas Pipeline has advised Empire that it will insert a “t-piece” connection into the pipeline at the
Carpentaria Pilot Project location during May 2024 to allow Empire to access the line for gas
sales.
www.empireenergygroup.net
Empire is progressing planning for C-5H, confirming vendors and has commenced long lead
procurement. Implementation of industry leading techniques has been demonstrated across the
Beetaloo, maturing the basin from concept of long stimulated horizontal wells to execution. Going
forward drilling, hydraulic stimulation and flowback techniques will have a combined focus on
maximising productivity and well recovery. To that end, Empire will move away from trialing multiple
stimulation techniques and fluid types to the utilisation of one approach across each well, incorporating
5 ½” casing and likely slickwater stimulation (subject to further stimulation design work which is
ongoing).
Schematic map of the Carpentaria Pilot Project, 2024 activities
3
www.empireenergygroup.net
Capital Raise
On 17 April 2024, Empire announced it had completed a $46.8 million capital raise cornerstoned by
Bryan Sheffield and Liberty Energy Inc (NYSE: LBRT). The capital raise was comprised of two parts:
•
Strongly supported two-tranche placement to existing and new institutional and sophisticated
investors to raise $39.0 million (before costs). Bryan Sheffield and Liberty Energy Inc (“Liberty
Energy”) demonstrated their support for Empire with each investing ~$7.7 million in the
placement; and
•
Daly Waters, a subsidiary of Formentera Partners (a US based private equity firm founded by
Bryan Sheffield) and Liberty Energy each independently acquired a 2.25% royalty interest in
EP187 for US$2.5 million (~$3.9 million) raising an additional US$5 million.
Empire Directors continued to demonstrate their continuing support for Empire by committing to invest
an additional $325,000 (subject to shareholder approval).
Following completion of the capital raise Empire will be funded to drill a 3km fracture stimulated
horizontal pilot development well in EP187 and to further progress engineering and preparation for
installation of Carpentaria Pilot Project surface facilities. Empire anticipates commencement of
commercial production and gas sales in 2025.
Following Empire’s announcement of the successful capital raise, the Northern Territory Government
released a media statement entitled “Economic Confidence in the Beetaloo Basin Grows” dated 17
April 2024 reiterating the Northern Territory Government’s support for Empire and the development of
the Beetaloo Sub-basin. The following quotes were contained in the Government’s media release:
Chief Minister of the Northern Territory, Hon Eva Lawler:
“Today’s announcement by Empire is fantastic news for jobs, fantastic news for our economy and
fantastic news for the future of the Territory.
“I am focused on getting Territorians working and as we continue to grow this critical sector, more and
more opportunities become available for Territorians to secure stable employment.
“The Northern Territory will be at the forefront of natural gas production, and we will be the jurisdiction
to deliver cheaper, cleaner and more reliable energy to the rest of Australia."
Minister for Mining, Hon Mark Monaghan:
“The Territory Labor Government’s focus is to grow our economy, create working opportunities for
Territorians and transition to a cleaner future, and this announcement by Empire Energy provides great
confidence in all three.
“Only last week the Lawler Government announced funding to implement the regional monitoring
program in the Sub-Beetaloo Basin, ensuring all progress made is underpinned by strong
environmental safeguards.”
Empire appreciates the NT Government’s support for our industry and is focused on developing our
assets in a manner that will maximise the benefits for all Northern Territorians and provide long-term
economic and energy security for the Northern Territory, Australia and the broader Australian region.
4
www.empireenergygroup.net
Other Corporate News
Sale of US Assets
On 12 April 2024, Empire completed the sale of Empire Energy E&P LLC (“Empire E&P”) to PPP
Future Development, Inc (“PPP”) for up to US$9.1 million. Empire E&P is the operating entity for all of
Empire’s US oil & gas assets. PPP is a privately owned, existing producer of oil & gas in New York
State.
The total sale proceeds, payable in cash, are comprised of:
•
Upfront Cash Payment: US$5.9 million (received by Empire);
•
Contingent Deferred Payments: Up to US$2.3 million depending on future gas prices; and
•
Deferred Solar Payments: US$0.9 million, relating to the South Ripley Solar Project.
Following the sale, Empire has repaid the US Macquarie Bank credit facility in full (US$4.4 million) and
is in the process of settling sale costs (~US$1.9 million), resulting in ~US$2.2 million being immediately
available to support the development of Empire’s Beetaloo Basin assets. In addition, Empire has
retained a 3.75% carried working interest over shale formations with negligible holding costs which
provides option value to Empire’s shareholders in future development scenarios.
Empire Tenements
There were no changes to the petroleum tenements held by Empire and its subsidiaries during the
Quarter.
A full list of tenements as at 28 March 2024 can be found on the Empire website:
https://app.sharelinktechnologies.com/announcement/asx/b7cbffae643848735210c692a87786aa
After Quarter-end, Empire divested its US oil & gas leases to PPP. Empire has retained a 3.75%
carried working interest in all formations below the base of the Medina Sandstone formations. Empire
has not produced oil & gas from these formations to date. Per ASX Listing Rule 5.4.3, Empire has
included a schedule of its oil & gas leases at Appendix A.
5
www.empireenergygroup.net
Community Engagement
In March, Empire Energy and Australian Energy Producers hosted an exhibition booth at the 40th Annual NT
Cattleman’s Association Conference promoting ongoing positive relationships between our industries.
LtoR: Mr Steven Edgington, MLA (Shadow Minister for Mining and Industry), Hon Mark Monaghan, MLA
(Minister for Mining and Industry), Sonia Harvey (Empire) and Mr William Yan, MLA (Shadow Treasurer).
6
www.empireenergygroup.net
NT Petroleum Sector Update
• 23 April 2024: Tamboran Resources (ASX: TBN) announced that it and the Beetaloo Joint
Venture had signed a binding Gas Sales Agreement to supply the Northern Territory
Government with 40 TJ / day from the proposed Shenandoah South Pilot Project for an
initial term of nine years, starting H1 2026. Gas will be delivered to the Amadeus Gas Pipeline
on a take or pay basis at a market competitive price, escalating at 100% of the Consumer Price
Index.1
• 25 March 2024: Falcon Oil & Gas (TSXV: FO, AIM: FOG) announced it had elected to
reduce its working interest in the proposed Shenandoah South Pilot Project (“Pilot”) from
22.5% to 5%. This optimizes Falcon’s interest in the Beetaloo, since Falcon will only have to pay
for 5% of the costs of the two wells to be drilled in 2024 as part of the Pilot but will still retain a
10% working interest in the enlarged area of circa 72,000 acres around the Pilot. 2
• 15 March 2024: Central Petroleum (ASX: CTP) announced that it had been advised that the
Northern Gas Pipeline that connects Northern Territory gas to the east coast is expected
to be closed until at least June 2024.3 The Blacktip Gas Field continues to produce ~15 TJ/d 4
which remains substantially below the contracted volumes of the Gas Sales Agreement between
Eni and Power and Water Corporation (“PWC”) (NT Government owned utility) for the sale of up
to 860 PJ of Blacktip gas to PWC over a 25-year period from 2009, representing a maximum
daily rate of 104 TJ/d 5. This means that scarce available gas needs to be retained in the Northern
Territory.
• 26 February 2024: Tamboran Resources (ASX: TBN) announced that the Shenandoah
South 1H well in EP117 achieved an average 30-day initial production (IP30) flow rate of 3.2
MMcf/d over its 1,644 foot, 10 stage stimulated length within the Mid Velkerri B Shale,
normalized to 6.4 MMcf/d over 3,281 feet (1,000 metres). Tamboran has stated that it intends
to progress development plans for its proposed 40 MMcf/d Pilot Project in the Shenandoah South
location. Tamboran has stated that drilling is planned to commence in Q2 2024. 6
• 14 February 2024: New Zealand Oil & Gas (ASX: NZO) announced that Macquarie Mereenie
Pty Limited had agreed to sell its entire 50% interest in the Mereenie Gas Field, onshore
Amadeus Basin, Northern Territory. In addition to the 25% acquired by New Zealand Oil &
Gas, Horizon Oil (ASX: HZN) will acquire the remaining 25%. New Zealand Oil & Gas will make
an upfront payment of $42.5 million for Mereenie (50%: $95 million), plus further contingent
payments of $9 million over the next 24 months subject to certain conditions being met. 7
1
Tamboran Resources release entitled “Tamboran signs binding GSA with the Northern Territory Government to supply
40 TJ per day for ~15 years from the proposed Shenandoah South Pilot Project” dated 23 April 2024
2
Falcon Oil & Gas release entitled “Falcon Optimises its Interest in the Beetaloo” dated 25 March 2024
3
Central Petroleum ASX release entitled “Northern Gas Pipeline Update” dated 15 March 2024
4
https://www.aemo.com.au/energy-systems/gas/gas-bulletin-board-gbb/data-gbb/data-dashboard
5
https://parliament.nt.gov.au/__data/assets/pdf_file/0008/973160/WqstsA-21.pdf
6
Tamboran Resources ASX release entitled “SS-1H achieves commercial IP30 flow rate of 3.2 MMcf/d (normalized to 6.4
MMcf/d over 1,000 metres), exceeding pre-drill expectation” dated 26 February 2024
7
New Zealand Oil & Gas ASX release entitled “New Zealand Oil & Gas Buys More of the Mereenie Gas Field” dated 14
February 2024
7
www.empireenergygroup.net
USA Operations Update
Empire’s USA operations reported a negative EBITDA for Q1 2024 of US$(268)k (Q4 2023: positive
US$161k). The reported EBITDA reflects lower prevailing Henry Hub gas prices throughout the
Quarter. The average weighted sales gas price for Q1 2024 was US$1.85 Mcfe (Q4 2023: US$2.45
Mcfe).
The average daily production for Q1 2024 was 4,196 Mcfe / day vs. Q1 2023 3,461 Mcfe / day,
representing an increase of 21.4% year-on-year.
Empire completed the sale of its US assets to PPP on Friday, 12 April 2024 as such Empire will no
longer report the financial performance of the US oil & gas assets in future Quarterly Reports.
3 months to
3 months to
YTD
YTD
31 Mar 2024
31 Mar 2023
2024
2023
171
475
171
475
Net Natural Gas Production (Mcf)
380,833
308,691
380,833
308,691
Net Gas Equivalent (Mcf):
Mcfe/d
381,859
4,196
311,541
3,461
381,859
4,196
311,541
3,461
Weighted Avg Sales Price (US$/Mcfe)
Before Hedge
After Hedge
1.85
1.85
4.16
4.22
1.85
1.85
4.16
4.22
Lifting Costs (incl. taxes):
Total Natural Gas Equivalent (US$/Mcfe)
2.52
1.70
2.52
1.70
Description
Net Oil Production (Bbls)
Balance Sheet & Liquidity
Empire’s cash balance as at 31 March 2024, was $12.0 million, of which $7.4 million was held in
Australian dollars, and US$3.1 million was held in United States dollars.
Empire’s total available liquidity as at 31 December 2024, was $12.4 million, comprising total cash of
$12.0 million and $0.4 million undrawn under Facility A (Revolving Credit Facility) with Macquarie
Bank. The $5.0 million Facility B (Performance Bond Facility) also with Macquarie Bank which is
available to meet Northern Territory environmental bonding obligations was drawn to $4,397,896 at
Quarter-end.
During the Quarter, Empire made a debt repayment of US$137,500 to the US Macquarie Bank
Credit Facility secured against the Company’s US gas production assets. The total outstanding
balance under the US credit facility at Quarter-end was US$4,612,510. After Quarter-end, Empire
fully repaid the US credit facility, following completion of the sale of Empire’s US assets.
Empire’s US production was unhedged as at 31 March 2024.
8
www.empireenergygroup.net
Payments to Related Parties of the Company and their Associates:
Item 6.1: Appendix 5B description of payments to related parties of the Company:
Director Fees
Managing Director and Related Parties8 Remuneration
Total (Item 6.1)
$27,200
$227,006
$254,206
Liquidity
Quarter Ended
Cash (A$)
Debt (A$)9
Net Cash /(Debt)10
31 Mar 2024
$12,028,913
$(8,888,405)
$3,140,508
31 Dec 2023
$17,309,597
$(8,771,459)
$8,538,138
30 Sep 2023
$15,043,386
$(15,068,148)
$(24,762)
30 Jun 2023
$23,329,677
$(15,079,200)
$8,250,477
At Quarter-end, Empire’s Tranche B (Performance Bond Facility) with Macquarie Bank which is
available to meet Northern Territory environmental bonding obligations was drawn to $4,397,896.
Production and Development Expenditure (ASX Listing Rule 5.2.1)
Asset
New York and Pennsylvania
Nature of Expenditure
Amount
Production costs (infield operations, gas processing,
and transportation)
Production costs (wages, consultants, and other
overheads)
Other production costs
Total
$586,937
$287,717
$25,324
$899,978
Empire did not incur production and development expenditure on its other assets during the Quarter.
8
Managing Director remuneration for the Quarter includes the payment of his annual short-term incentive based on the
Board’s assessment of his FY23 performance against Key Performance Indicators. In addition, the Managing Director's
spouse, Melissa Underwood earns consulting fees under an arm’s length contract approved by the Audit and Risk
Committee of the Board
9
Debt is comprised of US$4,612,510 owing under the USA Senior Secured Facility and A$1,827,000 owing under Facility A
(Revolving Credit Facility) with Macquarie Bank Limited
10
Net Cash / (Debt) is defined as AUD equivalent cash minus AUD debt for the purposes of this calculation
9
www.empireenergygroup.net
Exploration Expenditure (ASX Listing Rule 5.2.2)
Asset
Capitalised
EP187
Total Capitalised
Expensed
EP187
EP167 and EP168
(Western Beetaloo)
Nature of Expenditure
Amount
C-2H & C-3H Extended Production Testing
$69,590
$69,590
Environmental, compliance and cultural monitoring
Carpentaria Pilot Project - FEED
Consulting and advisory expenses
Other expenses
$257,442
$857,064
$627,024
$148,766
Annual licensing fees (NLC and NT Government)
Compliance
$373,176
$1,293
$2,264,765
Total Expensed
Empire did not incur exploration expenditure on its other assets during the Quarter.
Empire Energy sponsored icebreaker drinks at the 2024 AGES
conference held in April.
LtoR: Dr Alex Bruce, Chief
Geoscientist (Empire) with Dr Ian
Scrimgeour, Senior Executive
Director (Northern Territory
Geological Survey).
This ASX release has been authorised by the Board of Directors
For queries about this release, please contact:
Alex Underwood, Managing Director
Ph: (02) 9251 1846
10
www.empireenergygroup.net
About Empire Energy
Empire Energy holds 28.9 million acres of highly prospective exploration tenements in the McArthur
Basin and Beetaloo Sub-basins, Northern Territory. Work undertaken by the Company since 2010
demonstrates that the Eastern depositional Trough of the McArthur Basin, of which the Company
holds around 80%, has enormous conventional and unconventional hydrocarbon potential. The
Beetaloo Sub-basin, in which Empire holds a substantial position, has world-class hydrocarbon
volumes in place and a ramp up in industry activity to appraise substantial discoveries already made
by major Australian oil and gas operators is ongoing.
Carpentaria 2H site
Registered Office
Level 5, 6-10 O’Connell Street
Sydney NSW 2000
Empire Energy Group Limited
ABN 29 002 148 361
Phone: +61 2 9251 1846
Facsimile: +61 4 9251 1022
Website: empireenergygroup.net
Securities Exchange
ASX: EEG
Media and Investor Enquiries
Nick Kell
Phone: +61 2 9251 1846
Share Registry
Computershare Investor Services
Phone: 1300 850 505
11
www.empireenergygroup.net
APPENDIX A
MARCH 2024
OIL & GAS LEASES (ASX LISTING RULE 5.4.3)
Imperial Oil & Gas Pty Limited
Working
Current Area Area Units SqKm Applied Date Grant Date Expiry Date
Interest
Lease
Holder
Status
EP180
Imperial Oil & Gas
Application
100%
199
blocks
14810
12/04/10
N/A
N/A
EP181
Imperial Oil & Gas
Application
100%
182
blocks
14423
12/04/10
N/A
N/A
EP182
Imperial Oil & Gas
Application
100%
174
blocks
12502
12/04/10*
N/A
N/A
EP183
Imperial Oil & Gas
Application
100%
22
blocks
857
12/04/10
N/A
N/A
EP184
Imperial Oi & Gas
Granted
100%
173
blocks
11170
12/04/10
21/08/13
20/08/25
EP187
Imperial Oil & Gas
Granted
100%
52
blocks
2988
12/04/10
20/03/15
02/11/27
EP188
Imperial Oil & Gas
Application
100%
27
blocks
1448
12/04/10
N/A
N/A
EP319
Imperial Oil & Gas
Application
100%
4
blocks
88
12/04/10
N/A
N/A
EP320
Imperial Oil & Gas
Application
100%
2
blocks
4
12/04/10
N/A
N/A
EP321
Imperial Oil & Gas
Application
100%
4
blocks
7
12/04/10
N/A
N/A
EP322
Imperial Oil & Gas
Application
100%
1
blocks
10
12/04/10
N/A
N/A
EP323
Imperial Oil & Gas
Application
100%
8
blocks
287
12/04/10
N/A
N/A
EP324
Imperial Oil & Gas
Application
100%
1
blocks
4
12/04/10
N/A
N/A
EP325
Imperial Oil & Gas
Application
100%
4
blocks
31
12/04/10
N/A
N/A
EP326
Imperial Oil & Gas
Application
100%
2
blocks
23
12/04/10
N/A
N/A
EP327
Imperial Oil & Gas
Application
100%
2
blocks
6
12/04/10
N/A
N/A
EP328
Imperial Oil & Gas
Application
100%
1
blocks
5
12/04/10
N/A
N/A
EP329
Imperial Oil & Gas
Application
100%
1
blocks
15
12/04/10
N/A
N/A
EP330
Imperial Oil & Gas
Application
100%
1
blocks
7
12/04/10
N/A
N/A
EP331
Imperial Oil & Gas
Application
100%
1
blocks
8
12/04/10
N/A
N/A
EP332
Imperial Oil & Gas
Application
100%
2
blocks
5
12/04/10
N/A
N/A
EP333
Imperial Oil & Gas
Application
100%
1
blocks
7
12/04/10
N/A
N/A
EP334
Imperial Oil & Gas
Application
100%
4
blocks
66
12/04/10
N/A
N/A
EP335
Imperial Oil & Gas
Application
100%
4
blocks
6
12/04/10
N/A
N/A
EP336
Imperial Oil & Gas
Application
100%
2
blocks
24
12/04/10
N/A
N/A
EP337
Imperial Oil & Gas
Application
100%
2
blocks
12
12/04/10
N/A
N/A
EP338
Imperial Oil & Gas
Application
100%
2
blocks
3
12/04/10
N/A
N/A
EP339
Imperial Oil & Gas
Application
100%
2
blocks
2
12/04/10
N/A
N/A
EP340
Imperial Oil & Gas
Application
100%
4
blocks
4
12/04/10
N/A
N/A
EP341
Imperial Oil & Gas
Application
100%
2
blocks
25
12/04/10
N/A
N/A
EP342
Imperial Oil & Gas
Application
100%
5
blocks
29
12/04/10
N/A
N/A
*Revised application 7/05/20
Imperial Oil & Gas A Pty Limited
Lease
Holder
Status
Working
Interest
Current
Area
Area
Units
SqKm
Applied
Date
Grant Date
Expiry Date
EP167
Imperial Oil and Gas A
Granted
100%
131
blocks
10617
N/A
10/01/13
9/01/25
EP168
Imperial Oil and Gas A
Granted
100%
200
blocks
15852
N/A
10/01/13
9/01/25
EP169
Imperial Oil and Gas A
Granted
100%
200
blocks
16013
N/A
04/04/13
9/01/23**
EP198
Imperial Oil and Gas A
Granted
100%
200
blocks
15528
N/A
10/01/13
9/01/23**
**Pending Ministerial determination of renewal application
Empire Energy Group Limited
On 12 April 2024, Empire announced it had divested all of its US oil & gas leases to PPP Future
Development Inc. Empire has retained an economic interest in the shale formations sitting below the oil &
gas leases which produce oil & gas from conventional reservoirs via the retention of a 3.75% free carried
working interest on all formations below the base of the Medina Sandstone formation. A full list of the
tenements previously owned by Empire in which the carried working interest applies can be found on the
Empire website at:
https://app.sharelinktechnologies.com/announcement/asx/b7cbffae643848735210c692a87786aa
Share your feedback
Discover